LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.10 CORE ALTERATIONS (Cont) 4.10 CORE ALTERATIONS (Cont)
I I
D.
Multiple Control Rod Removal (Cont)
- c. The Reactivity Margin requirements of Specifications 3.3.A.1 are satisfied.
- d. No fuel is being loaded into the reactor core.
- e. All other control rods are fully inserted.
- f. The four fuel assemblies are removed from the core cell surrounding each control rod or control rod drive mechanism to be removed from the core and/or reactor vessel.
D.
Multiple Control Rod Removal (Cont)
- c. The Reactivity Margin requirements of Specification 3.3.A.1 satisfied.
are
- d. Deleted
- e. All other control rods are fully inserted.
- f. The four fuel assemblies surrounding each control road and/or control rod drive mechanism that is to be removed from the reactor vessel at the same time are removed from the core and/or reactor vessel.
I I
Amendment No. 44 207 3 /4. 10-3