 Issue dateTitleTopic
ML21217A1755 August 2021Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version
ML20328A2971 December 2020Amendment No. 253 - Non-Safeguards Version
ML19276C4202 January 2020Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled ConditionCyber Security
Exemption Request
ML19274C6742 January 2020Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled ConditionOffsite Dose Calculation Manual
Exemption Request
Minimum staff
Fire Protection Program
ML19142A04318 December 2019Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled ReactorProbabilistic Risk Assessment
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
License Renewal
Exemption Request
Earthquake
Control of Heavy Loads
Fuel cladding
Grace period
Fatality
ML19235A05027 August 2019Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming AmendmentSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML19170A25022 August 2019Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003)Exemption Request
Fire Protection Program
ML19122A19911 June 2019Review of Spent Fuel Management PlanExemption Request
ML18284A37530 November 2018Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled ConditionAbnormal operational transient
Severe Accident Management Guideline
Minimum staff
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML17066A13010 July 2017Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304)
ML17093A89412 May 2017Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093)
ML17058A32512 April 2017Approval of Certified Fuel Handler Training and Retraining ProgramHigh Radiation Area
Job Performance Measure
Backfit
ML16250A22328 October 2016Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry TechnicianSafe Shutdown
Cyber Security
Fire Protection Program
ML16251A62013 September 2016Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097)
ML16082A4606 June 2016Issuance of Amendment Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
ML16093A02831 May 2016Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1Liquid penetrant
ML16124B0873 May 2016E-mail Review of Safety Evaluation for Proposed Alternative Relief Request No. PRR-51Incorporated by reference
Pressure and Temperature Limits Report
ML16042A29115 March 2016Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME CodeIncorporated by reference
Pressure and Temperature Limits Report
ML16008B0773 March 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Hardened vent
Fire Protection Program
ML15338A3095 January 2016Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702Nondestructive Examination
Incorporated by reference
ML15166A40119 June 2015Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection IntervalIncorporated by reference
ML15114A0216 May 2015Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment RequestSafe Shutdown
Anticipated operational occurrence
Cyber Security
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML15103A06921 April 2015Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii ExaminationIncorporated by reference
ML15084A02523 March 2015Non-Proprietary - Safety Evaluation - Fourth 10-Year Interval Inservice Inspection - Request for Relief PRR-24Incorporated by reference
ML14272A07012 March 2015Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open TransientSafe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Cyber Security
Fuel cladding
Fire Protection Program
ML14336A66111 December 2014Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482)Safe Shutdown
Cyber Security
Fire Protection Program
ML14295A68531 October 2014Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling OperationsSafe Shutdown
Safe Shutdown Earthquake
Cyber Security
Safeguards Contingency Plan
Earthquake
Control of Heavy Loads
Fire Protection Program
Affidavit
ML14210A2668 August 2014Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 &
ML14198A1571 August 2014Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370)
ML14083A63127 March 2014Relief Request PRR-22 Regarding a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping WeldsProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
ML13149A21529 May 2013Correction to Staff Assessment Letter to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentFukushima Dai-Ichi
ML13127A17921 May 2013Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentHigh winds
FLEX
Fukushima Dai-Ichi
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML12261A13013 November 2012Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation MilestoneSafe Shutdown
Cyber Security
Fire Protection Program
ML1220100487 August 2012Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip SetpointSafe Shutdown
Cyber Security
Overtravel
Fire Protection Program
ML12174A14710 July 2012Safety Evaluation for Relief Request PRR-21, Rev 4, to Install a Weld Overlay on RPV-n14-1 Standby Liquid Control Safe-End Nozzle Weld at PilgrimNon-Destructive Examination
Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML11152A04322 July 2011License Amendment, Cyber Security PlanSafe Shutdown
Cyber Security
Fire Protection Program
ML11065000928 March 2011Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety ValvesSafe Shutdown
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
MELLLA
Fire Protection Program
Weak link
ML11005029826 January 2011Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLRSafe Shutdown
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Fire Protection Program
ML10229016325 August 2010Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power StationIncorporated by reference
ML09362080722 January 2010Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St
ML09362089522 January 2010Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power
ML09287064729 October 2009Request for Threshold Determination Under 10 CFR 50.80-Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Nos. 1, 2 and 3, Palisades, Pilgrim, Vermont Yankee
ML0927301379 October 2009Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries
ML09237054911 September 2009Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power StationNon-Destructive Examination
Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML09113045630 April 2009Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Pilgrim Nuclear Power StationNondestructive Examination
Incorporated by reference
ML09064022426 March 2009License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop OperationSafe Shutdown
Anticipated operational occurrence
Abnormal operational transient
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML08157036620 November 2008License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope HabitabilitySafe Shutdown
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Earthquake
Recently irradiated fuel
Fire Protection Program