ML19254F479
ML19254F479 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 10/22/1979 |
From: | Stout J BALTIMORE GAS & ELECTRIC CO. |
To: | |
References | |
NUDOCS 7911090509 | |
Download: ML19254F479 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:NON-RECURRING TECHNICAL REPORT (ENVIRONMENTAL)
MONTHYEARML20079M9301989-05-22022 May 1989
[Table view]Trends in Impingement of Finfish & Blue Crabs at Calvert Cliffs Nuclear Power Plant from 1982-1986 ML19309G0151980-04-28028 April 1980 Submits Nonroutine Radiological Environ Operating Rept Re Oyster & Bottom Samples Collected on 800307 from Camp Conoy.Observed Levels of Ag-110m Indicate Doses to Average Oyster Consumer Is within NRC Limits ML19254F4791979-10-22022 October 1979 Nonroutine Radiological Environ Operating Rept.Level of gamma-emitting Radionuclides No Threat to Public Health & Safety 1989-05-22 Category:TEXT-ENVIRONMENTAL REPORTS MONTHYEARML20217P1761999-10-31031 October 1999
[Table view]Generic Environmental Impact Statement for License Renewal of Nuclear Plants.Supplement 1 Regarding the Calvert Cliffs Nuclear Power Plant.Final Report ML20205E0041999-02-28028 February 1999 Generic Environmental Impact Statement for License Renewal of Nuclear Plants.Calvert Cliffs Nuclear Power Plant.Draft Report for Comment ML20195J7671998-12-31031 December 1998 Semi-Annual Surface Water Withdrawal Rept ML20207A9751998-12-31031 December 1998 Radioactive Effluent Release Rept for Calvert Cliffs Isfsi ML20206K7801998-12-31031 December 1998 Radiological Environ Monitoring Program Annual Rept for Ccnpp,Units 1 & 2 & ISFSI,Jan-Dec 1998. with ML20206C7391998-12-31031 December 1998 Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of ISFSI ML20155B2621998-10-26026 October 1998 Environ Impact Statement Scoping Process Summary Rept for Calvert Cliffs Nuclear Power Plant,Lusby,Md ML20236F3451998-06-29029 June 1998 NPDES Noncompliance Notification:On 980615,sample Was Taken & Result Reported That Fecal Coliform Result Was 900 MPN/100 Ml.Result Exceeded Daily Max Limitations.Effluent Was Sampled Again on 980622 & Results Are Expected on 980701 ML20247H6211997-12-31031 December 1997 Radiological Environ Monitoring Program Annual Rept for 970101-1231 ML20237A6421997-12-31031 December 1997 Radioactive Effluent Release Rept ML20212H2721997-12-31031 December 1997 ISFSI Occupational Radiation Exposure Repts for 1997 ML20210Q0971996-12-31031 December 1996 Radioactive Effluent Release Rept,Effluent & Waste Disposal Suppl Info,Second Half of 1996 ML20141A5451996-12-31031 December 1996 Radiological Environ Monitoring Program Annual Rept for 1996, for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20135F0661996-12-31031 December 1996 ISFSI Occupational Radiation Exposure Repts ML20134C9511996-10-0404 October 1996 Environ Assessment & Finding of No Significant Impact Re Transfer of Control of Operating Licenses Re Plant & ISFSI ML20112K0161996-06-18018 June 1996 NPDES Noncompliance Notification:On 960520,BOD5 Results of Sample Taken from Sewage Treatment Plant Effluent Exceeded Daily Max Limitation.Cause of Event Investigated & Unknown. Plant Operations During Period Not Changed ML20078F5481995-01-30030 January 1995 NPDES Noncompliance Rept Notification:On 950111,approx 2,500 Gallons of Suspected Low Concentration Propylene Glycol Solution Discharged to Site Outfall 002 ML20072S3751994-07-25025 July 1994 NPDES Noncompliance Notification:On 940720,plant Intake Embayment Instrumentation Probe Found to Be Not Working. Caused by Saltwater Leakage & Subsequent Damage to Measuring Probe Internals.Equipment Replaced on 940722 ML20072S3441994-07-12012 July 1994 NPDES Noncompliance Notification:On 940706,salinity Meter Found Out of Svc During Surveillance of Effluent Monitoring for Intake Embayment.Caused by Water Leak.Current Monitoring Equipment Being Replaced ML20195J6601994-06-16016 June 1994 NPDES Permit MD0002399,issued to Bg&E ML20072S3601994-06-0707 June 1994 NPDES Noncompliance Notification:On 940601,plant Intake Embayment Instrumentation Oxygen Probe & Data Recorder Found Not to Be Working.Caused by Corroded Internal Connectors & Replacement Tape Cassette Failure,Respectively ML20064G4311994-03-0303 March 1994 NPDES Noncompliance Notification:On 940225,grease & Oil Analysis at 08:00 Was 39.1 Mg/L.Caused by Pavement Runoff Due to Intense Rainfall.Resampling Results Were 0.3 Mg/L ML20063B8231994-01-0707 January 1994 NPDES Noncompliance Notification:On 940104,plant Intake Embayment Dissolved Oxygen Instrumentation Found Damaged. Caused by Failed Oxygen Probe.Probe Repaired ML20064C9941993-12-31031 December 1993 1993 Bg&E Calvert Cliffs Nuclear Power Plant Rept on Number of Personnel & Man-Rem by Work & Job Functions ML20064F1871993-12-31031 December 1993 Effluent & Waste Disposal Semiannual Rept for Second Half 1993, Suppl Info ML20058F2411993-12-0202 December 1993 NPDES Noncompliance Notification:On 931021,trailer That Houses Continuous Monitoring Equipment Removed,Resulting in Failure to Perform Continuous Monitoring of Intake Water. Continuous Monitoring Equipment Returned to Svc on 931117 ML20059B3471993-10-22022 October 1993 Suppl to Environ Rept Calvert Cliffs Nuclear Power Plant ML20056F5691993-06-30030 June 1993 Effluent & Waste Disposal Semiannual Rept for First Half of 1993 ML20012G4191992-12-31031 December 1992 Rept on Number of Personnel & Man-Rem by Work & Job Function for 1992. ML20101S9301992-07-14014 July 1992 NPDES Noncompliance Notification:On 920608,sample Analysis for Fecal Coliform Indicated Concentration of 900 MPN/100 Mi Greater than Max NPDES Limit of 400 MPN/100 Mi.Cause Not Determined.Concentration of Chlorine Increased ML20118A3751992-06-30030 June 1992 Effluent & Waste Disposal Semiannual Rept for First Half 1992 ML20095J2811992-04-24024 April 1992 Suppl to Calvert Cliffs Units 1 & 2 Semiannual Effluent Release Rept for Jul-Dec 1991, Updating Strontium Analytical Results for Fourth Quarter 1991 ML20092G1151991-12-31031 December 1991 Annual Personnel Exposure Rept for 1991, Consisting of Listing of Number of Personnel & man-rem by Work & Job Function ML20092E9851991-12-31031 December 1991 Personnel Monitoring Rept for 1991. W/ ML20090A7941991-12-31031 December 1991 Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991 ML20104A2461991-12-31031 December 1991 Amended Table 1A,(page 9) from Calvert Cliffs Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1991, Re Gaseous Effluents - Summation of All Releases ML20141M1241991-12-31031 December 1991 Radiological Environ Monitoring Program Annual Rept for Calvert Cliffs Nuclear Plant Units 1 & 2,1991 ML20091L0301991-12-23023 December 1991 NPDES Noncompliance Notification:On 911216,sample Analysis of Fecal Coliform Indicated Concentration Greater than 1600 mpn/100 Ml Sample,Exceeding Limit.Caused by Sodium Hypochlorite Pump Problems.Chlorine Concentration Increased ML20091L0341991-12-13013 December 1991 NPDES Noncompliance Notification:On 911209,fecal Coliform Analysis Indicated Concentration Greater than 1600 mpn/100 Ml,Exceeding Limit.Caused by Improper Residual Chlorine Analysis.Test Kit Comparator Replaced ML20091L0511991-10-30030 October 1991 NPDES Noncompliance Notification:On 911022,during Electrical Outage No Residual Chlorine Could Be Identified in Routine Weekly Sample.Fecal Coliform Analysis Yielded Concentration Greater That Daily Max Limit.Faulty Breaker Opened Manually ML20082M4641991-06-30030 June 1991 Effluent & Waste Disposal Semiannual Rept for Second Quarter 1991 ML20113G2191991-06-30030 June 1991 Supplement to Semiannual Radioactive Effluent Release Rept, Calvert Cliffs Nuclear Power Plant,First Half 1991 ML20077G9901990-12-31031 December 1990 Updated Tables 1A,1C,2A & 2B Re Gaseous & Liquid Effluents to Semiannual Effluent Release Rept for Second Half 1990 ML20029A7661990-12-31031 December 1990 Semiannual Effluent Release Rept for Second Half 1990. ML20070D3021990-12-31031 December 1990 Number of Personnel & Man-Rem by Work & Job Function & Personnel Whole Body Exposure for CY90 ML20059D2511990-06-30030 June 1990 Semi-Annual Effluent Release Rept for Calvert Cliffs Nuclear Power Plant First Half 1990 ML20058B9071990-06-30030 June 1990 Updated Tables 1C,2A,2B & Page 4 to Semiannual Effluent Release Rept for First Half 1990 ML20091L0611990-01-10010 January 1990 NPDES Noncompliance Notification:On 891218,auxiliary Boiler Blew Down Releasing Approx 6,000 Gallons Auxiliary Boiler Water Into Chesapeake Bay.Monthly Average of 30 Mg/Liter Was Exceeded ML20011F4161989-12-31031 December 1989 Rev 2,to Evaluation Time Estimates within Plume Exposure Pathway EPZ for Calvert Cliffs Nuclear Power Plant. ML20058B9121989-12-31031 December 1989 Revised Page 4 to Semiannual Effluent Release Rept for Second Half 1989 1999-02-28 Category:TEXT-SAFETY REPORT MONTHYEARML20217G6971999-09-30030 September 1999
[Table view]Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30 |
Text
qv off SALTIMORE GAS AND EL.ECTRIC i CHARLES CENTER . P.O. BOX 1475 BALTIMORE, MARYLAND 21203 Es. scenic Emainsemina osunrunnr October 22, 1979 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Rt.gion 1. USNRC 631 Park Avenue King of Prussia, PA. 19h06
Dear Mr. Grier:
Subject:
Calvert Cliffs Nuclear Power Plant Units No. 1 and 2.
License Nos. DPR-53 and 69 Nonroutine Radiological Environ = ental Operating Report.
This report is submitted, in duplicate, to comply with the require-cents of Appendix B Environmental Technical Specifications Section 5.6.2.b.
l The Oyster samples were collected on August 27, 1979 from the Camp Coney sampling location and analyzed for ga==a-emitting radionnelides as required. The results of the analyses showed the presence of Ag-110 c.t 266* h% pCi/Kg(vet). The oyster samples collected on the same date from the Kenwood Beach sa=pling location (the background location) shoved Ag-110m at I kpci/Kg(vet). A review of the available effluent release data indicates that Ag-100 m in oysters is plant related.
Based on the observed levels of Ag-100m during August 1979, for an average adult consuming one kilogram of oysters per year the doses to the GI Tract and Whole Body are estimated at rv 1.6x10-2 mrem / year andiv 2.3x10-5 mrem / year,respectively. These are very small fractions of the allevable 25 mrem / year (GI Tract) and 25 mrem / year (Whole Body) doses to members of "the general public, (k0 CFR Part 190 Environ = ental Radiation Protection Standards for Nuclear Power Operations) and are considered to be of no consequence to the health and safety of the public.
Ve:ry truly yours, J. W. Stout, Jr.
Chief Environmental Engineer cc: Director, Office of Nuclear Reactor Regulation Washington, DC 20555 (17 copies).
QoOS
,~j g7 )O
__ . __ . . _ __ w1m ST6