DCL-10-078, Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations
ML102000584
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/16/2010
From: Peters K
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-10-078, RIS 2010-08
Download: ML102000584 (3)


Text

Pacific Gas and Electric Company Kenneth Peters Diablo Canyon Power Plant Station Director Mail Code 104/5/502 Diablo Canyon Power Plant p. O. Bo x 56 Avila Beach, CA 93424 July 16, 2010 805.545.4888 Internal : 691.4888 Fax: 805.545.4234 PG&E Letter DCL-10-07S Internet: kjpa@pge.com u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-SO Docket No. 50-323, OL-DPR-S2 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 201 O-OS, Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 201 O-OS, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.

If you have further questions, please contact John M. Becerra, Operations Training Leader, at (S05) 545-4006.

Enclosure cc/enc: John M. Becerra Elmo C. Collins, US NRC Region IV Michael S. Peck, US NRC SRI DCPP Alan B. Wang, US NRC NRR A member of the STARS (Str ategic Teaming and Re so urc e Sharing) Alliance Callaway

  • Com anche Peak
  • Di ab lo Canyon
  • Pa l o Verde
  • San Onofre
  • Wolf Creek

Enclosure PG&E Letter DCL-1 0-078 NRC Form 536, "Operator Licensing Examination Data"

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-0001, or btc internet e-mail to in ocollects@nrc'80v, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2011 CY 2012 CY 2013 CY 2014 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2011 CY2012 Cy2013 Cy2014 NUMBER OF REACTOR 10 10 8 0 OPERATORS NUMBER OF SENIOR REACTOR 11 8 10 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3 0 0 OPERATORS-UPGRADE 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0

PROPOSED DATES PRIMARY DATE 07/1112011 09124/2012 08/1212013 ALTERNATE DATE 07/18/2011 10/0112012 08/1912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2011 CY 2012 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 18 18 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER