Letter Sequence Approval |
---|
|
|
MONTHYEARML14349A4952014-12-10010 December 2014 Proposed Change to Technical Specifications Concerning the Safety Limit Minimum Critical Power Ratio Project stage: Request ML15034A1062015-02-0303 February 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request Project stage: Acceptance Review ML15050A2452015-02-13013 February 2015 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request Project stage: Supplement ML15051A2832015-02-19019 February 2015 NRR E-mail Capture - Pilgrim - Acceptance Review Safety Limit Minimum Critical Power Ratio (MF5431) Project stage: Acceptance Review ML15051A0322015-02-25025 February 2015 Request for Additional Information Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request Project stage: RAI ML15051A0232015-02-25025 February 2015 Request for Withholding Information from Public Disclosure (Tac No. MF5431) Project stage: Withholding Request Acceptance ML15051A0272015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station Project stage: Other ML15051A0242015-03-0606 March 2015 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination & Opportunity for a Hearing & Order Imposing Procedures for Document Access (MF5431) Project stage: Other NRC-2015-0053, Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station2015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station Project stage: Other ML15075A0332015-03-11011 March 2015 Response to NRC Request for Additional Information Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request Project stage: Response to RAI ML15037A5232015-03-27027 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request Project stage: Approval 2015-02-03
[Table View] |
|
---|
Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21251A1732021-10-21021 October 2021 Enclosure 1 - Pilgrim Amendment No. 257 ISFSI Only Emergency Plan ML21203A0482021-08-24024 August 2021 License Amendment No. 256 ML21217A1752021-08-0505 August 2021 Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version ML21103A0562021-05-12012 May 2021 Amendment Pilgrim Ps -Alternative Measures Rev 20 ML20335A1832020-12-0101 December 2020 Amendment Pilgrim Ps ISFSI to Incorporate ISFSI II ML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19274C6742020-01-0202 January 2020 Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19275E4252019-10-28028 October 2019 Issuance of Amendment No. 250, Revise Technical Specifications to Permanently Defueled TS and Revise Facility License for Permanently Defueled Condition ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML19170A1012019-08-22022 August 2019 Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator ML18284A3752018-11-30030 November 2018 Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition ML18295A0252018-11-16016 November 2018 Correction to Remove Technical Specification Pages from Authority File Related to Amendment Nos. 169 and 177 ML17066A1302017-07-10010 July 2017 Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML16082A4602016-06-0606 June 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14336A6612014-12-11011 December 2014 Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A1302012-11-13013 November 2012 Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone ML1220100482012-08-0707 August 2012 Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint ML0910404232012-05-29029 May 2012 Issuance of Renewed License for Pilgrim Nuclear Generating Station ML11152A0432011-07-22022 July 2011 License Amendment, Cyber Security Plan ML1106500092011-03-28028 March 2011 Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves ML0906402242009-03-26026 March 2009 License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation ML0815703662008-11-20020 November 2008 License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability ML0727503942007-11-0505 November 2007 License Amendment, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements ML0723400092007-08-23023 August 2007 Revised License Pages of Facility Operating License DPR-35 B.5.b ML0708711652007-05-14014 May 2007 Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0707404192007-04-25025 April 2007 License Amendment, Issuance of Amendment Single Control Rod Withdrawal Allowances ML0705303842007-03-26026 March 2007 License Amendment, Issuance of Amendment Extension of Pressure-Temperature Limits Specified in Technical Specifications ML0705306462007-03-26026 March 2007 Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities. ML0624303372006-09-20020 September 2006 License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions ML0622803042006-09-14014 September 2006 Issuance of Amendment Relocation of Technical Specifications ML0617200682006-08-0909 August 2006 Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities ML0618400322006-08-0404 August 2006 Issuance of License Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature ML0606000402006-04-13013 April 2006 Issuance of Amendment Removal of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement ML0607402142006-04-13013 April 2006 License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances ML0601701192006-04-12012 April 2006 Issuance of Amendment Single Recirculation Loop Operation ML0531404332006-04-10010 April 2006 Issuance of Amendment Revised Applicability for Containment Oxygen and Differential Pressure Limits ML0518700032005-08-29029 August 2005 Issuance of License Amendment 217, Surveillance Frequency Improvements ML0518702572005-07-29029 July 2005 License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain Valves ML0501804932005-03-16016 March 2005 License Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements ML0500504862005-02-0202 February 2005 Issuance of Amendment Changes to Technical Specifications Table 3.2.C-1 ML0423001372005-01-0505 January 2005 License Amendment, Revision to the Reactor Pressure Vessel Material Surveillance Program ML0434902432004-12-27027 December 2004 Issuance of Amendment Engineering Evaluation Submitted Pursuant to Technical Specifications Section 3.6.D.3 and 3.6.D.4 ML0419704502004-08-17017 August 2004 License Amendment, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D ML0411000092004-07-22022 July 2004 License Amendment, Eliminate Requirements for Hydrogen Analyzers 2021-08-05
[Table view] Category:Safety Evaluation
MONTHYEARML21217A1752021-08-0505 August 2021 Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version ML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19274C6742020-01-0202 January 2020 Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition ML19142A0432019-12-18018 December 2019 Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML19170A2502019-08-22022 August 2019 Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) ML19122A1992019-06-11011 June 2019 Review of Spent Fuel Management Plan ML18284A3752018-11-30030 November 2018 Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17066A1302017-07-10010 July 2017 Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) ML17093A8942017-05-12012 May 2017 Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093) ML17058A3252017-04-12012 April 2017 Approval of Certified Fuel Handler Training and Retraining Program ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16082A4602016-06-0606 June 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16124B0872016-05-0303 May 2016 E-mail Review of Safety Evaluation for Proposed Alternative Relief Request No. PRR-51 ML16042A2912016-03-15015 March 2016 Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME Code ML16008B0772016-03-0303 March 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15338A3092016-01-0505 January 2016 Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702 ML15166A4012015-06-19019 June 2015 Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection Interval ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML15103A0692015-04-21021 April 2015 Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii Examination ML15084A0252015-03-23023 March 2015 Non-Proprietary - Safety Evaluation - Fourth 10-Year Interval Inservice Inspection - Request for Relief PRR-24 ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14336A6612014-12-11011 December 2014 Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML14198A1572014-08-0101 August 2014 Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370) ML14083A6312014-03-27027 March 2014 Relief Request PRR-22 Regarding a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML13149A2152013-05-29029 May 2013 Correction to Staff Assessment Letter to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13127A1792013-05-21021 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A1302012-11-13013 November 2012 Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone ML1220100482012-08-0707 August 2012 Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint ML12174A1472012-07-10010 July 2012 Safety Evaluation for Relief Request PRR-21, Rev 4, to Install a Weld Overlay on RPV-n14-1 Standby Liquid Control Safe-End Nozzle Weld at Pilgrim ML11152A0432011-07-22022 July 2011 License Amendment, Cyber Security Plan ML1106500092011-03-28028 March 2011 Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves ML1100502982011-01-26026 January 2011 Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLR ML1022901632010-08-25025 August 2010 Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power Station ML0936208072010-01-22022 January 2010 Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St ML0936208952010-01-22022 January 2010 Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power ML0928706472009-10-29029 October 2009 Request for Threshold Determination Under 10 CFR 50.80-Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Nos. 1, 2 and 3, Palisades, Pilgrim, Vermont Yankee ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0923705492009-09-11011 September 2009 Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power Station ML0911304562009-04-30030 April 2009 Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Pilgrim Nuclear Power Station ML0906402242009-03-26026 March 2009 License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation ML0815703662008-11-20020 November 2008 License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability 2021-08-05
[Table view] Category:Technical Specifications
MONTHYEARML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML17163A1812017-05-25025 May 2017 Supplemental to Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition ML17053A4682017-02-14014 February 2017 Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition ML16363A2662017-01-10010 January 2017 Correction to Amendment No. 234 Change in Technical Specification Measurement Frequency from 18 Months to 24 Months ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML14259A3812014-09-11011 September 2014 Supplement to Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling Operations ML13108A2172013-04-0505 April 2013 Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d) CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications ML12005A1982011-12-29029 December 2011 Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup ML0731004782007-11-0505 November 2007 Technical Specifications, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements ML0726101972007-09-18018 September 2007 Technical Specifications, Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0726102002007-05-17017 May 2007 Technical Specifications, Corrected Page II (Fixed Administrative Error) ML0715605422007-04-25025 April 2007 Tech Spec Pages for Amendment 228 Single Control Rod Withdrawal Allowances ML0714303052007-04-25025 April 2007 Technical Specifications, Limiting Conditions for Operation ML0708603592007-03-26026 March 2007 Technical Specifications, Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities. ML0708603392007-02-22022 February 2007 Technical Specifications, Modify the TSs to Extend the Use of the Current Pressure-Temperature Limits as Specified in TS Figures 3.6.1, 3.6.2, and 3.6.3 Through the End of Operating Cycle 18 ML0702302932007-01-15015 January 2007 Proposed Change to Applicability of Pilgrim'S Pressure - Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, and 3.6.3, Revision 1 ML0631303512006-11-0202 November 2006 Application for Technical Specification (TS) Change to Add LCO 3.0.8 on the Inoperability of Snubbers (and Adoption of TS Bases for LCO 3.0.8) Using the Consolidated Line Item Improvement Process (CLIIP) ML0626405822006-09-20020 September 2006 Tech Spec Pages for Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions ML0626202402006-09-14014 September 2006 Technical Specification Pages Re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report ML0624904892006-08-30030 August 2006 Technical Specification Amendment Request to Relocate Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, ML0622800132006-08-0909 August 2006 Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities ML0622301672006-08-0404 August 2006 Tech Spec Pages for Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature ML0618704692006-06-30030 June 2006 Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems ML0613000952006-05-0505 May 2006 Correction to Amendment No. 221 Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications ML0610702152006-04-13013 April 2006 Technical Specification Page, Deletes the Main Steam Isolation Valve Twice Per Week Partial Stroke Testing Surveillance Specified in Technical Specification 4.7.A.2.b.1.c ML0610702042006-04-13013 April 2006 Technical Specification Page Re Revised Rod Worth Minimizer Bypass Allowances ML0610908322006-04-12012 April 2006 Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves ML0610701672006-04-12012 April 2006 Tech Spec Pages for Amendment 219 Regarding Single Recirculation Loop Operation ML0611402652006-04-10010 April 2006 Technical Specification Pages Re Revised Applicability for Containment Oxygen and Differential Pressure Limits ML0524301522005-08-29029 August 2005 Technical Specification Pages Re Surveillance Frequency Improvements ML0521400792005-07-29029 July 2005 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Valves ML0515204742005-05-24024 May 2005 Technical Specifications Amendment Request to Revise Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Applicability Requirements ML0515204582005-05-24024 May 2005 Technical Specifications Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowances ML0515204732005-05-24024 May 2005 Request for Amendment to the Technical Specifications to Delete Requirement Related to NRC Approval of Engineering Evaluation for Elevated Safety Relief Valve Discharge Pipe Temperature ML0512200952005-04-28028 April 2005 Technical Specifications, Eliminates Secondary Containment Operability Requirements When Handling Sufficiently Decayed Irradiated Fuel or Performing Core Alterations ML0510400322005-04-12012 April 2005 Technical Specifications, Revision to Surveillance Requirement Frequency for Containment and Suppression Pool Spray Headers and Nozzles ML0509004102005-03-30030 March 2005 Technical Specifications, Allows One-time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML0507601772005-03-16016 March 2005 Tech Spec Pages for Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements ML0503800052005-02-0202 February 2005 Tech Spec Page for Amendment 210 Changes to Technical Specifications Table 3.2.C-1 ML0500701552005-01-0505 January 2005 Technical Specification Pages for Amendment No. 209 to License No. DPR-35 ML0423206092004-08-17017 August 2004 Technical Specifications, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D ML0420502772004-07-22022 July 2004 Tech Spec Pages for Amendment 206 Elimination of Requirements for Hydrogen Analyzers ML0403307902004-01-30030 January 2004 License Amendment, Tech Spec Pages ML0332100752003-11-14014 November 2003 Revised TS Page 5.0-7, Eliminating Requirements for Post-Accident Sampling System 2020-12-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 6, 2015 Mr. John A. Dent, Jr.
Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT REGARDING THE MINIMUM CRITICAL POWER RATIO LICENSE AMENDMENT REQUEST (TAC NO. MF5431)
Dear Mr. Dent:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 243 to Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment consists of changes to the Technical Specification (TS) in response to your application transmitted by letter dated December 10, 2014, as supplemented by letters dated February 13, and March 11, 2015.
This amendment revises the minimum critical power ratio from~ 1.08 to~ 1.10 for two recirculation loop operation and from ~ 1.11 to ~ 1.12 for single recirculation loop operation in TS 2.1, "Safety Limits."
A copy of the related Safety Evaluation is enclosed. Notice of Issuance will be included in the NRC's biweekly Federal Register notice.
Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosures:
- 1. Amendment No. 243 to License No. DPR-35
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 243 License No. DPR-35
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by Entergy Nuclear Operations, Inc. (the licensee), dated December 10, 2014, as supplemented by letters dated February 13, 2015, and March 11, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Renewed Facility Operating License No. DPR-35 is hereby amended to read as follows:
- 8. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, are hereby incorporated in the renewed operating license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Michael I. Dudek, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: May 6, 2015
ATIACHMENT TO LICENSE AMENDMENT NO. 243 RENEWED FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 3 3 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 2-1 2-1
provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Level ENO is authorized to operate the facility at steady state power levels not to exceed 2028 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, are hereby incorporated in the renewed operating license.
The licensee shall operate the facility in accordance with the Technical Specifications.
C. Records ENO shall keep facility operating records in accordance with the requirements of the Technical Specifications.
D. Equalizer Valve Restriction - DELETED E. Recirculation Loop Inoperable - DELETED F. Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated December 21, 1978 as supplemented subject to the following provision:
ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (50 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Pilgrim Nuclear Power Station Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision O" submitted by letter dated October 13, 2004, as supplemented by letter dated May 15, 2006.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 236, as supplemented by changes approved by :License Amendment Nos. 238 and 241.
Amendment 243 Renewed License No. DPR-35 .
2.0 SAFETY LIMITS 2.1 Safety Limits 2.1.1 With the reactor steam dome pressure < 685 psig or core flow < 10% of rated core flow:
THERMAL POWER shall be~ 25% of RATED THERMAL POWER.
2.1.2 With the reactor steam dome pressure~ 685 psig and core flow~ 10% of rated core flow:
MINIMUM CRITICAL POWER RATIO shall be~ 1.10 for two recirculation loop operation or~ 1.12 for single recirculation loop operation.
- 2. 1.3 Whenever the reactor is in the cold shutdown condition with irradiated fuel in the reactor vessel, the water level shall not be less than 12 inches above the top of the normal active fuel zone.
- 2. 1.4 Reactor steam dome pressure shall be~ 1340 psig at any time when irradiated fuel is present in the reactor vessel.
2.2 Safety Limit Violation With any Safety Limit not met within two hours the following actions shall be met:
2.2.1 Restore compliance with all Safety Limits, and 2.2.2 Insert all insertable control rods.
Amendment No. 15, 27, 42, 72, 1aa, 149, 171, 191, 219, ~. 232, 235, ~. 243 2-1
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 243 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-35 ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293
1.0 INTRODUCTION
By application dated December 10, 2014 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML14349A495 and ML14349A496), as supplemented by letters dated February 13, 2015 (ADAMS Accession No. ML15050A245), and March 11, 2015 (ADAMS Accession No. ML15075A033), Entergy Nuclear Operations, Inc. (ENO, the licensee),
submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for changes to the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification (TS). The supplements dated February 13, and March 11, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register (FR) on March 12, 2015 (80 FR 13030).
The proposed changes would revise the TS associated with the safety limit minimum critical power ratio (SLMCPR) for single and two recirculation loop operations.
2.0 REGULATORY EVALUATION
2.1 Description of System The licensee stated in its letter dated December 10, 2014 (Reference 1), that:
The fuel cladding integrity safety limit is set such that no mechanistic fuel damage is calculated to occur if the limit is not violated. Since the parameters which result in fuel damage are not directly observable during reactor operation, the thermal and hydraulic conditions resulting in a departure from nucleate boiling have been used to mark the beginning of the region where fuel damage could occur. Although it is recognized that a departure from nucleate boiling Enclosure 2
would not necessarily result in damage to boiling-water reactor [BWR] fuel rods, the critical power at which boiling transition is calculated to occur has been adopted as a convenient limit. The uncertainties in monitoring the core operating
[condition] and in the procedures used to calculate the critical power result in an uncertainty in the value of the critical power. Therefore, the fuel cladding integrity safety limit is defined as the minimum critical power ratio (MCPR) in the limiting fuel assembly for which more than 99.9% of the fuel rods in the core are expected to avoid boiling transition considering the power distribution within the core and all uncertainties.
2.2 Proposed TS Change In TS 2.1, "Safety Limits," the MCPR would change from~ 1.08 to~ 1.10 for two recirculation loop operation and from~ 1.11 to~ 1.12 for single recirculation loop operation.
2.3 Regulatory Requirements and Guidance The construction permit for Pilgrim was issued by the Atomic Energy Commission (AEC) on August 26, 1968, a low-power license was issued on June 8, 1972, and a full-power license was issued on September 15, 1972. The plant design approval for the construction phase was based on the draft General Design Criteria (GDC) published by the AEC in the Federal Register (32 FR 10213) on July 11, 1967. The AEC published the final rule that added Title 10 of Code of Federal Regulations (10 CFR) Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," in the Federal Register (36 FR 3255) on February 20, 1971, with the rule effective on May 21, 1971. As stated in SECY-92-223, dated September 18, 1992 (ADAMS Accession No. ML003763736), the Commission decided not to apply the Appendix A GDC to plants with construction permits issued prior to May 21, 1971.
The Pilgrim Updated Final Safety Analysis Report (UFSAR) states that the AEC concluded in a May 20, 1968, safety evaluation that Pilgrim conforms to the draft GDC. The plant GDC is discussed in the UFSAR, Appendix F, "Comparison of Pilgrim Nuclear Power Station with the Proposed General Design Criteria Published by AEC for Public Comment in the Federal Register, July 11, 1967" (32 FR 10213).
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license application. The Commission's regulatory requirements related to the content of the TS are contained in 10 CFR 50.36(c).
Section 50.36(c) of 10 CFR requires that the TSs include, among other things, items in the following categories: (1) safety limits, limiting safety systems settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
The regulation at 10 CFR 50.36(c)(1 )(i)(A) states, in part, that if any safety limit is exceeded, the reactor must be shut down. The safety limit MCPR is calculated on a cycle-specific basis because it is necessary to account for the core configuration-specific neutronic and thermal-hydraulic response.
The GDC 10, "Reactor Design," states that "the reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified
acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences."
NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," provides guidance on the acceptability of the reactivity control systems, the reactor core, and fuel system design. Specifically, Section 4.4, 'Thermal Hydraulic Design,"
provides guidance on the review of thermal-hydraulic design in meeting the requirement of GDC 10.
3.0 TECHNICAL EVALUATION
The licensee stated in its letter dated February 13, 2015 (Reference 2), that:
Fuel design limits can be exceeded if the core exceeds critical power. Critical power is a term used for the power at which the fuel departs from nucleate boiling and enters a transition to film boiling. For BWRs, the critical power is predicted using a correlation known as the General Electric (GE) critical quality boiling length correlation (GEXL correlation). Due to core wide and operational variations, the margin to boiling transition is most easily described in terms of a critical power ratio (CPR), which is defined as the rod critical power as calculated by GEXL divided by the actual rod power. The more a CPR value exceeds 1.0, the greater the margin to boiling transition. The SLMCPR is calculated using a statistical process that takes into account operating parameters and uncertainties. The operating limit MCPR (OLMCPR) is equal to the SLMCPR plus a CPR margin for transients. At the OLMCPR, at least 99.9 percent of the rods avoid boiling transition during steady state operation and transients caused by a single operator error or equipment malfunction.
3.1 Cycle 21 Core Pilgrim is a General Electric Type 3 BWR design. Pilgrim Cycle 21 core loading consists of 144 fresh Global Nuclear Fuel 2 (GNF2) fuel bundles, 152 once-burnt GNF2 fuel bundles, 152 twice-burnt GNF2 fuel bundles, and 132 thrice-burnt GNF2 fuel bundles.
3.2 Methodology Global Nuclear Fuel developed the Pilgrim Cycle 21 SLMCPR values using the following NRG-approved methodologies and uncertainties:
- NEDC-32601-A, "Methodology and Uncertainties for Safety Limit MCPR Evaluations,"
(Reference 4)
(Reference 5)
- NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel (GESTAR 11)" (Reference 6)
- NEDC-32505-A, "R-Factor Calculation Method for GE11, GE12 and GE13 Fuel,"
(Reference 7)
Plant specific use of these methodologies must adhere to certain restrictions.
3.2.1 Methodology Restrictions Based on the review of topical reports NEDC-32601-A and NEDC-32649P-A and Amendment 25 to NEDE-24011-P-A, the NRC staff identified the following restrictions for the use of these topical reports:
- The TGBLA (lattice physics code) fuel rod power calculational uncertainty should be verified when applied to fuel designs not included in the benchmark comparisons of Table 3.1 of NEDC-32601-A, since changes in fuel design can have a significant effect on calculation accuracy.
- The effect of the correlation of rod power calculation uncertainties should be reevaluated to insure the accuracy of R-Factor uncertainty when the methodology is applied to a new fuel lattice.
- In view of the importance of MCPR Importance Parameter (MIP) criterion and its potential sensitivity to changes in fuel bundle designs, core loading and operating strategies, the MIP criterion should be reviewed periodically as part of the procedural review process to insure that the specific value recommended in NEDC-32601-A is applicable to future designs and operating strategies.
3.2.1.1 Restrictions (1) and (2)
In addressing restrictions (1) and (2) in a September 24, 2001, letter (ADAMS Accession No. ML012710272) from GNF to the NRC "Confirmation of 1Ox1 O Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies" (Reference 8), GNF stated that the rod power calculational uncertainties are dominated by geometrical considerations in which GE14 is identical to GE12. Global Nuclear Fuel has stated in the fuel bundle design information notice (Reference 9) that GNF2 fuel is designed for mechanical, nuclear, and thermal-hydraulic compatibility with the other 1Ox10 GNF fuel designs. The design has features of the currently operating GE10, GE11/13, and GE12/14 fuel including pellet-cladding interaction resistant barrier cladding, high performance spacers, part length rods, interactive thick corner/thin wall channel, and axial enrichment loading. The GNF2 design is a 1Ox10 array with 92 fuel rods and two large central water rods, fourteen part length fuel rods.
The part length rod configuration improves efficiency and reactivity margins. Tables 2.1 and 3.1 of NEDC-32601-A provide a summary of SLMCPR uncertainties and pin power comparisons for a typical GE fuel design. The values given in the tables are representative of the values being calculated for GE14 and GNF2.
By letter dated February 25, 2015 (ADAMS Accession No. ML15051A032), the NRC staff asked the licensee to explain the differences in design and geometrical considerations between GNF2 and GE14 fuel. In response to the NRC staff's question (Reference 3), the licensee stated that GNF2 is an evolutionary fuel product based on GE14 and that it is not considered a new fuel design as it maintains the previously established 10x10 array. The NRC staff finds the
licensee's response acceptable because there are only minor design differences, which does not affect the implementation of the NRG-approved methodology.
Based on the above discussion, the NRC staff has determined that the rod power calculational uncertainties used by GNF to develop the Pilgrim Cycle 21 SLMCPR values are valid for GNF2 fuel.
3.2.1.2 Restriction (3)
For Pilgrim Cycle 21, the minimum core flow SLMCPR calculation performed at 76.7 percent core flow and rated core power condition was limiting as compared to the rated core flow and rated core power condition. The analysis indicates that, at low core flows, the limiting rod pattern and the nominal rod pattern are essentially the same. In its report, GNF-001 N8659-R1-NP, "GNF Additional Information Regarding the Requested Changes to the TS SLMCPR, Pilgrim Cycle 21," GNF determined that the rod pattern used to calculate the SLMCPR at 100 percent rated power and 76.7 percent rated flow reasonably assures that at least 99.9 percent of fuel rods in the core would not be expected to experience boiling transition during normal operation or anticipated operational occurrences during the operation of Pilgrim Cycle 21.
The NRC staff finds that the rod patterns used to calculate the SLMCPR at 76. 7 percent of rated core flow and 100 percent of rated core power produce a limiting MCPR distribution that reasonably bounds the MCPR distributions that would be expected during the operation of the Pilgrim core throughout Cycle 21. Therefore, the NRC staff finds that the licensee's application demonstrates the validity of the criterion in restriction (3) (MIP criterion) for GNF2 fuel and the minimum core flow condition.
In summary, the NRC staff finds that the licensee has adequately addressed the restrictions of topical reports NEDC-32601-A and NEDC-32649P-A and Amendment 25 to NEDE-24011-P-A; and that the use of these reports to evaluate the Pilgrim Cycle 21 SLMCPR is acceptable.
3.3 Departures from NRG-Approved Methodology No departures from NRG-approved methodologies were identified in the Pilgrim Cycle 21 SLMCPR calculations.
3.4 Deviations from the NRG-Approved Calculational Uncertainties 3.4.1 R-Factor The R-Factor is an input into the GEXL correlation used to describe the local pin-by-pin power distribution and the fuel assembly and channel geometry on the fuel assembly critical power.
The R-F actor uncertainty analysis includes an allowance for power peaking modeling uncertainty, manufacturing uncertainty and channel bow uncertainty. Global Nuclear Fuel has increased this uncertainty for all SLMCPR calculations to account for the potential impact of control blade shadow corrosion induced bow. Global Nuclear Fuel has generically increased the GEXL R-Factor uncertainty (Reference 7) to account for an increase in channel bow due to the emerging unforeseen phenomenon called control blade shadow corrosion-induced channel bow, which is not accounted for in the channel bow uncertainty component of the approved R-Factor uncertainty. The Pilgrim Cycle 21 analysis shows an expected channel bow which is
bounded by a GEXL R-Factor uncertainty that accounts for channel bow uncertainty. Thus, the NRC staff finds that the use of a GEXL R-Factor uncertainty adequately accounts for the expected control blade shadow corrosion-induced channel bow for Pilgrim Cycle 21.
3.4.2 Core Flow Rate and Random Effective Traverse In-Core Probe Reading Global Nuclear Fuel has committed to the expansion of the statepoints used in the determination of the SLMCPR (Reference 10). Consistent with the Reference 10 commitments, GNF performs analyses at the rated core power and minimum licensed core flow point in addition to analyses at the rated core power and rated core flow point. The NRC-approved SLMCPR methodology is applied at each statepoint that is analyzed.
The core flow and random traverse in-core probe (TIP) reading uncertainties used in single loop operation (SLO) minimum core flow SLMCPR analysis remain the same as in the rated core flow SLO SLMCPR analysis because these uncertainties, which are substantially larger than used in two loop operation (TLO) analysis, already account for the effects of operating at reduced core flow.
For TLO calculations performed at 76. 7 percent core flow, the NRC-approved uncertainty values for the core flow rate (2.5 percent) and the random effective TIP reading (1.2 percent) are adjusted by dividing them by 76. 7/100. The treatment of the core flow and random effective Tl P reading uncertainties is based on the assumption that the signal to noise ratio deteriorates as core flow is reduced. Global Nuclear Fuel stated that this increase is conservative based on the expectation that the variability in the absolute flow will decrease as flow decreases. The NRC staff finds that this increase in the uncertainty bounds the original non-flow dependent uncertainties and, therefore, the NRC staff finds it acceptable for Pilgrim Cycle 21.
3.5 Core Monitoring System For Pilgrim Cycle 21, the GNF 30 MONICORE System (Reference 11) will be used as the core monitoring system. The 30 MONICORE system is in widespread use throughout the GNF fueled fleet of BWRs like Pilgrim. Use of the current version of 30 MONICORE provides the plant capability to perform the reactivity anomaly surveillance. Use of 30 MONICORE has been previously evaluated and accepted by the NRC staff (Reference 11 ).
Therefore, the NRC staff finds the use of the GNF 30 MONICORE system for Pilgrim Cycle 21 to be acceptable.
3.6 NRC Staff's Evaluation The NRC staff has determined that the proposed SLMCPR values were developed through the appropriate use of NRC-approved methodologies and guidelines. Therefore, the NRC staff finds that the SLMCPR values of~ 1.10 for two recirculation loop operation and~ 1.12 for single recirculation loop operation are acceptable.
4.0 FINAL NO SIGNIFICANT HAZARDS CONSIDERATION
DETERMINATION The Commission has made a final determination that the license amendment involves no significant hazards consideration. Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility, in accordance with the proposed amendment does not:
(1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91 (a) in its application dated December 10, 2014, the licensee provided its analysis of the issue of no significant hazards consideration, which is presented below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
The proposed SLMCPR, and its use to determine the Operating Cycle 21 thermal limits, have been derived using NRC approved methods specified in the Reference section of the Technical Specification Bases Section for 2.0 SAFETY LIMITS. These methods do not change the method of operating the plant and have no effect on the probability of an accident initiating event or transient.
The basis of the SLMCPR is to ensure no mechanistic fuel damage is calculated to occur if the limit is not violated. The new SLMCPR preserves the margin to transition boiling, and the probability of fuel damage is not increased.
Therefore, the proposed changes to Technical Specifications do not involve an increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed changes result only from the analysis for the Cycle 21 core reload using methods described in NEDE24011 P-A (GESTAR II). These methods have been reviewed and approved by the NRC, do not involve any new or unapproved method for operating the facility, and do not involve any facility modifications. No new initiating events or transients result from these changes.
Therefore, the proposed changes to Technical Specifications do not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
The margin of safety as defined in the TS bases will remain the same.
The new SLMCPR was derived using NRC approved methods which are
in accordance with the current fuel design and licensing criteria. The SLMCPR remains high enough to ensure that greater than 99.9% of all fuel rods in the core will avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity.
Therefore, the proposed changes to technical specifications do not involve a significant reduction in the margin of safety.
Based on the above evaluations, the NRC staff has concluded that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff has made a final determination that no significant hazards consideration is involved for the proposed amendment and that the amendment should be issued as allowed by the criteria contained in 10 CFR 50.91.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Massachusetts State official was notified of the proposed issuance of the amendment. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on March 12, 2015 (80 FR 13030). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
8.0 REFERENCES
- 1. Letter from John A. Dent, Jr. (ENO) to NRC, "Proposed Change to the Pilgrim's Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio,"
December 10, 2014 (ADAMS Accession Nos. ML14349A495 and ML14349A496).
- 2. Letter from John A. Dent, Jr. (ENO) to NRC, "Request for Supplemental Information Needed For Acceptance of Requested Licensing Action Regarding the Safety Limit
Minimum Critical Power Ratio License Amendment Request," February 13, 2015 (ADAMS Accession No. ML15050A245).
- 3. Letter from John A. Dent, Jr. (ENO) to NRC, "Response to Request for Additional Information Regarding the Safety Limit Minimum Critical Power Ratio License Amendment," March 11, 2015 (ADAMS Accession No. ML15075A033).
- 4. General Electric Nuclear Energy Topical Report, NEDC-32601-A, "Methodology and Uncertainties for Safety Limit MCPR Evaluations," August 1999 (ADAMS Accession No. ML14093A216).
- 5. General Electric Nuclear Energy Topical Report, NEDC-32649P-A, Power Distribution Uncertainities for Safety Limit MCPR Evaluations," August 31, 1999.
- 6. Letter from Brian R. More (GNF) to NRC, "Accepted Proprietary and Non-Proprietary Versions of Revision 20 to NEDE-24011-P, General Electric Standard Application for Reactor Fuel (GESTAR II), Main and United States Supplement," December 2013 (ADAMS Accession No. ML13352A465).
- 7. General Electric Nuclear Energy Topical Report, NEDC-32505-A, Revision 1, "R-Factor Calculation Method for GE11, GE12 and GE 13 Fuel," July 1999 (ADAMS Accession No. ML060520636).
- 8. Letter from Glen A. Watford (GNF) to NRC, "Confirmation of 1Ox10 Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies,"
September 24, 2001 (ADAMS Accession No. ML012710272).
- 9. Global Nuclear Fuels Topical Report, NED0-31152, "Global Nuclear Fuels Fuel Bundle Designs", May 2007, Revision 9 (ADAMS Accession No. ML071510287).
- 10. MFN 04-081, Letter from J.S. Post (GE) to NRC, "Part 21 Reportable Condition and 60-Day Interim Report Notification: Non-Conservative SLMCPR," August 24, 2004 (ADAMS Accession No. ML042720293).
- 11. MFN-003-99, Letter, Frank Akstulewicz (NRC) to Glen A. Watford (GE), "Acceptance for Referencing of Licensing Topical Reports NEDC-32601 P, Methodology and Uncertainties for Safety Limit MCPR Evaluations, NEDC-32694P, Power Distribution Uncertainties for Safety Limit MCPR Evaluation; and Amendment 25 to NEDE-24011-P-A on Cycle Specific Safety Limit MCPR," March 11, 1999 (TAC Nos. M97490, M99069, and M9749).
Principal Contributors: F. Forsaty M. Chernoff Date: May 6, 2015
ML15114A021 *See dated memo **NLO via email OFFICE DORL/LPLl-1 /PM DORL/LPLl-1 /LA DSS/SRXB/BC NAME NMorgan KGoldstein CJackson*