Forwards Response to IE Bulletins 79-02 & 02,Revision 1. Results of Investigation for Effects of Flexibility on Pipe Support Base Plate Anchors Indicate That Prying Forces Did Not Exist.Original Design Acceptable
ML19276G961
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/05/1979
From: Crews E
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7908310111
Download: ML19276G961 (14)


Text

4 south CAROLINA ELECTRIC a gas COMPANY ] ~

.os, orrice so. ve. r_ [

COLUMBIA. SOUTH CAROLS?.A 29216 _- ., g q r.)

E. H. Ca tw s. J n. _

July 5. 1979 'm v,cc , ..

. n.... ..., . c....

. . c. .c,.

. c . . '.'. .

p w.

co cc Mr." James P. O'Reilly, Director United States Nuclear Regulatory Commission -

Region II 101 Marietta Street, N. W.

Atlanta, Georgia 30303 Subj ect: Virgil C. Summer Nuclear Station Inspection & Enforcement Bulletin 79-02/79-02 Rev. 1 Docket No. 50-395 Nuclear Engineering File 2.8950

Dear Mr. O'Reilly:

South Carolina Electric & Gas Company has reviewed IE Bulletin 79-02 dated March 8, 1979, and IE Bulletin 79-02 Revision 1 dated June 21, 1979, and submits the attached written response as required.

Should you have further quest nq concerning this matter, please contact us.

Ve 1 ly yours, i

/ rews, Jr.

E. H.

RW:EHC:md CC: Office of Inspection & Enforcement Washington, D. C.

b .) )hh

]

70 08310lli g[05/8

.- AL COPr

V. C. SUMMER NUCLEAR STATION

. UNIT 1 NRC IE BULLETIN 79-02 XEVISION 1

1.0 INTRODUCTION

A design review was performed in response to the United States Nuclear Regulatory Commission (NRC) request, IE Bulletin No. 79-02, " Pipe Support Base Plate Design Using Concrete Expansion Anchor Bolts," dated March 8, 1979, and Revision 1, dated June 21, 1979, for Virgil C. Summer Nuclear Station, Unit 1, Docket No. 50-395. The review was performed on a repre-sentative sample of safety-related supports (Seismic Category I). Possible effects of base plate flexibility on base plate anchors were considered.

This report presents the methods and results of the review.

2.0

SUMMARY

AND CONCLUSION 2.1 Summary of Design Review

1. Most p3..es were determined to be flexible as defined by the NRC 2:1 ratio criteria. Therefore, plates were reanalyzed using a method in which the effects of plate flexibility, anchor preload, and shear-tension interaction were considered.
2. A representative sample totaling ninety-six (96) pipe support base plates for pipe of a diameter 2 1/2" and larger, all anchored with Hilti " Kwik Bolts", was reanalyzed. Of the ninety-six (96) supports studied, cue (1) had a factor of safety less than 3.0 (actual value = 2.98), three (3) had a factor of safety between 3.0 ar.d 3.5, and six (6) exhibited a factor of safety between 3.5 snd 4.0. The factors of safety less than 4.0 were determined to exist only for the faulted and upset load combinations.
3. All Seismic Category I supports are potentially subject to a relatively low number of seismic loading cycles which can be accommodated by the design. Operational loads which could, during the lifetime of the plant, undergo a large number of load cycles will be identified during 2035 i95 1 ,
+ '

, - , ,i, ,

('

j ' s  !i '

e

  • " 4 startup (est.ing, and modifications co the pipe support syste.n will be ,

made as requ1 red tk assure that such loads are eliminated.

7  ;

2.2 Summary of QC ikgumentation OR of In-Place Inspection QC procedures provide for inspac: ion requirements as discussed in Section 3.4.

t At the Virgil C.' Summer Nuclear Station', QC documentation that design re-qui,rements have been met exists for 100% of the expansion bolts.

2.3 Conclusion s

The results of the inveMigation for the effects of plate flexibility on

- s pipe support base plate anchors indicate that, for mo.t plates anchored to concrete surf aces with Hilti " Kwik Bolts", pryins 2arcas did not exist.

Prying forces were f ound to be present on four (4) of the ninetvysix (96) plates considered and in tho e cases the prying was ret.ponsible for an average increase in the bolt tension of Jess than lDT. It is also seen that the factors of safety of the swqures reanaly,ted meet the minimum .

established by IE Bt11etin 79-02 in mort cases, with ihe vnly exceptions > ,

existing for the faulted and upset load combinations. Under these condi-tions, the factors of. 'sahty are conservativ'e. Since QC inspection is made on 100% of all expansion bolts, the resulte of this reanalysis confirm the adequacy of the original design. \

q 3.0 REVIEW RESULTS'I In consideration of the 'rsquested action, a representative sampling of base plates for large bore'(2 1/2" and larger) Seismic Category 7 pipes was re-analyzed. There are appro'xIm. ely seven hundred (700) base plates in the plant which fit this c'ategory, a'n4 ninety-six (96) have been investigated.

/'

Small bore (2" and smaller diameter) pipe was originally designed using a seismic support spacing er teria. That c:1:eria were developed based on a

? I i

\

conservative pipe stre.-ss snd a multi-span model for each pipe si.:e and

( ,'

\ <

2035 196 s 2 ,

Q -f

schedule. The model analysis provides pipe spans and support loads. This approach has been verified by sample computer analyses to be conservative relative to applicC le Code requirements. -

A serier of typical support designs was generated and load rated by analy-tical techniques. The supports were analyzed for structural adequacy for all-members, welds and the expansion anchor bolts. In generating the load rating, the most conservative combination of the maximum distance from the pipe to the structure and the smallest allowed spacing between expansion anchor bolts was used.

As a result of this conservative approach, if 15% or more of the supports on any of the small bore piping runs would fail, the piping stresses would still remain within Code allowables. Therefore, detailed analyses and in-spection of these expansion anchor bolts is considered unnecessary.

3.1 Response to NRC Item 1 Base plates were considered rigid in the original design. For reexamination of the base plates considering plate flexibility, procedures were developed for the analysis of the plates and anchorages for moment and axial load ap-plied to the plate surfaces (Figures 1, 2, 3 and 4).

Wedge anchors were installed in accordance with manufacturer's recommendations.

Bolts were torqued to the degree necessary to ensure a preload equal to or Breater than the allowable working load on the bolt. A field test program was conducted to establish for each bolt size the torque value required to ensure the required level of bolt tension.

The magnitude of the residual preload directly influences the plate rotation at the anchor, and full fixity against anchor rotation is obtained when:

(Tg -V) (L) = V

  • 2

?035 197 3

Where Tg = Anchor residual preload V = Plate shear L = Effective edge distance of the plate from the tensile anchors e = Distance from the edge of the attachment to the tensile anchors With full fixity against nachor rotatir... the plate deflection transverse to the surface of the plate at the face of the attachment is the same as

~

support settlement of a member fixed at both ends.

As long as preload exceeds plate shear, some resistance to anchor rotation exists. When T < V, there is free rotation of the plate at the anchor, and the plate deflects as a cantilever.

Preloaded wedge anchors have a remory of their ma imum load and will not experience inelastic displacements until a load larger than the installation preload occurs. At loadings less than the installation preload, the anchors will function essentially elastically even though the actual loading exceeds the residual prelond on the anchor. If the actual load is less than the residual preload, the bolt is essentially prestressed, and the stress re-mains approximately constant under this load. The performance of a pre-loaded wedge anchor is the same under dynamic as under static loadings; that is, the anchor will not experience inelastic displacements (1. addition to that which occurs during installation) until the anchor is subjected to a load greater than the installation preload.

Based on the plate and anchor response as described above, procedures were developed to determine tensile forces in the anchors, as shown in Figures 1, 2, 3 and 4. Shear and tension effects were combined directly to evaluate the factor of safety of the anchors, with the shear force being distributed equally to all anchors in the connection. The method of combining these effects is described in Section 3.2.

. 03.5 l98 4 ,

3.2 Response to NRC Item 2 The concrete expansion anchor bolts used at V. C. Summer, Unit 1, are the

" Kwik Bolts" as manufactured by Hilti, Inc. This is a wedge type anchor for which NRC Item 2(a) specifies a minimum factor of safety of four (4). The results of the reanalysis are su=marized in attached Tables 1 & 2.

The f actor of safety against failure (F.S.) is conservatively determined using the following shear-tension interaction equation:

(F.S.) (T ) (F.S.) (Sg )

+ = 1 (T,) (S,)

Where: F.S. = factor of safety against failure T = Tension force induced into an anchor (considering 0 plate flexibility)

T e ultimate tension capacity of an anchor

  • S g

= Shear force induced into an anchor S, = ultimate shear capacity of an anchor *

  • From manufacturer's static load tests Expansion boS placement in the structure is governed by the following criteria:
a. A minimum edge distance between the bolt centerline and the edge of a concrete member equal to 5d or 4 inches, whichever is greater.
b. A minimum spacing between adjacent bolts on each base plate of 10d, where d is the diameter of the bolt, unless otherwise approved by the Engineer. Also, due to various field installation problems udth locations of adjacent base plates, there is a small percentage (estimated at less than 3% of all cttachments) of occurrences where the minimum spacing of 10d has not been maintained between anchor bolts of adjacent plates. This situation is presently being investigated and such occutrences will be evaluated on a case by 7035 199

case basis for design adequacy.

3.3 Response to NRC Item 3 Pipe support reactions are generated as an output of a dynamic analysis and are utilized for the design of the individual pipe supports. Therefore, theoretically, a dynamic amplification factor was not required.

However, to provide for the effects of hardware and erection tolerances, the OBE seismic part of the reaction is multiplied by a factor of 1.5 to produce a design load. This factor provides additional design margin on the dynamic part of the loads.

The governing load combination including the 1.5 factor is:

Deadweight + Thermal + (1.5) OBE + Occasional 5 Allowable Seismic Mechanical Anchor Loads Bolt Load In order to ensure cyclic load carrying capability, wedge type anchors are installed by applying a torque of sufficiant magnitude to set the wedges at a bolt preload equal to or greater *.han the maximum allowable working load.

3.4 Response to NRC Item 4 (a) As described in Section 3.3, in order to ensure cyclic load carrying capability, vedge type anchors are installed by applying a torque of suf ficient magnitude to set the wedges at a bolt preload equal to or greater than the maximum allowable working load. Also, a field test program was conducted which established for each bolt size the torque value required to ensure the required level of bolt tension. The QC inspection requirements are described in sub-item (b) below where it is stated that documentation exists for 100% of the expansion bolts on the torque value applied in the field. This level of inspection verifies that the design requirements have been met for each anchor bolt.

It is also noted that there are no shell type anchor bolts being used at the Virgil C. Summer Nuclear Station.

703S 200 6 '

(b) The design specification and associated QC procedures require inspection In addition, of expansion bolts relative to the installation criteria.

all bolts in one out of every ten connections, but not less than 10%

of the connections made by each crew, shall be inspected for compliance with skewness. Connections shall also be inspected for bolt tightness with a calibrated manual torque wrench in not less than 10% of the con-nections made by each crew.

The above are the minimum inspection requirements; however, for the Virgil C. Summer Nuclear Station, QC documentation that design require-ments have been met exists for 100% of the expansion bolts as follows:

bolt hole location, cleanliness of hole, depth of hole, bolt size and length, depth of grout, bolt torque and skewness.

Based upon the requirements of IE Bulletin 79-02, for all subsequent expansion bolt installations the QC inspection checklist will include bolt spacing within the plate and to adjacent holes, minimum embedment depth and thread engagement. We do not feel that it is necessary to verify the embedment depth and thread engagement for existing instal-lations due to the 100% inspection program already in effect.

At the Virgil C. Summer Nuclear Station, base plates which have been grouted were raised from the supporting surface by shims and washers. Leveling nuts were not used.

2035 20l 7

TABLE 1 RESULTS OF BASE PLATE ANCHOR REANALYSIS UPSET LOAD COMBINATION Anchor Factor of Anchor Factor of Mark Size O Safety Mark Size 0 Safety Smi-220 5/8 19.3 RHH-215 Dia. Leg 3/4 4.25 CCH-474 Vert. Leg 5/8 10.7 RHH-233 3/4 10.28 CCll-474 Dia. Leg 5/8 7.7 RHH-125 3/4 35.9 CSH-185 5/8 10.2 Smi-116 Ver t. Leg 3/4 15.84 SPil-291- 5/8 8.0 SLH-116 Dia. Leg 3/4 9.00 CCH-475 5/8 10.1 SMI-139 3/4 10.9 SMI-203 5/8 11.9 SkT-078 3/4 24.43 FMi-225 5/8 11.2 SWH-067 3/4 5.7 CCH-773 3/4 6.2 SWH-065 3/4 11.13 CSH-196 3/4 14.3 RHH-281 3/4 7.6 SWH-204 3/4 3.28* RHH-105 3/4 12.2 CCH-297 3/4 22.4 RHH-108 Vert. Leg 1 9.14 SMI-207 3/4 5.67 RHH-108 Dia. Leg 1 4.96 CCH-473 3/4 12.3 RHH-216 Vert. Leg 1 7.47 Smi-114 Vert. Leg 3/4 5.7 RHH-216 Dia. Leg 1 4.39 SMI-ll4 Dia. Leg 3/4 6.5 RHH-267 1 21.6 FMi-253 1 13.4 RHH-280 1 33.6 FMi-218 1 9.0 SWH-138 Vert. Leg 1 4.05 SWH-218 1 3.52* SWH-133 Dia. Leg 1 4.19 FMi-262 1 3.57

  • SMi-124 1 6.5 Fmi-255 1 5.10 RHH-283 Vert. Leg 1 35.11 Smi-138 Vert. Leg 1 5.20 RHH-283 Dia. Leg 1 52.66 SWH-138 Dia. Leg 1 6.00 RHH-185 Vert. Leg 1 7.12 RHH-263 Vert. Leg 1-1/4 12.5 RHH-185 Dia. Leg 1 3.79*

RHH-263 Dia. Leg 1-1/4 9.2 RHH-268 1 9.56 MSH-226 5/8 23.92 RHH-263 Vert. Leg 1-1/4 11.97 MSH-244 5/8 38.27 RHH-263 Dia. Leg 1-1/4 9.18 MSH-207 5/8 21.99 RHH-204 Vert. Leg 1-1/4 9.1 MSH-216 5/8 27.17 RHH-204 Dia. Leg 1-1/4 4.95 MSH-167 5/8 15.53 RHH-173 1-1/4 5.07 MSH-272 5/8 5.89 MSH-218 3/4 27.25 MSH-057 3/4 5.82 MSH-062 3/4 2.98*

70.42 r ')

MSH-246 Vert. Leg MSH-246 Dia. Leg 1

1 39.5

'T)0 '3 d /02 MSH-158 Vert. Leg 1 47.15 MSH-158 Dia. Leg 1 26.53 MSH-250 Vert. Leg 1 7.75 MSH-250 Dia. Leg 1 6.53 MSH-183 Vert. Leg 1 6.17 MSH-183 Dia. Leg 1 4.58 RHH-102 Vert. Leg 5/8 53.6 RHH-102 Dia. Leg 5/8 39.5 RHH-269 5/8 11.0 RHH-173 Vert. Leg 3/4 13.8 RHH-215 Vert. Leg 3/4 7.78

TABLE 2 RESULTS OF BASE PLATE ANCHOR REANALYSIS FAULTED LOAD COMBINATION Anchor Factor of Mark Size O Safety RHH-263 Vert. Leg 1-1/4 4.00 Rint-263 Dia. Leg 1-1/4 3.7

  • MSH-246 Vert. Leg 1 6.04 MSH-246 Dia. Leg 1 3.39*

MSil-158 vert. Leg 1 6.04 MSH-158 Dia. Leg 1 3.39*

RHH-269 5/8 6.99 RHH-173 Vert. Leg 3/4 9.9 RHH-281 3/4 5.54 RHH-267 1 5.6 EHH-280 1 17.6 RHH-283 Vert. Leg 1 28.43 RHH-283 Dia. Leg 1 42.66 RHH-185 Vert. Leg 1 7.73 RHH-185 Dia. Leg 1 4.11 RilH-268 1 4.1 RHH-263 Vert. Leg 1-1/4 4.01 RHil-263 Dia. Leg 1-1/4 3.7

  • RHH-173 Dia. Leg 1-1/4 3.64 *

COhJ OITION 1 a

F

-H- -

a v V*I a

V9

\ .= , . * '

x *.._ ~ : ? ; .,

ll . . ,

,, _=i

=.

. .:. s ty ,..

G __L - -

WHEN (Ta -V)L = Vy , ANCHOR LO AD T. T4 = PRELO AD IN THE ANCHOR.

T = TOTA L L O A D I N AN C H O R Ti . PR ELO AD IN ANCHOR llGURE 1 2035 204

- 4F

-p-;

CONDITION 2 ay

~

~

Vf 6 ",..

, .2

.my 'l r

L =

Py = mWG NE WHEN V > Tl 4 h

PROBLEM T=v 4 P y THE PROBLEM 15 SOLVED BY SUPERPOSITION,USING PARTS i AND 2 BELOW AV Ve' 3EI q

^

Ve ('O C

Q ] _Ve' , 33 )

n_ 3El 2e /

o "

k h ul y O '- ve2 g PART I , , . ,

V-Tl 2EI o'

Ve L _ V-Tl ks

~2EI ks 03 I i u u ,I c '

ds 2 i_ __ __ _ - __ _  : - l i o pv a h a b b "

?

o2 py py ks PART 2 3

Pv L 2 , pv L 6 Pv L 03=0 4-0 2 EI SEI + 's" AG 3 Py L Pv Py Py L7e PvL *6S

=

O PV = 0 3+ u EI +3EI AG ks EQUATING o,= o pv ; P v= - ( V-T l ) +h+ +j (EQ.1) ff < No A R YI N G E X t ! T.S AtJO 7

  • V 2 EE k.s

[F $c! >Y SO L U T10M of E Q-1 YEILDS THE PRYIN6 FOR ryr TOTAL B ot.T FORCE IS V

  • PV n t05.y

CONDITION 1: NO TENSION ANCHOR ROTAT4ON OR DISPL ACEMENT M e.

G V

LV 1

v u? g ll L 4-W + e 'Li C T T= TOT AL LOAD IN ANCHOR Ti- PRELOAD IN ANCHOR FOR M 6 ( , g ,)( L+W t e) , T=Ti PRYtNG FORCE = 0

035 206 FIGURE 3

CONDITION ?. : TENSION ANCHOR ROTATION AND DISPLACEMENT M 6 M

~

\

v \

' V

- L 3

T-Ti o 00* Ks

@ A h h a ll C L+ W + e Li '

p Pv T=V+ Pv T TOTAL LOAD IN ANCHOR Ti:PRELOAO IN ANCHOR T = V 4- P v a a = T-Ti gg V Lt

  1. * ?_EIp L: 03- + ggy - & W - O e.

7 M &Pvli v

  • e+W &L Ve'Li ~

V-Ti

'Ol i pv. 2EIg,,g Kst,y g,

Ks El SEI 5 AG V-Ti V e* L i

  • B IF gS  ?.EI

~

18 t

IF V-Ti < Veggy Li -GLi, SIMULTANEOUS SOLOTION OF THE 6 61% EQUATIONS GivEN ABOVE WILL YlELD THE LOCATION OF THE COMPRESSIVE FORCE C AND T HE. M AC,NITUDE OF THE PRYINc, FORCE Pv

'b FIGURE. 4-