Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21251A17321 October 2021Enclosure 1 - Pilgrim Amendment No. 257 ISFSI Only Emergency Plan
ML21203A04824 August 2021License Amendment No. 256High Radiation Area
ML21217A1755 August 2021Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version
ML21103A05612 May 2021Amendment Pilgrim Ps -Alternative Measures Rev 20
ML20335A1831 December 2020Amendment Pilgrim Ps ISFSI to Incorporate ISFSI II
ML20328A2971 December 2020Amendment No. 253 - Non-Safeguards Version
ML19274C6742 January 2020Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled ConditionOffsite Dose Calculation Manual
Exemption Request
Minimum staff
Fire Protection Program
ML19276C4202 January 2020Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled ConditionCyber Security
Exemption Request
ML19275E42528 October 2019Issuance of Amendment No. 250, Revise Technical Specifications to Permanently Defueled TS and Revise Facility License for Permanently Defueled ConditionSafe Shutdown
Shutdown Margin
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
Cyber Security
Aging Management
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Safeguards Contingency Plan
License Renewal
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML19235A05027 August 2019Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming AmendmentSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML19170A10122 August 2019Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator
ML18284A37530 November 2018Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled ConditionAbnormal operational transient
Severe Accident Management Guideline
Minimum staff
ML18295A02516 November 2018Correction to Remove Technical Specification Pages from Authority File Related to Amendment Nos. 169 and 177Offsite Dose Calculation Manual
ML17066A13010 July 2017Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304)
ML16250A22328 October 2016Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry TechnicianSafe Shutdown
Cyber Security
Fire Protection Program
ML16082A4606 June 2016Issuance of Amendment Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML15114A0216 May 2015Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment RequestSafe Shutdown
Anticipated operational occurrence
Cyber Security
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML14272A07012 March 2015Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open TransientSafe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Cyber Security
Fuel cladding
Fire Protection Program
ML14336A66111 December 2014Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482)Safe Shutdown
Cyber Security
Fire Protection Program
ML14295A68531 October 2014Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling OperationsSafe Shutdown
Safe Shutdown Earthquake
Cyber Security
Safeguards Contingency Plan
Earthquake
Control of Heavy Loads
Fire Protection Program
Affidavit
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML12261A13013 November 2012Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation MilestoneSafe Shutdown
Cyber Security
Fire Protection Program
ML1220100487 August 2012Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip SetpointSafe Shutdown
Cyber Security
Overtravel
Fire Protection Program
ML09104042329 May 2012Issuance of Renewed License for Pilgrim Nuclear Generating StationSafe Shutdown
Aging Management
Safeguards Contingency Plan
License Renewal
Fire Protection Program
ML11152A04322 July 2011License Amendment, Cyber Security PlanSafe Shutdown
Cyber Security
Fire Protection Program
ML11065000928 March 2011Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety ValvesSafe Shutdown
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
MELLLA
Fire Protection Program
Weak link
ML09064022426 March 2009License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop OperationSafe Shutdown
Anticipated operational occurrence
Abnormal operational transient
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML08157036620 November 2008License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope HabitabilitySafe Shutdown
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Earthquake
Recently irradiated fuel
Fire Protection Program
ML0727503945 November 2007License Amendment, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements
ML07234000923 August 2007Revised License Pages of Facility Operating License DPR-35 B.5.bB.5.b Mitigating Strategies
ML07087116514 May 2007Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of SnubbersSafe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML07074041925 April 2007License Amendment, Issuance of Amendment Single Control Rod Withdrawal AllowancesShutdown Margin
Anticipated operational occurrence
ML07053038426 March 2007License Amendment, Issuance of Amendment Extension of Pressure-Temperature Limits Specified in Technical Specifications
ML07053064626 March 2007Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities.Anticipated operational occurrence
Hydrostatic
ML06243033720 September 2006License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and ActionsGrab sample
Probabilistic Risk Assessment
ML06228030414 September 2006Issuance of Amendment Relocation of Technical SpecificationsProbabilistic Risk Assessment
ML0617200689 August 2006Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities
ML0618400324 August 2006Issuance of License Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature
ML06060004013 April 2006Issuance of Amendment Removal of Main Steam Isolation Valve Twice Per Week Testing Surveillance RequirementPower-Operated Valves
ML06074021413 April 2006License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances
ML06017011912 April 2006Issuance of Amendment Single Recirculation Loop OperationSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML05314043310 April 2006Issuance of Amendment Revised Applicability for Containment Oxygen and Differential Pressure LimitsFuel cladding
ML05187000329 August 2005Issuance of License Amendment 217, Surveillance Frequency ImprovementsPower change
ML05187025729 July 2005License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain ValvesScram Discharge Volume
ML05018049316 March 2005License Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing RequirementsHydrostatic
ML0500504862 February 2005Issuance of Amendment Changes to Technical Specifications Table 3.2.C-1
ML0423001375 January 2005License Amendment, Revision to the Reactor Pressure Vessel Material Surveillance Program
ML04349024327 December 2004Issuance of Amendment Engineering Evaluation Submitted Pursuant to Technical Specifications Section 3.6.D.3 and 3.6.D.4
ML04197045017 August 2004License Amendment, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.DShutdown Margin
Probabilistic Risk Assessment
ML04110000922 July 2004License Amendment, Eliminate Requirements for Hydrogen AnalyzersProbabilistic Risk Assessment
Fuel cladding