DCL-07-078, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations
ML072280065
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/09/2007
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-07-078, RIS-07-017
Download: ML072280065 (3)


Text

I Pacific Gas and Electric Company' James R. Becker Diablo Canyon Power Plant Vice President P.0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 August 9, 2007 Fax: 805.545.4234 PG&E Letter DCL-07-078 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Re-gulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2007-17, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.

If you have further questions, please contact Steven W. Hackleman, Operations Training Supervisor, at (805) 545-3147.

Sincerely, Jam Becke r B

any3/4347/A0703788 Enclosure cc: Michael A. Brown Steven W. Hackleman Bruce S. Mallett Alan B. Wang A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak ° Diablo Canyon
  • Palo Verde ° South Texas Project
  • Wolf Creek U 6K

Enclosure PG&E Letter DCL-07-078 NRC Form 536, "Operator Licensing Examination Data"

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBEROF REACTOR 8 10 8 10 OPERATORS NUMBER OF SENIOR REACTOR 8 6 8 6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/16/2008 08/03/2009 09/06/2010 09/26/2011 ALTERNATE DATE 06/23/2008 08/10/2009 09/13/2010 10/03/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 0 16 0 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER