Proposed Tech Spec 6.4,incorporating Operating Procedure Requirements Re B&W Small Break ECCS Analysis
ML19312B797
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/27/1978
From:
DUKE POWER CO.
To:
Shared Package
ML19312B795 List:
References
NUDOCS 7911190580
Download: ML19312B797 (1)


Text

.

,T A

J LJ

  • 6. 4 STATION OPERATING PROCEDURES Specification 6.4.1 The station shall be operated and maintained in accordance with approved procedures. Written procedures with appropriate check-off lists and instructions shall be provided for the following conditions:

a.

Normal startup, operation and shutdown of the complete facility and of all systems and components involving nuclear safety of the facility.

I b.

Refueling operations.

c.

Actions taken to correct specific and foreseen potential malfunctions of systems or components involving nuclear safety and radiation levels, including responses to alarms, suspected primary system leaks and abnormal reactivity changes.

d.

Emergency procedures involving potential or actual release of radioactivity.

^

e.

Preventive or corrective maintenance which could affect nuclear safety or radiation exposure to personnel.

f.

Station survey following an earthquake.

g.

Radiation control procedures.

h.

Operation of radioactive waste management systems.

1.

Control of pH in recirculated coolant af ter loss-of-cdolant accident.

Procedure shall state that pH will be measured and the addition of appropriate caustic to coolant will commence within 30 minutes after switchover to recirculation = ode of core cooling to adjust the pH to a range of 7.0 to 8.0 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

j.

Nuclear safety-related periodic test procedures.

~k. 'Long-term emergency core cooling systems.

Procedures shall in-clude provision for remote or local operation of system components necessary to establish high and low pressure injection within 15 l

minutes after a line break.

1.

Fire Protection Program implementation.

6.4.2 Quarterly selected drills shall be conducted on site emergency procedures including assembly preparatory to evacuation off. site r.nd a check of the adequacy of communications with off-site support groups.

6.4.3 A respiratory protective program, approved by. the Coc: mission shall be in force.

'7911190 N O 6.4-1;