Rev to ONS Selected Licensee Commitments (SLC) Manual, Revising SLC 16.6.1, Containment Leakage Tests to Reflect Current Plant Configuration & Update Testing InfoML20095H129 |
Person / Time |
---|
Site: |
Oconee  |
---|
Issue date: |
12/05/1995 |
---|
From: |
Nix D DUKE POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML16141A984 |
List: |
---|
References |
---|
PROC-951205, NUDOCS 9512220141 |
Download: ML20095H129 (13) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20204B4141999-03-27027 March 1999 Revised Oconee Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20155C6391998-10-26026 October 1998 Proposed Tech Specs Tables 4.1-1 & 4.1-2,revised Surveillance Frequency of Refueling Outage to 18 Months ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20154C1021998-09-30030 September 1998 Proposed Tech Specs Changing UFSAR by Increasing Max Rod Internal Pressure in Spent Fuel Pool from 1,200 to 1,300 Psig ML20236V9611998-07-27027 July 1998 Corrected TS Bases Pages 3.5-30b of 961211 & 3.16-2 of 970205,correcting Amend Numbers ML20236T5171998-07-20020 July 1998 Proposed Tech Specs Re one-time Extension to Functional Test Frequencies for Hydraulic & Mechanical Snubbers ML20236R1901998-07-16016 July 1998 Proposed Tech Specs Extending TS Surveillances TS 4.20.2(a), Table 4.20-1,items 1,2 & 4,TS 4.1-1,Table 4.1-1,items 8,9,10 & 11 & TS 4.5.1.2.1,item b(1) ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML16141B0771996-11-18018 November 1996 Errata to TS 3.7,which Removes Criteria for Battery & Battery Charger Specific Svc Tests ML20134K5401996-10-31031 October 1996 Rev 6 to Chemistry Manual 5.1, Emergency Response Guidelines ML20117J0181996-08-15015 August 1996 Revised Chapter 16 of Oconee Selected Licensee Commitments Manual ML20095H1291995-12-0505 December 1995 Rev to ONS Selected Licensee Commitments (SLC) Manual, Revising SLC 16.6.1, Containment Leakage Tests to Reflect Current Plant Configuration & Update Testing Info ML20091P2461995-08-21021 August 1995 Rev to ONS Selected Licensee Commitments Manual ML16141A9291995-06-29029 June 1995 Proposed Tech Specs Re Mgt Positions Authorized to Approve Such Items as Procedures & Procedure Changes,Station Mods, TS Amends & Reportable Events ML16141A8581995-01-0909 January 1995 Revs to Oconee Selected Licensee Commitments Manual ML16141A8111994-04-20020 April 1994 Proposed Tech Spec Table 4.1-2, Min Equipment Test Frequency ML16141A7981994-04-12012 April 1994 Proposed Tech Specs Re Technical Review & Control Activities ML15261A4281994-02-24024 February 1994 Proposed TS 4.6, Emergency Power Periodic Testing ML15224A3521993-10-26026 October 1993 Safety Assurance Directive 6.1, Oconee Nuclear Site Safety Assurance Emergency Response Organization ML20044C9581993-05-0404 May 1993 Proposed TS 4.7.1, Control Rod Trip Time Test ML20045F0721993-04-0707 April 1993 Rev 9 to Corporate Process Control Program Manual ML20097D9451992-05-28028 May 1992 Rev 11 to Training & Qualification Plan ML20096C2561992-04-30030 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 46 to CMIP-1,Rev 39 to CMIP-4,Rev 45 to CMIP-5,Rev 49 to CMIP-6,Rev 48 to CMIP-7,Rev 42 to CMIP-9 & Rev 3 to CMIP-15 ML20096D5451992-04-0707 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 45 to CMIP-1,Rev 27 to CMIP-13 & Notification of Deletion of CMIP-8.Procedure CMIP-8 Reserved for Future Use ML16131A5241992-03-0101 March 1992 Rev 35 to ODCM Generic Section ML20092M5891992-02-0606 February 1992 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 43 to CMIP-1,Rev 43 to CMIP-5,Rev 33 to CMIP-8,Rev 25 to CMIP-13,Rev 6 to CMIP-18,Rev 4 to CMIP-22 & Rev 38 to CMIP-4 ML20094H2391992-01-0101 January 1992 Rev 33 to McGuire Nuclear Station Odcm ML20094H2511992-01-0101 January 1992 Rev 34 to Catawba Nuclear Station Odcm ML16131A5221992-01-0101 January 1992 Rev 32 to Oconee Nuclear Station Odcm ML20087F3931991-12-11011 December 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-11, Emergency Classification - Mcguire. W/ 920121 Release Memo ML20086K8831991-11-18018 November 1991 Public Version of Revised Crisis Mgt Implementing Procedures (Cmips),Including Rev 42 to CMIP-1,Rev 29 to CMIP-2,Rev 42 to CMIP-5,Rev 12 to CMIP-11 & Rev 37 to CMIP-21 ML20086G7711991-10-16016 October 1991 Public Version of Revs to Crisis Mgt Implementing Procedures (Cmip),Including Rev 41 to CMIP-1,rev 37 to CMIP-4,rev 41 to CMIP-5,rev 46 to CMIP-6 & CMIP-7,rev 32 to CMIP-8,rev 40 to CMIP-9,delete CMIP-12 & Rev 24 to CMIP-13 ML20082C7441991-06-11011 June 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20081J9841991-06-10010 June 1991 Rev 3 to EDA-1, Procedure for Estimating Food Chain Doses Under Post-Accident Conditions ML20076A7241991-06-10010 June 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 39 to CMIP-1,rev 28a to CMIP-2,rev 44 to CMIP-7,rev 39 to CMIP-9 & Rev 10 to CMIP-11 ML20081K0101991-06-0606 June 1991 Rev 8 to EDA-3, Offsite Dose Projections for McGuire Nuclear Station ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML16148A9621991-02-13013 February 1991 Public Version of Rev 10 to CMIP-12, Crisis Mgt Implementing Procedure ML20066G3621991-02-0101 February 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 28 to CMIP-2,Rev 34 to CMIP-4,Rev 38 to CMIP-5,Rev 43 to CMIP-6,Rev 42 to CMIP-7,Rev 29 to CMIP-8, Rev 37 to CMIP-9 & Rev 34 to CMIP-21 ML20082P7611991-01-0101 January 1991 Rev 30 to Odcm,Catawba Nuclear Station ML15217A1291991-01-0101 January 1991 Rev 29 to Odcm,Oconee Nuclear Station ML20072S9621991-01-0101 January 1991 Public Version of Rev 12 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20082P7711991-01-0101 January 1991 Rev 31 to Odcm,Mcguire Nuclear Station ML20072P9621990-11-0808 November 1990 Rev 9 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20028H2211990-10-31031 October 1990 Public Versions of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6 ML20059F4301990-08-22022 August 1990 Public Version of Rev 27 to Crisis Mgt Implementing Procedure CMIP-2, News Group Plan ML20063Q2721990-08-14014 August 1990 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8,Rev 35 to CMIP-9 & Rev 7 to CMIP-11 ML20043F4841990-05-23023 May 1990 Public Version of Crisis Mgt Implementing Procedures, Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17 1999-08-18
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20204B4141999-03-27027 March 1999 Revised Oconee Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML20134K5401996-10-31031 October 1996 Rev 6 to Chemistry Manual 5.1, Emergency Response Guidelines ML20117J0181996-08-15015 August 1996 Revised Chapter 16 of Oconee Selected Licensee Commitments Manual ML20095H1291995-12-0505 December 1995 Rev to ONS Selected Licensee Commitments (SLC) Manual, Revising SLC 16.6.1, Containment Leakage Tests to Reflect Current Plant Configuration & Update Testing Info ML20091P2461995-08-21021 August 1995 Rev to ONS Selected Licensee Commitments Manual ML16141A8581995-01-0909 January 1995 Revs to Oconee Selected Licensee Commitments Manual ML15224A3521993-10-26026 October 1993 Safety Assurance Directive 6.1, Oconee Nuclear Site Safety Assurance Emergency Response Organization ML20045F0721993-04-0707 April 1993 Rev 9 to Corporate Process Control Program Manual ML20097D9451992-05-28028 May 1992 Rev 11 to Training & Qualification Plan ML20096C2561992-04-30030 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 46 to CMIP-1,Rev 39 to CMIP-4,Rev 45 to CMIP-5,Rev 49 to CMIP-6,Rev 48 to CMIP-7,Rev 42 to CMIP-9 & Rev 3 to CMIP-15 ML20096D5451992-04-0707 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 45 to CMIP-1,Rev 27 to CMIP-13 & Notification of Deletion of CMIP-8.Procedure CMIP-8 Reserved for Future Use ML16131A5241992-03-0101 March 1992 Rev 35 to ODCM Generic Section ML20092M5891992-02-0606 February 1992 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 43 to CMIP-1,Rev 43 to CMIP-5,Rev 33 to CMIP-8,Rev 25 to CMIP-13,Rev 6 to CMIP-18,Rev 4 to CMIP-22 & Rev 38 to CMIP-4 ML20094H2511992-01-0101 January 1992 Rev 34 to Catawba Nuclear Station Odcm ML16131A5221992-01-0101 January 1992 Rev 32 to Oconee Nuclear Station Odcm ML20094H2391992-01-0101 January 1992 Rev 33 to McGuire Nuclear Station Odcm ML20087F3931991-12-11011 December 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-11, Emergency Classification - Mcguire. W/ 920121 Release Memo ML20086K8831991-11-18018 November 1991 Public Version of Revised Crisis Mgt Implementing Procedures (Cmips),Including Rev 42 to CMIP-1,Rev 29 to CMIP-2,Rev 42 to CMIP-5,Rev 12 to CMIP-11 & Rev 37 to CMIP-21 ML20086G7711991-10-16016 October 1991 Public Version of Revs to Crisis Mgt Implementing Procedures (Cmip),Including Rev 41 to CMIP-1,rev 37 to CMIP-4,rev 41 to CMIP-5,rev 46 to CMIP-6 & CMIP-7,rev 32 to CMIP-8,rev 40 to CMIP-9,delete CMIP-12 & Rev 24 to CMIP-13 ML20082C7441991-06-11011 June 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20081J9841991-06-10010 June 1991 Rev 3 to EDA-1, Procedure for Estimating Food Chain Doses Under Post-Accident Conditions ML20076A7241991-06-10010 June 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 39 to CMIP-1,rev 28a to CMIP-2,rev 44 to CMIP-7,rev 39 to CMIP-9 & Rev 10 to CMIP-11 ML20081K0101991-06-0606 June 1991 Rev 8 to EDA-3, Offsite Dose Projections for McGuire Nuclear Station ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML16148A9621991-02-13013 February 1991 Public Version of Rev 10 to CMIP-12, Crisis Mgt Implementing Procedure ML20066G3621991-02-0101 February 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 28 to CMIP-2,Rev 34 to CMIP-4,Rev 38 to CMIP-5,Rev 43 to CMIP-6,Rev 42 to CMIP-7,Rev 29 to CMIP-8, Rev 37 to CMIP-9 & Rev 34 to CMIP-21 ML15217A1291991-01-0101 January 1991 Rev 29 to Odcm,Oconee Nuclear Station ML20082P7711991-01-0101 January 1991 Rev 31 to Odcm,Mcguire Nuclear Station ML20072S9621991-01-0101 January 1991 Public Version of Rev 12 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20082P7611991-01-0101 January 1991 Rev 30 to Odcm,Catawba Nuclear Station ML20072P9621990-11-0808 November 1990 Rev 9 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20028H2211990-10-31031 October 1990 Public Versions of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6 ML20059F4301990-08-22022 August 1990 Public Version of Rev 27 to Crisis Mgt Implementing Procedure CMIP-2, News Group Plan ML20063Q2721990-08-14014 August 1990 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8,Rev 35 to CMIP-9 & Rev 7 to CMIP-11 ML20043F4841990-05-23023 May 1990 Public Version of Crisis Mgt Implementing Procedures, Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17 ML20043B2651990-05-0909 May 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7,Rev 26 to CMIP-8, Rev 33 to CMIP-9,Rev 2 to CMIP-14 & Rev 10 to CMIP-16 ML20043F4621990-04-20020 April 1990 Rev 5 to Oconee-specific Process Control Manual ML20006C0571990-01-18018 January 1990 Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan ML16152A8951990-01-0202 January 1990 Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations ML15264A1571990-01-0202 January 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML20012A3791990-01-0101 January 1990 Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station ML20012A3801990-01-0101 January 1990 Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations ML20011D2441989-12-0101 December 1989 Crisis Mgt Implementing Procedures ML20012A3731989-11-15015 November 1989 Rev 4 to, Process Control Program Oconee Nuclear Station ML19332C8451989-11-0101 November 1989 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 ML19325F1931989-11-0101 November 1989 Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations 1999-08-18
[Table view] |
Text
1 1
december 5, 1995 To: Manual Holders
Subject:
Oconee SLC Revision Please revise your SLC Manual according to instructions. This SLC 16.6.1 Containment Leakage Tests is being revised to reflect current plant configuration and to update testing information.
Please update your copy of this manual as follows:
Remove These Pages Insert These Pages:
LOEP 1 LOEP 1 LOEP 2 LOEP 2 16.6-1 16.6-1 16.6-2 16.6-2 16.6-3 16.6-3 16.6-4 16.6-4 16.6-5 16.6-5 16.6-6 16.6-6 16.6-7 16.6-7 16.6-8 16.6-8 16.6-9 16.6-9 16.6-10 1
Any questions concerning this revision may be directed to David Nix at 803-I 885-3634.
i David Nix.
Regulatory Compliance By: Conice Breazeale Regulatory Compliance t-
~ 9512220141 951205 PDR ADOCK 05000269 PDR p,,,. _
j
Oconee Nuclear Station Selected Licensee Commitments List of Effective Pages Page Revision Date Cover Letter LOEP 1 11/29/95 LOEP 2 11/29/95 LOEP 3 10/5/95 LOEP 4 10/5/95 LOEP 5 10/5/95 LOEP 6 10/5/95 LOEP 7 10/5/95 Tab 16.0 16.0-1 1/9/95 16.0-2 10/5/95 16.0-3 10/5/95 Tab 16.1 16.1-1 Tab 16.2 16.2-1 16.2-2 16.2-3 Tab 16.3 16.3-1 2/91 Tab 16.5 16.5-1 3/91 16.5-2 2/17/94 16.5-3 2/17/94 16.5-4 2/17/94 16.5-5 2/17/94 11/29/9f:
l Page 1
.~. _
- -~-. _ _. _
4 Nace No.
Revision Date 16.5-7 2/91 16.5-8 2/91 16.5-9 7/92 16.5-10 7/92 16.5-11 7/92 16.5-12 7/92 16.5-13 7/92 16.5-14 7/92 16.5-15 7/97 16.5-16 7/92 16.5-17 7/92 16.5-18 7/92 16.5-19 7/92 Tab 16.6 16.6-1 11/29/95 16.6-2 11/29/95 16.6-3 11/29/95 16 6-4 11/29/95
)
16.6-5 11/29/95 16.6-6 11/29/95 16.6-7 11/29/95 16.6-0 11/29/95 16.6-9 11/29/95 16.6-10 11/29/95 Tab 16.7 I
16.7-1 16.7-2 11/29/95 Page 2
_ _ _. _... _. _ _. _.. _ _ _. -. _ _ _. ~... _. _. _. _.. _ _ _.. _
's 4
16.6 ENGINFFRFn SAFETY FEATURES 16.6.1 CONTAINMENT LEAKAGE TESTS COMMITMENT The loca) l sk rate shall be measured for the containment penetrations listed in Table 16.6-1 in accordance with Technical Specification 4.4.1.2.
APPLICABILITY:
Applies to containment leakage ACTION:
Not applicable SURVEILLANCE:
See Technical Specification 4.4.1.2 BASES:
This commitment establishes t. ilist of penetrations that require local leak rate testing in accordance with Technical Specification 4.4.1.2. This list was removed from the Technical Specifications in accordance with the guidance in NRC Generic Letter 91-08.
REFERENCES:
1.-
10 CFR 50, Appendix J 2.
NRC Generic Letter 91-08 3.
FSAR Topic Nos. 3.8.1.7.4, 6.2.3, and 6.2.4.
STATION MANAGER APPROVAL DATE l1-R-15 16.6-1 11/29/95
TABLE 16.6-1
{
LIST OF PENETRATIONS WITH 10CFR50,
~
APPENDIX J TEST REQUIREMENTS l
PENETRATION TYPE A TEST LOCAL LEAK NUMBER.
SYSTEM SYSTEM CONDITION TEST REMARKS-i 1
Pressurizerliquid sample line Note 1 Type C Note 2,7b (Unit 1 only)
]
2 OTSG A Sampleline Note 1 Type C Note 7b 3
Component Cooling inlet line Note 1 Type C
. Note 3, 7d
[
4 OTSG B drain line Note 1 None required Note 7b 5a RB normal sump drain line Note 10 Type C Note 7a,7b,9 Sb Post Accident Liquid Sample Line Note 1 None Required Note 2,7c j
6 Letdown line Note 1 Type C Note 2, 7b.
l 7
RC Pump seal return line Note 1 Type C Note 7b,9(Units 2 & 3)
[
Note 3,7b,9 (Unit 1) l t
8a Pressurizer Aux. Spray Line Not Vented None Required Note 5,7d f
i i
8b Loop A nozzle warming line Not Vented None required Note 5,7d i
9 RCS normal makeup line and HP Not Vented None required Note 5 l
l injection 'A' loop j
l I
10a RC Pump B1 sealinjection Not Vented Type C Note 5, 7d, 9,12 i
f 16.6-2 11/29/95 r
I s
m
i TABLE 16.6-1 l
LIST OF PENETRATIONS WITH 10CFR50, f
APPENDIX J TEST REQUIREMENTS PENETRATION TYPE A TEST LOCAL LEAK
]
NUMBER SYSTEM SYSTEM CONDITION TEST REMARKS I
10b RC Pump B2 sealinjection Not Vented Type C Note 5,7d,9,12 11a Fuel transfer tube cover Not Vented Type B Note 6a,11 11b RC Makeup Pump suction Note 1 Type C Note 2 l
t llc Fuel transfer tube drain Not Vented Type C Note 5 12a Fuel transfer tube cover Not Vented Type B Note 6a,11 f
12b RC Makeup Pump discharge Note 1 Type C Note 2 I
13 RB Sprayinlet line Not Vented None required Note 5,7d
[
14 RB Spray inlet line Not Vented None required Note 5,7d i
15 LPI and DHR inlet line Not Vented None required Note 4,5 f
16 LPI and DHR inlet line Not Vented None required Note 4,5 I
l 17 OTSG B Emergency FDW line Not Vented None required Note 5,7d l
t i
18 Quench tank vent line Note 1 Type C Note 3, 7b,9 19 RB purge inlet line Vented Type C Note 7a,7b,9
[
I f
16.6-3 11/29 S 5 l
3 f
TABLE 16.6-1 l
LIST OF PENETRATIONS WITH 10CFR50, APPENDIX J TEST REQUIREMEN FS PENETRATION TYPE A TEST LOCAL LEAK NUMBER SYSTEM SYSTEM CONDITION TEST REMARKS 20 RB purge outlet line Vented Type C Note 7a,7b,9 21 LPSW to RC Pump motors and lube Not Vented None required Note 7b, 9 oil coolers inlet 22 LPSW from RC Pump motors and Not Vented Type C Note 7b lube oil coolers outlet 23a RC Pump Al sealinjection Not Vented Type C Note 5,7d,9 23b RC Pump A2 sealinjection Not Vented Type C Note 5,7d,9 24a RB H Analyzer Train A Vented Type C Note 7c 2
24b RC H Analyzer Train A Vented Type C Note 7c 2
25 OTSG B Feedwater line Not Vented None required Note 5 26 OTSG A Main steam line Not Vented None required Note 5 27 OTSG A Feedwaterline Not Vented None required Note 5 28 OTSG B Main steam line Not Vented None required Note 5 16.6-4 11/29/95
TABLE 16.6-1 LIST OF PENETRATIONS WITH 10CFR50,
' APPENDIX J TEST REQUIREMENTS PENETRATION TYPE ATEST LOCAL LEAK NUMBER SYSTEM SYSTEM CONDITION TEST REMARKS 29 Quench tank drain line Note 1 Type C Note 3,7b,9 30, LPSW for RB Not Vented None required Note 5 31, Cooling units 32 inlet line 33, LPSW for RB Not Vented None required Note 5 34, cooling units 35 outlet line 36, RB emergency sump recirculation line Not Vented None required
- Note 5 37 38 Quench tank coolerinlet line Note 1 Type C Note 2, 7d,12 39a (Unit 2,3 CFT Vent Line Note 1 None Required Note 3 only) 39b HP Nitrogen supply Note 1 Type C -
Note 2,3, 13 40 RB emergency sump drain line Note 1 None required 41 Instrument air supply & ILRT Vented None required Note 3 verification line 16.6-5 11/29/95
1 1
TABLE 16.6-1 LIST OF PENETRATIONS WITH 10CFR50, APPENDIX J TEST REQUIREMENTS PENETRATION TYPE A TEST LOCAI, LEAK NUMBER SYSTEM SYSTEM CONDITION TEST REMARKS 42a RB H Analyzer Train B Vented Type C Note 7c 2
42b RB H Analyzer Train B Vented Type C Note 7c 2
43 OTSG A drain line Note 1 None required Note 7b 44 Component cooling to control rod Note 1 Type C Note 3,7d drive inlet line 45a ILRT instrument line Vented Type C Note 3, 7a 45b ILRT instrument line Vented Type C Note 3, 7a 45c (Units 2 & 3) ILRT instrument line Vented Type C Note 3, 7a 46 Reactor head-wash filtered water inlet Note 1 Type C Note 3,9 47 (Unit I only)
Demineralized water supply to RC Note 1 Type C Note 3, 7d pump seal vents 48 Breathing air inlet Vented Nonc required Note 3 49 (Unit I only)
LP Nitrogen supply Vented None required Note 3 16.6-6 11/29/95
TABLE 16.6-1 LIST OF PENETRATIONS WITH 10CFR50, APPENDIX J TEST REQUIREMENTS PENETRATION TYPE A TEST LOCAL LEAK NUMBER SYSTEM SYSTEM CONDITION TEST REMARKS 50 OTSG A Emergency FDW line Not Vented None required Note 5 51 ILRT Pressurization line Vented None required Note 6a,7a 52 HP Injection to 'B' loop Not Vented None required Note 5 53a (All)
HP Nitrogen supply to 'A' core flood Note 1 Type C Note 2, 3, 7d,13 tank 53b (Units 2,3)
LP Nitrogen supply Vented None required Note 2,3, 7d 54 Component cooling outlet line Note 1 Type C Note 3, 7b, 9(8) 1 55 Demineralized water supply Note 1 Type C (Unit 1) Note 3,12 (Unit 2,3) Note 3,9 56 Spent fuel canal fill and drain Note 1 None required Note 3 57 (Unit I only)
DHR return line Not vented None required Note 4 58a (Unit 2,3)
Pressurizer sample line Note 1 Type C Note 2, 7b I
58b (All)
OTSG B sample line Note 1 Type C Note 7b i
r 16.6-7 11/29/95 l
1
=
1 TABLE 16.6-1 LIST OF PENETRATIONS WITH 10CFR50, APPENDIX J TEST REQUIREMENTS 4
TYPE A TEST LOCAL LEAK l
PENETRATION SYSTEM SYSTEM CONDITION TEST REMARKS NUMBER
{
59 CF tank sample line Note 1 None required Note 2 l
60 RB sample line (outlet)
Note 1 Type C Note 2, 7b, 9 61 RB sample line (inlet)
Note 1 Type C Note 2,7b,9 62 (Units 2,3 DHR return line Not Vented None required Note 4 l
Only) 90 Personnel hatch Vented Type B Note 6b 91 Equipment hatch Vented Type B Note 6c 92 Emergency hatch Vented Type B Note 6b 101 through 105 Electrical Penetrations Vented Type B Note 6a,12 l
16.6-8 11/29/95
L a
1 TABLE 16.6-1 (NOTES) -
[
NOTE 1 All vented systems shall be drained of water or other fluids to the extent necessary to assure exposure of the system 7
l containment isolation valves to containment atmosphere and to assure they will be subjected to the test differential -
pressure.
NOTE 2 Fluid system that is r :t of the reactor coolant pressure boundary or open directly to the containment atmosphere under post-accident conditons (vented to containment atmosphere during Type A test).
NOTE 3 Closed system inside containment that penetrates containment and postulated to rupture as a result of a loss of coolant accident (vented to containment atmosphere during Type A test).
i i
NOTE 4 System required to maintain the plant in a safe condition during the test (need not be vented).
j NOTE 5 System normally filled with water or under pressure and operating under post-accident condition (need not be vented).
i m
Containment penetration whose design incorporates resilient seals, gaskets, or sealant compounds, piping NOTE 6 a.
penetration filled with expansion bellows, and electrical penetrations fitted with flexible metal seal assemblies.
{
L b.
Air lock door seals including door operating mechanisms which are part of the containment pressure boundary.
l c.
Doors with resilient seals or gaskets except for seal welded doors.
{
d.
Components other than those above which must meet the acceptance criteria of Type B tests.
[
Isolation valves provide a direct connection between the inside and outside atmospheres of the primary reactor i
NOTE 7 a.
containment under normal operation, such as purge and ventilation, vacuum relief, and instrument valves.
b.
Isolation valves are required to close automatically upon receipt of a containment isolation signal in response to controls intended to affect containment isolation.
l i
16.6-9 11/29/95 l
1 o
t
TABLE 16.6-1 (NOTES) c.
Isolation valves are required to operate intermittently under post accident conditions.
d.
Check valve (s) used for containment isolation.
NOTE 8 DELETED NOTE 9 Reverse direction test ofinside containment isolation valve authorized. Leakage results are conservative.
NOTE 10 System is submerged during post-accident conditions and performance of Type A test. System will be drained to the extent possible.
NOTE 11 Type B test performed on the blind flanges inside the Reactor Building. Valves outside the containment are not tested.
NOTE 12 A one-time extension from the local leak test and corresponding exemption from Section III.D.2 and III.D.3 of Appendix J to 10 CFR Part 50 is granted such that it be performed during the 1983 Unit I refueling outage, provided that such outage begins nc later than July 16,1983.
NOTE 13 The requirements to perform a Type A test in accordance with Notes 1 and 3 of Table 4.4-1, will commence during the end ofcycle 12 refueling outage on Unit 1, and during the end of cycle 1I refueling outages on Units 2 and 3. For the Type C test, the initial test will be performed on Unit I during the end ofcycle 12 refueling outage, on Unit 2 no later than January 15,1990, and during the end ofcycle 11 refueling outage, on Unit 3. On Units 2 and 3, until Type C testing is performed, these penetrations may be utilized provided that compensatory measures described in W. H.
Owen's September 29,1989 letter and H. B. Tucker's October 4,1989 letter are implemented.
16.6-10 11/29/95
..