MONTHYEARML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 2024-09-09
[Table view] Category:Schedule and Calendars
MONTHYEARML24018A0152024-01-29029 January 2024 – License Renewal Application Review Schedule Letter DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML15104A5092015-04-28028 April 2015 Schedule Revision for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application ML15092A0792015-04-16016 April 2015 July 14-17, 2014 - Summary of Diablo Canyon, Units 1 and 2, Audit to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) DCL-14-065, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-07-30030 July 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1101409042011-02-17017 February 2011 Revision of Schedule for the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application ML1027004902010-10-15015 October 2010 Revision of Schedule for Review of Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application DCL-10-078, Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations2010-07-16016 July 2010 Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule DCL-07-078, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations2007-08-0909 August 2007 Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations 2024-01-29
[Table view] |
Text
\.t.",R REGU/ _ UNITED STATES
.:;,V "'1)
+ <?p NUCLEAR REGULATORY COMMISSION
.../11 cr:
.L
(')
0 WASHINGTON, D.C. 20555-0001
... ~
II> ~
~ f;;
-:'1< o~ October 15, 2010
">*** .. ~
~r. John Conway Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, MC B32 San Francisco, CA 94105 SUB,JECT: REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Conway:
Enclosed is a revised schedule for the review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, license renewal application. The schedule has been updated to reflect a change in the date for the issuance of the Draft Supplemental Environmental Impact Statement (SEIS) and subsequent milestones.
The U.S. Nuclear Regulatory Commission (NRC or the staff) plans to issue the Draft SEIS by February 18, 2011. This change will also affect the date of the public meeting to receive comments on the Draft SEIS, which will now occur in March 2011, with a specific date yet to be determined. The NRC has several ongoing license renewal reviews on similar schedules, and any delay in resolving technical issues in one project affects review schedules of other projects.
In the Diablo Canyon review, the NRC staff requires additional time to complete a thorough review of severe accident mitigation alternatives and of effects to marine ecology. At this point, the staff has extended the date for issuance of the Final SEIS to October 21, 2011.
If you have any questions on the revised schedule, please contact me at 301-415-2292. For specific questions on the environmental review, please contact Drew Stuyvenberg at 301-415-4006 or bye-mail at andrew.stuyvenberg@nrc.gov.
Sincerely, OJ 9 ~--.."
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
Revised Schedule cc w/encl: Distribution via Listserv
DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone Schedule Actual Receive license renewal application (LRA) 11/24/2009 11/24/2009 Publish Federal Register Notice (FRN) - LRA availability 12/11/2009 12/11/2009 Publish FRN - acceptance/rejection and opportunity for hearing 01/21/2010 01/21/2010 Publish FRN -Intent to conduct Environmental Scoping 01/21/2010 01/27/2010 Public Meeting - license renewal overview 02/09/2010 02/09/2010 Public Meeting - environmental scoping meeting 03/03/2010 03/03/2010 Deadline for filing hearing requests and petitions for intervention 03/22/2010 03/22/2010 Audit - Scoping & Screening Methodology 03/15/2010 03/15/2010 Environmental scoping period ends 04/12/2010 04/12/2010 Audit - Aging Management Programs 04/12/2010 04/12/2010 Audit - Environmental 04/19/2010 04/19/2010 Issue environmental requests for additional information (RAls) 05/03/2010 07/06/2010 Receive responses for environmental RAls 06/03/2010 08/05/2010 Issue safety RAls 06/23/2010 05/18/2010 Receive responses for safety RAls 07/23/2010 06/03/2010 Inspection - Regional 09/13/2010 09/13/2010 Issue safety evaluation report (SER) with open items 12/10/2010 Issue draft supplemental environmental impact statement 02/18/2011 (SEIS)
Advisory Committee on Reactor Safeguards (ACRS) 02/2011 Subcommittee meeting Publish EPA FRN - draft SEIS available for comments 02/25/2011 Public Meeting - draft SEIS meeting 03/2011 End of draft SEIS comment period OS/2011 Issue final SER OS/23/2011 ACRS Full Committee meeting 07/2011 Issue final SEIS 10/21/2011 Publish EPA FRN - availability of final SEIS 10/28/2011 Commission decision (30 months if hearing is granted) OS/25/2012 ENCLOSURE
October 15, 2010 Mr. John Conway Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, MC B32 San Francisco, CA 94105
SUBJECT:
REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Conway:
Enclosed is a revised schedule for the review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, license renewal application. The schedule has been updated to reflect a change in the date for the issuance of the Draft Supplemental Environmental Impact Statement (SEIS) and subsequent milestones.
The U.S. Nuclear Regulatory Commission (NRC or the staff) plans to issue the Draft SEIS by February 18, 2011. This change will also affect the date of the public meeting to receive comments on the Draft SEIS, which will now occur in March 2011, with a specific date yet to be determined. The NRC has several ongoing license renewal reviews on similar schedules, and any delay in resolving technical issues in one project affects review schedules of other projects.
In the Diablo Canyon review, the NRC staff requires additional time to complete a thorough review of severe accident mitigation alternatives and of effects to marine ecology. At this point, the staff has extended the date for issuance of the Final SEIS to October 21, 2011.
If you have any questions on the revised schedule, please contact me at 301-415-2292. For specific questions on the environmental review, please contact Drew Stuyvenberg at 301-415-4006 or bye-mail at andrew.stuyvenberg@nrc.gov.
Sincerely, IRA!
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
Revised Schedule cc w/encl: Distribution via Listserv DISTRIBUTION: See next page ADAMS Accession No ML102700490 OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR OGC (NLO) D:DLR BC:RPB2:DLR NAME AStuyvenberg YEdmonds DWrona SUttal BHoHan DWrona DATE 9/30/10 9/28/10 10/06/10 10/10/10 10/14/10 10/15/10 1
OFFICIAL RECORD COpy
Letter to John Conway from David J. Wrona dated October 15, 2010
SUBJECT:
REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARDCOPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer DWrona AStuyvenberg KGreen AWang GMiller, RIV NO'Keefe, RIV GPick, RIV CCasto, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil,OCA EWilliamson, OGC SUttal,OGC RRihm, EDO TBrown, RIV MPeck, RIV