ML19249D391

From kanterella
Jump to navigation Jump to search
LER 79-077/03L-0:on 790829,reactor Operated at Greater than 1% Power in Run Mode Over 24-h,w/o Max Total Peaking Factor Being Calculated During Initial Cycle 4 Startup.Caused by Malfunction of Traversing Incore Probe
ML19249D391
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/13/1979
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249D390 List:
References
LER-79-077-03L-01, LER-79-77-3L-1, NUDOCS 7909240578
Download: ML19249D391 (2)


Text