VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR 198L SUBMITTED:

Doke/~

SUPERyENDENT-OPERATIONS

-e

  • APPROVED:

e, 8002100 57'l

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 2/1/80 COMPLETED BY W. R. Madison TELEPHONE 703 894-5151 '

OPERATING STATUS N*8

1. Unit Name: North Anna lInit 1
2. Reportmg Period: Januarv 10RO
3. Licensed Thermal Power (MWt): 2776 *

= -

4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 007
6. Maximum Dependable Capacity (Gross MWe): 928
7. Maximum Dependable Capa::2ty (Net MWe): 898
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,If Any (Net MWe): NA
10. Reasons For Restrictions. If Any: N4

\

This Month Yr..to.Date Cumulative l1. Hours In Reporting Period 744 744 1a'971

12. Number Of Hours Resctor Was Critical 147 a 7dl 4 10 ROR 6
13. Reactor Reserve Shutdown Hours 30 30 178.3
14. Hours Generator On-Line 202.8 202.8 10,256
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Genented (MWH) 206.696 206.696 26.486.609
17. Gross Electrical Energy Generated (MWH) 52,764 _,

'i?~764 8.199.111

18. Net Electrical Energy Generated (MWH) . 44,468 44,468 7,897,914
19. Unit Semce Factor 27.3 27.3 70.6
20. Unit Artilability Factor 27.3 27.3 70.6
21. Unit Capacty Factor (Using MDC Net) 6.7 6.7 60.6
22. Unit Capacity Factor (Using DER Net) 6.6 6.6 60. 0
23. Unit Forced Outage Rate 3.9 3.9 3.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): .'

NA

25. If Shur Down At End Of Report Period. Estimated Date of Startup: Na
26. Units In Test Status t Prior to Commercial Opentioni: Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (of;7)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA 1 DATE 2/1/80 COMPLETED BY W. R. Madison 7 TELEPHONE (703)894-5151 e 4

MONTH .h n > > wy s o on .,

7 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) p:

1 0 17 0 g 2 0 Is 0 E 3 0 19 0- ),

4 0 t

20 0 5 0 21 0 i

6 0 88 22  ;

7 0' 23 24 8 0 24 161 9 0 210 25 i

10 0 214 26 II 0 209 27 12 0 224 23 13 O 245 29 14 0 159 30 15 0 31 320 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

,p.- g. . - ~ .. y w . .x v.a.r. ,_ m u , . . . .. a ,

.a - -~ . -

I C ET 0.

50-338 UNITSilUIDOWNS AND POWER REDUCT10NS north Anna Unit #l

' ) urrt /1/80 REPORT ht0N1ll JANUARY 1980 COMPLETED BY A f: h u 'gr_

j

' TELEPIIONE 703-8 -

5 . x 288

\

i .

-, ,5 g #h Eicensee [*t, Cause & Corrective No. D.ite Q 3g ( )[y 5 Event g3

l Action in H yE y gg Report # to O Prevent Recurrence i

d I

. SHUTDOWN 78-10 contin Jes f ar 510. 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> into Januar / when thc generator was placed in service.

4 80-01 800116 F 0.0* A* 1 High vibration "A" reactor coolant pump. Tightened 1 coupling nut.

80-02 800117 F 0.0* A* 1 Balance "A" Reactor Coolant Pump 80-03 800l17 F 0.0* A* 1 Balance "A" Reactor Coolant Pump i 80-04 800118 F 0.0* G* 3 Voltage spike during reactor pro-tection periodic test cause a loss oi

,i P-7 causing reactor trip.

je 80-05 800119 S 0.0* B 3 Scheduled test trip during low power physics testing.

l 80-06 800122 S 21.9 B 1 Scheduled shutdown for turbine over- <-

i speed test and maintenance on nuclear g instrumentation.

80-07 800129 F 8.4 H 3 Loss of feedwater due to clogged con-densate pump' suction strainers.

Cleaned the strainers.

I 2 3 4 E: Forced Reason: Method: Exhihlt G . Instrucilons S: Scheduled A. Equipment Failure (Explain), I Manual for Preparation of Data H Maintenance or Test 2 Manual Scram. Entry sheets for (.icensee C Refueling 3 Automatic Scram. Event ReporI (EER) Elle (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

. E Operator Training & License Examination 1 F-Administrative 5

. (; Operational Error (Explain) Exhibil 1 S:me Sourte 19/77) Il-Olher (Explain) l,

  • SEE ATTACHED SHEET

- - Page 1 of 1 F

[$

UNIT SHUTDOWN AN0 POWER REDUCTIONS EXPLANATION SHEET DOCKET N0.50-338 REPORT MONTH Jan. UNIT NAME North Anna YEAR 1980 DATE 2-1-80 COMPLETED BY A. G. Neufer 9 L

80-01 thru 80-03 (A) (0.0*) Turbine generator was not in service at the k time of the above reactor shutdowns due to low power physics testing I which are required after refueling. Technical Specifications require Il the reactor to be shut down when less than 3 reactor coolant pumps are S operable. 7

,t 80-04 (G) Voltage spike caused during perfomance testing of PT-1447 first j stage turbine pressure defeating the block of P-7 (at power trips) the }

reactor tripped because the turbine was not latched. m k

80-05 (00*) This trip was plannned as part of low power physics testing.  ;

80-07 (H*) Small mesh strainer are temporarially installed in the suction l of the condenser pumps as part of the post maintenance clean up f e f fort. The B pump was out of service and one pump strainer was being ';

cleaned when the remaining strainer clogged up causing a trip of the  :.

feedwater pumps. This caused steam generator water level to go low l causing the reactor trip.

- t

, t 8

.