ML072610200
| ML072610200 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/17/2007 |
| From: | NRC/NRR/ADRO/DORL/LPLI-1 |
| To: | |
| kim J, NRR/ADRO/DORL, 415-4125 | |
| References | |
| TAC MC9018 | |
| Download: ML072610200 (1) | |
Text
'i i
TABLE OF CONTENTS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY 4.6 3/4.6-1 A.
Thermal and Pressurization Limitations A
3/4.6-1 B.
Coolant Chemistry B
3/4.6-3 C.
Coolant Leakage C
3/4.6-4 D.
Safety and Relief Valves D
3/4.6-6 E.
Jet Pumps E
3/4.6-7 F.
Recirculation Loops Operating F
3/4.6-8 BASES 83/4.6-1 3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A.
3/4.7-1 B.
Standby Gas Treatment System and Control B
Room High Efficiency Air Filtration System 3/4.7-11 C.
3/4.7-16 BASES 83/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8,2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES B3/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A.
Auxiliary Electrical Equipment A
3/4.9-1 B.
Operation with Inoperable Equipment B
3/4.9-4 BASES 83/4.9-1 3.10 CORE ALTERATIONS 4.10 3/4.10-1 A.
Refueling Interlocks A
3/4.10 B.
Core Monitoring B
3/4.10-1 C.
Spent Fuel Pool Water Level C
3/4.10-2 BASES B3/4.1 0-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A.
Average Planar Linear Heat Generation Rate A
(APLHGR) 3/4.11-1 B.
Linear Heat Generation Rate (LHGR)
B 3/4.11-2 C.
Minimum Critical Power Ratio (MCPR)
C 3/4.11-2 D.
Power/Flow Relationship During Power D
Operation 3/4.11-4 BASES 83/4.11-1 Amendment No.-79--- 2-1-9, 224,228 ii