Letter Sequence Other |
---|
TAC:ME4679, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting
Results
Other: GNRO-2012/00150, Final Report for Replacement Steam Dryer, GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, ML102660403, ML111720830, ML112560396, ML12167A257, ML12167A269, ML12177A287, ML13108A217, NRC-2012-0105, Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
|
MONTHYEARML1026604002010-08-20020 August 2010 GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull Withholding from Public Disclosure Proprietary Report NEDC-33477P Project stage: Request ML1026603992010-08-31031 August 2010 NEDO-33477, Revision 0, Safety Analysis Report for Grand Gulf Nuclear Station Constant Pressure Power Uprate. Project stage: Request ML1026604032010-09-0808 September 2010 License Amendment Request Extended Power Uprate Project stage: Other GNRO-2010/00056, NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G2010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G Project stage: Request ML1026604062010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix B Through Appendix D Project stage: Request ML1026604012010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Cover Through Appendix a Project stage: Request ML1030102002010-11-0909 November 2010 Supplemental Information Needed for Acceptance of License Amendment Request, Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Megawatts Thermal Project stage: Acceptance Review GNRO-2010/00071, Supplemental Information, License Amendment Request, Extended Power Uprate2010-11-18018 November 2010 Supplemental Information, License Amendment Request, Extended Power Uprate Project stage: Supplement GNRO-2010/00073, Supplemental Information License Amendment Request, Extended Power Uprate2010-11-23023 November 2010 Supplemental Information License Amendment Request, Extended Power Uprate Project stage: Supplement ML1034201082010-12-16016 December 2010 Request for Withholding Information from Public Disclosure, 9/7/10 Affidavit Executed by E. Schrull, GEH Re NEDC-33601P Project stage: Withholding Request Acceptance ML1034705862011-01-0505 January 2011 Request for Withholding Information from Public Disclosure, 11/19/10 Affidavit Executed by E. Schrull, GE-Hitachi, Regarding NEDC-33621P Project stage: Withholding Request Acceptance ML1102602812011-01-26026 January 2011 E-mail, Request for Additional Information Instrument and Controls, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102602872011-01-26026 January 2011 E-mail, Request for Additional Information Fire Protection, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102701872011-01-27027 January 2011 Request for Additional Information, Emcb Non-Steam Dryer Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1103103902011-01-31031 January 2011 E-mail, Request for Additional Information, Vessels and Internal Integrity Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1103901732011-02-0808 February 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00012, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00011, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1105407052011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dirs/Ihpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1105407122011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dra/Apla Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00013, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1034200962011-02-25025 February 2011 Request for Withholding Information from Public Disclosure, 8/20/10 Affidavit Executed by E. Schrull, GEH, for NEDC-33477P Project stage: Withholding Request Acceptance ML1106007172011-03-0101 March 2011 Email Request for Additional Information, Round 2, Nrr/Dci/Cvib Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00016, Request for Additional Information Regarding Extended Power Uprate2011-03-0909 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1107501322011-03-16016 March 2011 Email, Dose Assessment Branch, Request for Additional Information, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202242011-03-23023 March 2011 Email, Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202272011-03-23023 March 2011 Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00018, Request for Additional Information Regarding Extended Power Uprate2011-03-30030 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00021, Response to Request for Additional Information Regarding Extended Power Uprate2011-03-31031 March 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1109401362011-04-0404 April 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502722011-04-0505 April 2011 Email, Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502812011-04-0505 April 2011 Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1110301112011-04-12012 April 2011 Email, Request for Additional Information, Nrr/Dss/Snpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00024, Response to Request for Additional Information Regarding Extended Power Uprate2011-04-14014 April 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML11112A0982011-04-21021 April 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1110401002011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/28/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00018 Project stage: Withholding Request Acceptance ML1110401252011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00013 Project stage: Withholding Request Acceptance ML1110401132011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011 Project stage: Withholding Request Acceptance ML1110401072011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/17/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00012 Project stage: Withholding Request Acceptance ML1110401162011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/30/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00021 Project stage: Withholding Request Acceptance GNRO-2011/00035, Response to Request for Additional Information Regarding Extended Power Uprate2011-05-0505 May 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1113001562011-05-10010 May 2011 Email, Request for Additional Information, Nrr/Dss/Scvb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00037, Request for Additional Information Regarding Extended Power Uprate2011-05-11011 May 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1114002992011-05-20020 May 2011 E-mail, Request for Additional Information, Nrr/Dci/Emcb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1113905252011-05-31031 May 2011 Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025 Project stage: Withholding Request Acceptance ML1115204582011-06-0101 June 2011 Email, Request for Additional Information, Nrr/Dra/Aadb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1115304392011-06-0606 June 2011 (Redacted) Request for Additional Information from Nrr/De/Emcb Steam Dryer, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00043, Request for Additional Information Regarding Extended Power Uprate2011-06-0808 June 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00046, Response to Request for Additional Information Regarding Extended Power Uprate2011-06-15015 June 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1117200422011-06-20020 June 2011 Licensee Response Regarding Request for Additional Information on Training for Prnms (TAC No. 4679) Project stage: Request 2011-03-30
[Table View] |
|
---|
Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML21148A1992021-05-28028 May 2021 Supplemental Information to Correct License Amendment Request to Revise Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool ML21103A0552021-05-12012 May 2021 May 2021 Pilgrim Nuclear Power Station Issuance of Amendment 254 to Revise the Physical Security Plan Alternative Measures, Cover Letter and Amendment ML21076A4042021-03-17017 March 2021 License Amendment Request to Revise Pilgrim Nuclear Power Station Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool L-21-036, Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan2021-03-17017 March 2021 Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan L-21-008, License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan2021-02-18018 February 2021 License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan L-20-024, Attachments 1 - 3: Summary of Evaluation of Proposed Changes, Proposed Change to PNPS Renewed Facility License Condition 3.G (Mark-up) and (Clean Copy)2020-04-0202 April 2020 Attachments 1 - 3: Summary of Evaluation of Proposed Changes, Proposed Change to PNPS Renewed Facility License Condition 3.G (Mark-up) and (Clean Copy) ML19170A1492019-08-22022 August 2019 Enclosure 2, Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)2018-11-16016 November 2018 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) ML18218A1742018-08-0101 August 2018 Revised the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition ML18023A6912018-01-12012 January 2018 Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition ML18023A6872018-01-12012 January 2018 License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition ML17101A6082017-03-30030 March 2017 License Amendment Request - Cyber Security Plan Implementation Schedule ML17053A4682017-02-14014 February 2017 Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition ML16021A4592016-01-14014 January 2016 Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry Technician ML15205A2872015-07-15015 July 2015 License Amendment Request - Cyber Security Plan Implementation Schedule ML14042A1662014-01-31031 January 2014 License Amendment Request - Cyber Security Plan Implementation Schedule ML13346A0262013-11-26026 November 2013 Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling Operations ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel ML13108A2172013-04-0505 April 2013 Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d) ML12005A1982011-12-29029 December 2011 Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup ML11312A0512011-10-28028 October 2011 Proposed License Amendment: Revision to Technical Specification (TS) Table 3.2.B for the Condensate Storage Tank (CST) Low Level Trip Setpoint & Corrections to Typographical Errors Incurred During Prior License Amendment. ML1100502982011-01-26026 January 2011 Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLR ML1102000582011-01-0707 January 2011 License Renewal Application, Supplemental Information ML1019703592010-07-15015 July 2010 Submittal of License Amendment Request, Cyber Security Plan ML1002700542010-01-24024 January 2010 Proposed License Amendment to Technical Specifications: Revised P-T Limit Curves and Relocation of Pressure-Temperatures (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0828301352008-09-30030 September 2008 Request for License Amendment for Licensee Name Changes ML0734600622007-11-29029 November 2007 Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3) ML0721906112007-07-30030 July 2007 License Renewal Application Amendment 19 ML0717304672007-06-21021 June 2007 License Renewal Application Amendment 18 ML0715503102007-05-17017 May 2007 License Renewal Application Amendment 17 ML0707903162007-03-13013 March 2007 License Renewal Application Amendment 15 ML0706503502007-02-23023 February 2007 License Renewal Application Amendment 14 ML0703702982007-01-30030 January 2007 E-MAIL: (PD) Pilgrim LRA Amendment 13 ML0703802272007-01-17017 January 2007 E-MAIL: (PD) Pilgrim LRA Amendment 12 ML0702302862007-01-16016 January 2007 License Renewal Application Amendment 12 ML0702302932007-01-15015 January 2007 Proposed Change to Applicability of Pilgrim'S Pressure - Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, and 3.6.3, Revision 1 ML0702501752007-01-10010 January 2007 License Renewal Application Amendment 11 ML0701105012007-01-0404 January 2007 Technical Specification Revisions for Control Rod Operability Scram Insertion Times and Control Rod Accumulator Requirements ML0700404412006-12-27027 December 2006 License Amendment Request for Adoption of TSTF-484 Revision 0, Use TS 3.10.1 for Scram Time Testing Activities ML0701004102006-12-12012 December 2006 2006/12/12-Letter from Entergy to NRC Dated 12 December, 2006 (Including Attached PNPS MACCS2 Input Files -attached Cd) Regarding License Renewal Application Amendment for Pilgrim Station Operating License ML0631303512006-11-0202 November 2006 Application for Technical Specification (TS) Change to Add LCO 3.0.8 on the Inoperability of Snubbers (and Adoption of TS Bases for LCO 3.0.8) Using the Consolidated Line Item Improvement Process (CLIIP) ML0635601142006-10-25025 October 2006 Reactor Pressure Vessel Fluence Evaluation at End of Cycle 15 and 54 EFPY (Non-Proprietary) ML0625001172006-08-30030 August 2006 2006/08/30-Pilgrim, Response to Requests for Additional Information Re License Renewal Application Amendment 7 ML0624904892006-08-30030 August 2006 Technical Specification Amendment Request to Relocate Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, ML0619401752006-07-0505 July 2006 2006/07/05-Pilgrim - License Renewal Application Amendment 3 ML0618704692006-06-30030 June 2006 Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems ML0610908322006-04-12012 April 2006 Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves ML0603000282006-01-25025 January 2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application ML0530404502005-10-18018 October 2005 Technical Specifications Amendment Request for Single Control Withdrawal Allowances, TS 3/4.14 Special Operations. 2021-05-28
[Table view] Category:Technical Specifications
MONTHYEARML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML17163A1812017-05-25025 May 2017 Supplemental to Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition ML17053A4682017-02-14014 February 2017 Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition ML16363A2662017-01-10010 January 2017 Correction to Amendment No. 234 Change in Technical Specification Measurement Frequency from 18 Months to 24 Months ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML14259A3812014-09-11011 September 2014 Supplement to Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling Operations ML13108A2172013-04-0505 April 2013 Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d) CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications ML12005A1982011-12-29029 December 2011 Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup ML0731004782007-11-0505 November 2007 Technical Specifications, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements ML0726101972007-09-18018 September 2007 Technical Specifications, Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0726102002007-05-17017 May 2007 Technical Specifications, Corrected Page II (Fixed Administrative Error) ML0715605422007-04-25025 April 2007 Tech Spec Pages for Amendment 228 Single Control Rod Withdrawal Allowances ML0714303052007-04-25025 April 2007 Technical Specifications, Limiting Conditions for Operation ML0708603592007-03-26026 March 2007 Technical Specifications, Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities. ML0708603392007-02-22022 February 2007 Technical Specifications, Modify the TSs to Extend the Use of the Current Pressure-Temperature Limits as Specified in TS Figures 3.6.1, 3.6.2, and 3.6.3 Through the End of Operating Cycle 18 ML0702302932007-01-15015 January 2007 Proposed Change to Applicability of Pilgrim'S Pressure - Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, and 3.6.3, Revision 1 ML0631303512006-11-0202 November 2006 Application for Technical Specification (TS) Change to Add LCO 3.0.8 on the Inoperability of Snubbers (and Adoption of TS Bases for LCO 3.0.8) Using the Consolidated Line Item Improvement Process (CLIIP) ML0626405822006-09-20020 September 2006 Tech Spec Pages for Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions ML0626202402006-09-14014 September 2006 Technical Specification Pages Re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report ML0624904892006-08-30030 August 2006 Technical Specification Amendment Request to Relocate Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, ML0622800132006-08-0909 August 2006 Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities ML0622301672006-08-0404 August 2006 Tech Spec Pages for Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature ML0618704692006-06-30030 June 2006 Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems ML0613000952006-05-0505 May 2006 Correction to Amendment No. 221 Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications ML0610702152006-04-13013 April 2006 Technical Specification Page, Deletes the Main Steam Isolation Valve Twice Per Week Partial Stroke Testing Surveillance Specified in Technical Specification 4.7.A.2.b.1.c ML0610702042006-04-13013 April 2006 Technical Specification Page Re Revised Rod Worth Minimizer Bypass Allowances ML0610908322006-04-12012 April 2006 Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves ML0610701672006-04-12012 April 2006 Tech Spec Pages for Amendment 219 Regarding Single Recirculation Loop Operation ML0611402652006-04-10010 April 2006 Technical Specification Pages Re Revised Applicability for Containment Oxygen and Differential Pressure Limits ML0524301522005-08-29029 August 2005 Technical Specification Pages Re Surveillance Frequency Improvements ML0521400792005-07-29029 July 2005 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Valves ML0515204742005-05-24024 May 2005 Technical Specifications Amendment Request to Revise Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Applicability Requirements ML0515204582005-05-24024 May 2005 Technical Specifications Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowances ML0515204732005-05-24024 May 2005 Request for Amendment to the Technical Specifications to Delete Requirement Related to NRC Approval of Engineering Evaluation for Elevated Safety Relief Valve Discharge Pipe Temperature ML0512200952005-04-28028 April 2005 Technical Specifications, Eliminates Secondary Containment Operability Requirements When Handling Sufficiently Decayed Irradiated Fuel or Performing Core Alterations ML0510400322005-04-12012 April 2005 Technical Specifications, Revision to Surveillance Requirement Frequency for Containment and Suppression Pool Spray Headers and Nozzles ML0509004102005-03-30030 March 2005 Technical Specifications, Allows One-time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML0507601772005-03-16016 March 2005 Tech Spec Pages for Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements ML0503800052005-02-0202 February 2005 Tech Spec Page for Amendment 210 Changes to Technical Specifications Table 3.2.C-1 ML0500701552005-01-0505 January 2005 Technical Specification Pages for Amendment No. 209 to License No. DPR-35 ML0423206092004-08-17017 August 2004 Technical Specifications, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D ML0420502772004-07-22022 July 2004 Tech Spec Pages for Amendment 206 Elimination of Requirements for Hydrogen Analyzers ML0403307902004-01-30030 January 2004 License Amendment, Tech Spec Pages ML0332100752003-11-14014 November 2003 Revised TS Page 5.0-7, Eliminating Requirements for Post-Accident Sampling System 2020-12-01
[Table view] |
Text
' En tergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Robert G. Smith, RE.
Site Vice President April 5, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Proposed License Amendment: Revision to Technical Specification (TS) 2.1, Safety Limits To Resolve Pressure Regulator Fail-Open (PRFO)
Transient Reported by General Electric Nuclear Energy In Accordance with 10 CFR 21.21(d)
REFERENCES:
- 1. GE- Nuclear Energy, "10 CFR 21 Reportable Condition Notification: Potential to Exceed Low Pressure Technical Specification Safety Limit", MFN 05-021, March 29, 2005
- 2. Grand Gulf Nuclear Station Unit 1, Issuance of.Amendment No.
191, RE.: Extended Power Uprate (pages 324-325), dated July 18, 2012 (TAC NO. ME 4679)
LETTER NUMBER: 2.13.009
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) requests an amendment to the Pilgrim Operating License Technical Specifications (TS). The proposed amendment reduces the reactor dome pressure from 785 psig to 685 psig in TS 2.1.1 and 2.1.2 Safety Limits, and associated Bases, and adds NRC approved References to resolve the Pressure Regulator Failure-Open (PRFO) transient reported by GE Nuclear Energy in Reference 1.
Attachment 1 to this letter provides "Evaluation of Proposed TS Changes" and Attachment 2 provides "Marked-up Pages of the Current TS and Bases". The marked-up Technical Specification Bases pages are provided for information only.
The proposed changes have been evaluated in accordance with 10 CFR 50.92(c) and determined that the changes involve no significant hazards considerations. Attachment 1 provides the No Significant Hazards Consideration Determination for the proposed change.
Attachment 2 provides marked-up pages of the current TS and Bases. Marked-up Bases pages are provided for information only. b
Entergy Nuclear Operations, Inc Letter Number 2.13.009 Pilgrim Nuclear Power Station Page 2 of 2 The proposed TS Amendment follows the Grand Gulf License Amendment 191, dated July 18, 2012 (Reference 2).
Entergy requests NRC approval of the proposed Pilgrim TS amendment by April 30, 2014.
Once approved, the amendment will be implemented within 60 days.
This letter contains no new regulatory commitments.
If you have any questions regarding the subject matter, please contact Joseph R. Lynch at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the
,_ ;___day of
_ ,,,'/ ,2013.
Sincerely, Robert G. Smith, P.E.
Site Vice President : Evaluation of Proposed TS Changes (6 pages). : Marked-up Pages of the Current TS and Bases (6 pages).
cc: Mr. Richard Guzman, Project Manager NRC Resident Inspector Division of Operating Reactor Licensing Pilgrim Nuclear Power Station Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 John Giarrusso, Jr.
Planning and Preparedness and Nuclear Section Chief Mass Emergency Management Agency (MEMA) 400 Worcester Road Framingham, MA 01702 Beverly Anderson Interim Director, Massachusetts Department of Public Health (MDPH)
Radiation Control Program Commonwealth of Massachusetts 529 Main Street, Suite 1M2A Charlestown, MA 02129-1121
Attachment 1 to Enterqy Letter 2.13.009 Evaluation of Proposed TS Changes Evaluation of Proposed TS Changes
- 1. DESCRIPTION
- 2. PROPOSED CHANGES
- 3. BACKGROUND
- 4. TECHNICAL ANALYSIS
- 5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
- 6. ENVIRONMENTAL CONSIDERATION
- 7. COORDINATION WITH PENDING TS CHANGE REQUESTS
- 8. REFERENCES Page 1 of 6
Attachment 1 to Enterqy Letter 2.13.009 Evaluation of Proposed TS Changes
1.0 DESCRIPTION
On March 29, 2005, GE Nuclear Energy (GE) issued a Safety Communication (SC 05-03) in accordance with 10 CFR 21.21(d) to Entergy, invoking a Reportable Condition for Potential Violation of Low Pressure Technical Specification (TS) Safety Limit (SL) (Reference 1). GE identified an unanalyzed condition where a Pressure Regulator Failure Open (PRFO) -
Maximum Demand Abnormal Operation Occurrence (AOO) may cause a TS SL to be violated since reactor dome pressure could drop below the current TS SL 2.1 value of 785 psig while reactor power is above 25% of rated thermal power (RTP). GE identified that even plants with an MSIV low pressure isolation setpoint > 785 psig may experience an AOO that potentially could violate the SL.
GE informed the affected licensees that their recent code calculations showed that during the PRFO transient, reactor pressure could fall below the TS safety limit. Depending upon the Low Pressure Isolation Setpoint (LPIS), the margin to the low pressure TS SL may not be adequate.
GE Nuclear recommended lowering the low pressure TS safety limit to 700 psia (685 psig), as supported by the expanded GEXL correlation applicability range for GE14 and GNF2 fuels that are currently co-resident in Pilgrim Reactor Core.
GE advanced fuel designs have an NRC approved critical power correlation with a lower-bound pressure significantly below the 785 psig reactor steam dome pressure specified in TS Reactor Core Safety Limits 2.1.1 and 2.1.2. Entergy proposes to utilize this fact and reduce the reactor steam dome pressure safety limit consistent with the approved lower-bound pressure for the GE fuel comprising the Pilgrim reactor core. GE fuel utilizes the GEXL critical power correlation, with an approved pressure range from 700 to 1400 psia (685 to 1385 psig). Entergy has determined that changing the pressure limit in TS Safety Limit 2.1 to 685 psig as permitted by References 2 and 3, provides adequate margin for the PRFO transient, such that the dome pressure will remain above the revised TS 2.1 safety limit.
Accordingly, pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby requests an amendment to the Pilgrim Operating License Technical Specifications (TS). The proposed amendment revises the reactor dome pressure from 785 psig to 685 psig in TS Safety Limits 2.1.1 and 2.1.2 and TS Bases 2.1.1, 3.1 and 3.2 to resolve the potential to violate these limits during a pressure regulator failure open (PRFO) transient.
Pilgrim proposed TS change follows the NRC approved TS change for Grand Gulf by License Amendment No. 191, dated July 18, 2012 (TAC NO. ME 4679).
2.0 . PROPOSED CHANGES 2.1 The proposed changes to the Technical Specifications are as follows:
The reactor dome pressure 785 psig is revised to 685 psig in TS Safety Limits 2.1.1 and 2.1.2.
2.2 The current reactor dome pressure value of 785 psig is revised to 685 psig in the TS Bases Pages B2-1, 82-2, and B3/4.2-2.
The Bases on B3/4.1-5 is revised to describe the role of the MSIV closure in preventing power operation with reactor pressure below 685 psig and core thermal power greater than 25% of rated thermal power.
Page 2 of 6
Attachment 1 to Enteray Letter 2.13.009 Evaluation of Proposed TS Changes Additionally, Reference (5) is deleted as it is no longer applicable and the following three References are added on TS Bases Page B2-4:
NEDC-32851P-A, Rev. 4, "GEXL14 Correlation for GE 14 Fuel", dated September 15, 2008 NEDC-33292P, Rev. 3, "GEXL17 Correlation for GNF2 Fuel", dated June 2009 NEDC-33270P, Rev. 4, "GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II)", dated October 2011 The BASES pages are provided for NRC information only. TS BASES changes will be incorporated into TS upon receipt of the NRC approved License Amendment in accordance with TS 5.5.6, Bases Control Program. The above referenced documents are contained in fuel design information reports in accordance with GESTAR-II Section 1.2.7. Therefore, these documents are included by reference.
3.0 BACKGROUND
References 2 and 3 documented the expanded pressure range for GEXL correlations for the current co-resident fuels, GE14 and GNF2 in the Pilgrim Reactor Core. Subsequently, GE Part 21 (Reference 1) identified an Anticipated Operational Occurrence (AOO) due to a Pressure Regulator Maximum Demand Open (PRFO) transient that could potentially result in violations of the low pressure Safety Limits in TS 2.1.1 and 2.1.2 as it is currently set at 785 psig.
Entergy reviewed the GEXL14 and GEXL17 correlations approved by the NRC in NEDC-32851 P-A, Rev. 4 and NEDC-33292P, Rev. 3 (References 2 and 3), and concluded that the GEXL14 and GEXL17 correlations apply for GE14 and GNF2 fuel respectively. Since the Pilgrim core has both GE14 and GNF2 fuel, Pilgrim is proposing to reduce the current 785 psig reactor dome pressure limit in Safety Limits 2.1.1 and 2.1.2 and associated TS Bases to 685 psig, using GESTAR II, NRC approved documents (References 2, 3 and 5). The proposed reduction in the safety limit dome pressure is consistent with the pressure range specified in the NRC approved critical power correlations for GE14 and GNF2 fuel designs.
Entergy reviewed the GEXL14 and GEXL17 correlations in NEDC-32851P-A, Rev. 4 and NEDC-33292P, Rev. 3 for GE14 and GNF2 fuel respectively and has determined that they are applicable to the GE14 and GNF2 fuel used in the Pilgrim core. The proposed reduction in the current 785 psig reactor pressure limit in TS SL 2.1. to 685 psig is within the range of applicable pressures in the GEXL correlations.
The NRC has approved NEDC-32851P-A for use. The GEXL17 correlation for GNF2 fuel, NEDC-33292P, is approved for use per NEDE-24011-P-A "General Electric Standard Application for Reactor Fuel (GESTAR II)" by reference. NEDE-24011 specifically states:
Fuel design compliance with the fuel licensing acceptance criteriaconstitutes USNRC acceptance and approval of the fuel design without specific USNRC review. The fuel licensing acceptance criteriaare presented in the subsections that follow.
The fuel licensing acceptance criteria for a new critical power correlation can be found in GESTAR II subsection 1.1.7. NEDC-33270P (Reference 5) documents that GESTAR II subsection 1.1.7 criteria for a new correlation are met. Therefore, per GESTAR II, the GEXL17 correlation is approved for use.
Page 3 of 6
Attachment 1 to Enter-qv Letter 2.13.009 Evaluation of Proposed TS Chanqes This change ensures reactor pressure remains above the proposed low pressure limit of 685 psig with reactor power greater than 25% of rated during a Pressure Regulator Fail Open (PRFO) transient. Thus the proposed change based on the updated GEXL pressure range documented by GEH, resolves the concern reported by GEH in Safety Communication SC05-03.
The proposed TS change follows the TS changes previously approved for Grand Gulf by License Amendment 191, dated July 18, 2012 (TAC NO. ME 4679) (Reference 4).
4.0 TECHNICAL ANALYSIS
The potential pressure regulator failure open event involves the failure of the pressure regulator in the open direction causing the turbine control valves to fully open, including the bypass valves. This causes the reactor to depressurize rapidly. When, the Main Steam Line (MSL) low pressure setpoint is reached, the Main Steam Isolation Valves (MSIVs) start to close and a reactor scram occurs. As the MSIVs approach full closure, reactor depressurization terminates and pressure commences to rise to the safety-relief valve setpoint, thus preventing reactor pressure from decreasing below the proposed safety limit of 685 psig while core thermal power is still above 25% of rated thermal power. The fuel cladding integrity is never challenged because in pressure decrease events like this in a BWR, fuel critical power is rising and therefore MCPR rises during the event.
Technical Specification (TS) Safety Limits are specified to ensure that acceptable fuel design limits are not exceeded during steady state operation, normal operational transients, and anticipated operational occurrences (AOOs). Reactor core Safety Limits are set such that fuel cladding integrity is maintained and no significant fuel damage would occur if the Safety Limits are not exceeded. Consistent with the Improved Technical Specifications (ITS), Pilgrim specifies Safety Limits in TS 2.1.1 and 2.1.2 to require that thermal power shall be < 25% Rated Thermal Power (RTP) when reactor steam dome pressure is < 785 psig or core flow is < 10% of RTP.
This Safety Limit was introduced to ensure the validity of MCPR calculations when power is >
25% and the reactor pressure is within the validity range of the GEXL correlation. GEH has updated the validity range of GEXL Correlations via References 2 and 3, which allows the pressure to be reduced to 685 psig from 785 psig. Therefore a wider pressure range is available for transients to demonstrate compliance with MCPR limits. Thus, the proposed change offers a greater pressure margin for a PRFO transient than what is currently available.
The Entergy proposed changes to the TS safety limits are based upon the NRC approved topical reports. The proposed change has already been authorized for Grand Gulf Nuclear Station Unit 1 (Reference 4). The Pilgrim proposed TS change follows NRC approved methodology and is acceptable.
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration Entergy requests a License Amendment to Pilgrim Operating License Technical Specifications (TS) to make the following changes:
- To reduce the reactor dome pressure from 785 psig to 685 psig in TS 2.1.1 and 2.1.2.
Entergy has evaluated the proposed Pilgrim TS changes using the criteria in 10 CFR 50.92, and has determined that the proposed changes do not involve a significant hazards consideration. The following information is provided to support a finding of no significant hazards consideration determination.
Page 4 of 6
Attachment 1 to Enteray Letter 2.13.009 Evaluation of Proposed TS Changqes
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No Decreasing the reactor dome pressure in Technical Specification Safety Limits 2.1.1 and 2.1.2 for reactor Rated Thermal Power ranges effectively expands the validity range for GEXL correlation and the calculation of Minimum Critical Power Ratio Safety Limit (MCPR). MCPR rises during the pressure reduction following the scram that terminates the PRFO transient. Since the change does not involve a modification of any plant hardware, the probability and consequence of the PRFO transient are essentially unchanged. The reduction in the reactor dome pressure value in the safety limit from 785 psig to 685 psig provides adequate margin to accommodate the pressure reduction during the transient within the revised TS limit.
The expanded GEXL correlation range supports Pilgrim's revised low pressure safety limit of 685 psig. The proposed TS revision involves no significant changes to the operation of any systems or components in normal or accident or transient operating conditions.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed reduction in the reactor dome pressure value in the safety limit from 785 psig to 685 psig reflects a wider range of applicability for the GEXL correlation which is approved by the NRC for fuels in use at Pilgrim and does not involve changes to the plant hardware or its operating characteristics. As a result, no new failure modes are being introduced.
Therefore, the change does not introduce a new or different kind of accident from those previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The margin of safety is established through the design of the plant structures, systems, and components, and through the parameters for safe operation and setpoints for the actuation of equipment relied upon to respond to transients and design basis accidents. The proposed change in reactor dome pressure restores the safety margin, which protects the fuel cladding integrity during a depressurization transient, but does not change the requirements governing operation or availability of safety equipment assumed to operate to preserve the margin of safety. The change does not alter the behavior of plant equipment, which remains unchanged. The reduction in the reactor dome pressure value in the safety limit from 785 psig to 685 psig provides adequate margin to accommodate the pressure reduction during the transient within the revised TS limit.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
Page 5 of 6
Attachment 1 to Entergy Letter 2.13.009 Evaluation of Proposed TS Changes Based upon the above, Pilgrim concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92 (c), and, accordingly, a finding of no significant hazards consideration is justified.
5.2 Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix A provides criteria for Emergency Core Cooling System (ECCS) performance and 10 CFR 50.36, Technical Specifications, requires safety system settings to ensure the integrity of the reactor pressure boundary during normal and abnormal operations and to mitigate transient and accident conditions. The proposed decrease in the reactor dome pressure limit in TS 2.1.1 and 2.1.2 follows the requirements cited above and ensures the fuel cladding integrity.
In conclusion, based on the considerations discussed above, (1) there is a reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the NRC's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
Entergy has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, "Standards for Protection Against Radiation." However, the proposed amendment does not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22, "Criterion for Categorical Exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review", Paragraph (c)(9). Therefore, in accordance with 10 CFR 51.22, Paragraph (b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7.0 COORDINATION WITH PENDING TS CHANGES There are no pending proposed TS changes that are being filed for license amendment that would impact the proposed TS changes.
8.0 REFERENCES
- 1. GE- Nuclear Energy, "10 CFR 21 Reportable Condition Notification: Potential to Exceed Low Pressure Technical Specification Safety Limit", MFN 05-021, March 29, 2005.
- 2. NEDC-32851P-A, Rev. 4, "GEXL14 Correlation for GE14 Fuel", dated September 15, 2008.
- 3. NEDC-33292P, Rev 3, "GEXL17 Correlation for GNF2 Fuel", dated June 2009.
- 4. Grand Gulf Nuclear Station Unit 1, Issuance of Amendment No. 191, RE.: Extended Power Uprate (pages 324-325), dated July 18, 2012 (TAC NO. ME 4679).
- 5. NEDC-33270P, Rev. 4, "GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II)", dated October 2011.
Page 6 of 6
Attachment 2 to Enterqy Letter 2.13.009 Marked-up Pa-ges of the Current TS and Bases (6 Pages)
- 1. TS Page 2-1
- 2. TS Bases Page B2-1
- 3. TS Bases Page B2-2
- 4. TS Bases Page B2-4
- 5. TS Bases Page B3/4.1-5
- 6. TS Bases Page B3/4.2-2
2.0 SAFETY LIMIM I I 2.1 SafetyLimit&
- 2. .t With the reactorsteam dome pressu4 psi r core ftlow < 10% of rated core flow,,i.
THERMAL POWER shall be 5 25% of RA.ED THERMAL POWER.
2,1.2 With the reactor steam dome pressur0Z5.
rated core low:.
.75 1sg and core flow > 10,%ot I MINIMUM CRITICAL POWER RATIO shall be a 1.08 for two recirculafion loop operation or > 1. 11 for single recirculation loop operation.
2.1.3 Whenever the reactor is in the cold shutdown condition wMth irradiated fuel in the reactor vessel, the water level shall not be less than 12 inches above the top of the normal active fuel zone.
2.1.4 Reactor steam dome pressure shall be S 1340 psig at any time when irradiated fuel is present in the reactor vessel.
e----
2.2 Safety Umit Violation With any Safety Uimit not met within two hours the following actions shall be met:
2.2.1 Restore compliance with all Safety Limits. and 2.2.2 Insert all insertable control rods.
) Af~gr'l~'lo No.Lil- ý-ý4W.J44 34;Lý/ 1.1
BASES:
2.0 SAFETY LIMITS w INTROODUCTION The fuel cladding, reactor pressure vessel and primary system piping are the principal barriers to the release of radioactive materials to the environs. Safety Limits are established to protect the integrity of these barriers during normal plant operations and anticipated transients. The fuel cladding integrity Safety Limit is set such that no fuel damage is calculated to occur if the limit is not violated. Because fuel damage is not directly observable, a stepback approach is used to establish a Safety Limit such that the Minimum Critical Power Ratio (MCPR) is not less than the limit specified in Specification 2.1.2. MCPR greater than the specified limit represents a conservative margin relative to the conditions required to maintain fuel cladding integrity.
The fuel cladding is one of the physical barriers which separate the radioactive materials from the environs. The integrity of this cladding barrier is related to its relative freedom from perforations or cracking. Although some corrosion or use-related cracking may occur during the life of the cladding, fission product migration from this source is incrementally cumulative and continuously measurable. Fuel cladding perforations, however, can result from thermal stresses which occur from reactor operation significantly above design conditions.
While fission product migration from cladding perforation is just as measurable as that from use-related cracking, the thermally caused cladding perforations signal a threshold beyond which still greater thermal stresses may cause gross rather than incremental cladding deterioration. Therefore, the fuel cladding Safety Limit is defined with a margin to the conditions which would produce onset of transition boiling (i.e., MCPR of 1.0).
These conditions represent a significant departure from the condition intended by design for planned operation. The MCPR fuel cladding integrity Safety Limit assures that during normal operation and during anticipated operational occurrences, at least 99.9% of the fuel rods in the core do not experience transition boiling.
Operation above the boundary of the nucleate boiling regime could result in excessive cladding temperature because of the onset of transition boiling and the resultant sharp reduction in heat transfer coefficient. Inside the steam film, high cladding temperatures are reached, and a cladding water (zirconium water) reaction may take place. This chemical reaction results in oxidation of the fuel cladding to a structurally weaker form. This weaker form may lose its integrity, resulting in an uncontrolled release of activity to the reactor coolant &.
FUEL CLAODING INTEGRITY (2.1.1)
GE critical power correlations are applicable for all critical power calculations at pressures at or above,,B psig or core flows at or above 10% of rated flow. For operation at low pressures and low flows another basis is used as follows:
/
) (Cont)
Revision W-or-82-1
BASES:
2.0 SAFETY LIMITS (Cont)
FUEL CLADDING Since the pressure drop in the bypass region is essentially INTEGRITY (2.1.1) all elevation head, the core pressure drop at low power and (Cont) flows will always be greater than 4.5 psi. Analyses show that with a bundle flow of 28 x 103 lbs/hr, bundle pressure drop is nearly independent of bundle power and has a value of 3.5 psi. Thus, the bundle flow with a 4.5 psi driving head will be greater than 28 x 103 lbs/hr. Full scale ATLAS test data taken at pressures from 14.7 psia to 800 psia indicate that the fuel assembly critical power at this flow is approximately 3.35 MWt. With the design peaking factors, this corresponds to a THERMAL POWER of more than 50% of RATED THERMAL POWER. Thus, a THERMAL POWER limit of 25% of' RA'EI THERMAL POWER for reactor pressure belo psJ is conservative. I MINIMUM The Safety Limit MCPR4s0termined using the General CRITICAL Electric Thermal Analysis Basis, GETAB (2), which is a POWER RATIO statistical model that combines all of the uncertainties in (2.1.2) operating parameters and the procedures used to calculate critical power. Instead of the standard GETAB model uncertainties, revised uncertainties in accordance with references 3 and 4 were used to calculate the SLMCPR.
The probability of the occurrence of boiling transition is determined using the General Electric Critical Quality (X) -
Boiling Length (L), GEXL, correlation.
The fuel cladding integrity Safety Limit is set such that no fuel damage is calculated to occur if the limit is not violated.
Since the parameters which result in fuel damage are not directly observable during reactor operation, the thermal and hydraulic conditions resulting in a departure from nucleate boiling have been used to mark the beginning of the region where fuel damage could occur. Although it is recognized that a departure from nucleate boiling would not result in damage to BWR fuel rods, the critical power at (Cont)
Revis 2057-mendmen o. B2-2
BASES:
2.0 SAFETY LIMITS (Cont)
REACTOR STEAM The Safety Limit for the reactor steam dome pressure has DOME PRESSURE been selected such that it is at a pressure below which it can (2.1.4) be shown that the integrity of the reactor coolant system is not K endangered. The reactor pressure limit of 1340 psig as measured in the vessel steam dome was derived from the design pressure of the reactor vessel. The peak pressures for K the piping systems connected to the reactor vessel have been recalculated based on a reactor steam dome peak pressure of 1340 psig. These peak pressures are below the lowest of
(
the transient pressures permitted by the applicable design code: ASME Boiler and Pressure Vessel (B&PV) Code (1965 Edition, including the January 1966 Addendum) for the pressure vessel, USAS Piping Code B31.1 for the steam space piping and ASME Section III for the reactor coolant
(
system recirculation piping. The ASME B&PV Code permits pressure transients up to 10% over the design pressure (110% x1250=1375 psig). The USAS Piping Code and ASME Section III permit pressure transients and other occasional loads whose combined effect do not exceed stress levels based on the duration of the loads and the applicable service limit.
REFERENCES 1) "General Electric Standard Application for Reactor Fuel,"
NEDE-2401 1-P-A (through the latest approved amendment at the time the reload analyses are performed as specified in the CORE OPERATING LIMITS REPORT).
- 2) General Electric Thermal Analysis Basis (GETAB): Data, Correlation and Design Application, General Electric Co. BWR Systems Department, January 1977, NEDE- 10958-PA and NEDO-10958-A.
- 3) "Methodology & Uncertainties for SLMCPR Evaluations,"
NEDC-32601-P-A (August 1999).
- 4) "Power Distribution Uncertainties for Safety Limit MCPR Evaluations," NEDC-32694-P-A (August 1999).
5)"E 1Compliance with Amendment 22 of GESA l, "GE 14 Compliance with Amendment 22 of GESTAR I,,"
NEDC-32868P (December 1998).
"Pilgrim Nuclear Power Station Safety Valve Setpoint
~ Increase," GE Hitachi Nuclear Energy Report, NEDC-33532P, Rev. 2 (January 2011)
- 7) NEDC-32851P-A, Rev. 4, GEXL14 Correlation far GE 14 Fuel, dated September 15, 2008
- 8) NEDC-33292P, Rev. 3, GEXL1 7 Correlation for GNF2 Fuel, dated June 2009
- 9) NEDC-33270P, Rev. 4, "GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II)", dated October 2011 R e v isio n 22-6,.2 8 9- B2 -
- 7) BASES:
3.1 REACTOR PROTECTION SYST (Cont)
Turbine Stop Valve Closure The turbine stop valve closure scram anticipates the pressure, neutron flux, and heat flux increase that could result from rapid closure of the turbine stop valves. With a scram trip setting of < 10 percent of valve closure from full open, the resultant increase in surface heat flux is limited such that MCPR remains above the safety limit MCPR even during the worst case transient that assumes the turbine bypass is closed.
Turbine Control Valve Fast Closure The turbine control valve fast closure scram anticipates the pressure, neutron flux, and heat flux increase that could result from fast closure of the turbine control valves due to load rejection exceeding the capability of the bypass valves. The reactor protection system initiates a scram when fast closure of the control valves is initiated by the acceleration relay. This setting and the fact that control valve closure time is approximately twice as long as that for the stop valves means that resulting transients, while similar, are less severe than for stop valve closure. MCPR remains above the safety limit MCPR.
Main Steam Line Isolation Valve Closure The low pressure isolation of the main steam lines at 810 psig (as specified in Table 3.2.A) was provided to protect against rapid reactor depressurization and 4
'*e f~r rcac n u -hur*-ghx-,o-raeea -e- la e-a-od-in_
,par-zt I, tgov ý t(--U-*eratýion of the reactor at pressures lower than 785 psig requires**te reactor mode switch be in the startup position where protection of the fuel cladding integrity safety limit is provided by the IRM high neutron flux scram and APRM 15% scram. Thus, the combination of main steam line low pressure isolation and isolation valve closure scram assures the availability of neutron flux scram protection over the entire range of applicability of the fuel cladding integrity safety limit. In addition, the isolation valve closure scram anticipates the pressure and flux transients that occur during normal or inadvertent isolation valve closure. With the scrams see at 10 percent of valve closure, neutron flux does not increase.
Advantage is taken of both the reactor scram that occurs when tihe main steam isolation valves close and the limited depressurization allowed by the rapid steam line isolation valve closure time, so that high power operation at tow reactor pressure does not occur, thus providing protection of the fuel cladding protection safety limit.
RaLent.on. -97
BASES:
3.2 PROTECTIVE INSTRUMENTATION (Cont) up to the complete circumferential break of a 28-inch recirculation line and with the trip setting given above, CSCS initiation, and primary system isolation are initiated in time to meet the above criteria.
The high drywell pressure instrumentation is a diverse signal to the water level instrumentation and in addition to Initiating CSCS, it causes isolation of Group 2 isolation valves. For the breaks discussed above, this instrumentation will initiate CSCS operation at about the same time as the lowv low water level instrumentation; thus the results given above are applicable here also. The low low water level instrumentation initiates protection for the full spectrum of loss-of-coolant accidents and causes isolation of Group 1 isolation valves.
Venturis are provided in the main steam lines as a means of measuring steam flow and also limiting the loss of mass inventory from the vessel during a steam line break accident. The primary function of the instrumentation Is to detect a break in the main steam line. For the worst case accident, main steam line break outside the drywell, steam flow trip setting in conjunction with the flow limiters and main steam line valve closure, limits the mass inventory loss such that fuel is not uncovered, fuel temperatures remain approximately 1000I F and release of radioactivity to the environs is well below 10CFR 100 guidelines.
Temperature monitoring instrumentation is provided in the main steam line tunnel and the turbine basement to detect leaks in these areas. Trips are provided on this instrumentation and when exceeded, cause closure of isolation valves. The setting of 1750 F for the main steam line tunnel detector is low enough to detect leaks on the order of Ž 20 gpm; thus, it is capable of covering the entire spectrum of breaks. For large breaks, the high steam flow instrumentation is a backup to the temperature instrumentation.
Pressure instrumentation is provided to close the main steam isolation valves in the RUN mode before the reactor pressure drops below 785 psig. This function is primarily intended to prevent excessive vessel depressurization in the event of a malfunction of the nuclear system pressure regulator. This function also provides automatic protection of the low-pressure core-thermal-power safety limit (25, of r _t3=; p-ý'r for ,2,t_-r .ros' T 75a_6-ig). In the Refuel or Startup Mode, the inventory loss associ ted with such a malfunction would be limited by closure of the Main Steam Isolation Valves due to ither high or low reactor water level; no fuel would be uncovered. This function is not required tsatisfy any safety design bases.