Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21217A175 | 5 August 2021 | Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version | Safeguards Contingency Plan |
ML20328A297 | 1 December 2020 | Amendment No. 253 - Non-Safeguards Version | Safeguards Contingency Plan |
ML19276C420 | 2 January 2020 | Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition | Cyber Security Exemption Request |
ML19274C674 | 2 January 2020 | Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition | Offsite Dose Calculation Manual Exemption Request Minimum staff Fire Protection Program Potassium iodide |
ML19142A043 | 18 December 2019 | Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor | Probabilistic Risk Assessment B.5.b Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation License Renewal Exemption Request Earthquake Control of Heavy Loads Fuel cladding Grace period Fatality Water rod Potassium iodide |
ML19235A050 | 27 August 2019 | Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML19170A250 | 22 August 2019 | Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) | Exemption Request Fire Protection Program |
ML19122A199 | 11 June 2019 | Review of Spent Fuel Management Plan | Exemption Request |
ML18284A375 | 30 November 2018 | Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition | Abnormal operational transient Severe Accident Management Guideline Minimum staff |
ML18128A067 | 8 June 2018 | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 | Incorporated by reference Operability Determination Through-Wall Leak Through-Wall Leakage |
ML17066A130 | 10 July 2017 | Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) | |
ML17093A894 | 12 May 2017 | Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093) | |
ML17058A325 | 12 April 2017 | Approval of Certified Fuel Handler Training and Retraining Program | High Radiation Area Job Performance Measure Backfit |
ML16250A223 | 28 October 2016 | Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML16251A620 | 13 September 2016 | Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) | |
ML16082A460 | 6 June 2016 | Issuance of Amendment Cyber Security Plan Implementation Schedule | Safe Shutdown Cyber Security Fire Protection Program |
ML16096A269 | 6 June 2016 | Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 | Functionality Assessment Operability Determination Liquid penetrant |
ML16093A028 | 31 May 2016 | Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 | Flow Accelerated Corrosion Liquid penetrant |
ML16124B087 | 3 May 2016 | E-mail Review of Safety Evaluation for Proposed Alternative Relief Request No. PRR-51 | Incorporated by reference Pressure and Temperature Limits Report License Renewal |
ML16042A291 | 15 March 2016 | Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME Code | Incorporated by reference Pressure and Temperature Limits Report License Renewal |
ML16008B077 | 3 March 2016 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | High winds Shutdown Margin High Radiation Area Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Emergency Lighting Locked High Radiation Area FLEX B.5.b Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Hardened vent Fire Protection Program GOTHIC |
ML15338A309 | 5 January 2016 | Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702 | Non-Destructive Examination Incorporated by reference |
ML15166A401 | 19 June 2015 | Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection Interval | Incorporated by reference Stress corrosion cracking |
ML15114A021 | 6 May 2015 | Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request | Safe Shutdown Anticipated operational occurrence Cyber Security Minimum Critical Power Ratio Fuel cladding Fire Protection Program |
ML15103A069 | 21 April 2015 | Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii Examination | Incorporated by reference |
ML15084A025 | 23 March 2015 | Non-Proprietary - Safety Evaluation - Fourth 10-Year Interval Inservice Inspection - Request for Relief PRR-24 | Incorporated by reference |
ML14272A070 | 12 March 2015 | Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient | Safe Shutdown Unanalyzed Condition Anticipated operational occurrence Cyber Security Fuel cladding Fire Protection Program |
ML14336A661 | 11 December 2014 | Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) | Safe Shutdown Cyber Security Fire Protection Program |
ML14295A685 | 31 October 2014 | Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations | Safe Shutdown Safe Shutdown Earthquake Cyber Security Safeguards Contingency Plan Earthquake Control of Heavy Loads Fire Protection Program Affidavit |
ML14210A266 | 8 August 2014 | Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & | |
ML14198A157 | 1 August 2014 | Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370) | |
ML14083A631 | 27 March 2014 | Relief Request PRR-22 Regarding a Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds | Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Intergranular Stress Corrosion Cracking Water hammer |
ML13149A215 | 29 May 2013 | Correction to Staff Assessment Letter to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Fukushima Dai-Ichi |
ML13127A179 | 21 May 2013 | Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | High winds FLEX Fukushima Dai-Ichi |
ML13025A306 | 14 March 2013 | ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications | Safeguards Contingency Plan |
ML12261A130 | 13 November 2012 | Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone | Safe Shutdown Cyber Security Fire Protection Program |
ML122010048 | 7 August 2012 | Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint | Safe Shutdown Cyber Security Safeguards Contingency Plan Overtravel Fire Protection Program |
ML12174A147 | 10 July 2012 | Safety Evaluation for Relief Request PRR-21, Rev 4, to Install a Weld Overlay on RPV-n14-1 Standby Liquid Control Safe-End Nozzle Weld at Pilgrim | Non-Destructive Examination Weld Overlay Hydrostatic Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML11152A043 | 22 July 2011 | License Amendment, Cyber Security Plan | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program Cyber attack |
ML110650009 | 28 March 2011 | Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves | Safe Shutdown Stroke time Anticipated operational occurrence Probabilistic Risk Assessment MELLLA Safeguards Contingency Plan Fire Protection Program Weak link Simmer margin |
ML110050298 | 26 January 2011 | Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLR | Safe Shutdown Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Safeguards Contingency Plan License Renewal Fire Protection Program |
ML102290163 | 25 August 2010 | Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power Station | Incorporated by reference |
ML093620807 | 22 January 2010 | Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St | |
ML093620895 | 22 January 2010 | Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power | |
ML092870647 | 29 October 2009 | Request for Threshold Determination Under 10 CFR 50.80-Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Nos. 1, 2 and 3, Palisades, Pilgrim, Vermont Yankee | |
ML092730137 | 9 October 2009 | Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries | |
ML092370549 | 11 September 2009 | Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power Station | Non-Destructive Examination Weld Overlay Hydrostatic Incorporated by reference Finite Element Analysis Liquid penetrant Dissimilar Metal Weld |
ML091130456 | 30 April 2009 | Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Pilgrim Nuclear Power Station | Nondestructive Examination Incorporated by reference |
ML090640224 | 26 March 2009 | License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation | Safe Shutdown Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding Fire Protection Program |
ML081570366 | 20 November 2008 | License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability | Safe Shutdown Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Safeguards Contingency Plan Earthquake Recently irradiated fuel Fire Protection Program |