Supplemental Information Needed for Acceptance of Application to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)
ML13266A064
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/24/2013
From: Jennivine Rankin
Plant Licensing Branch IV
To: Halpin E
Pacific Gas & Electric Co
Rankin J
References
TAC MF2333, TAC MF2334
Download: ML13266A064 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 September 24, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (TAC NOS. MF2333 AND MF2334)

Dear Mr. Halpin:

By letter dated June 26,2013Property "Letter" (as page type) with input value "DCL-13-065, LAR-13-03 - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. (Agencywide Documents Access and Management System (ADAMS) Accession No. ML131960159), Pacific Gas and Electric Company (PG&E, the licensee), submitted a license amendment request (LAR) for Diablo Canyon Power Plant, Units 1 and 2 (DCPP). The proposed amendment would enable PG&E to adopt a new fire protection licensing basis for DCPP, which complies with the requirements in paragraphs 50.48(a) and (c) of Title 10 of the Code of Federal Regulations (10 CFR). Specifically, DCPP would transition the fire protection program to one based on the National Fire Protection Association Standard 805 (NFPA 805) Performance-Based Standard for Fire Protection For Light Water Reactor Generating Plants (2001 Edition) (ADAMS Accession No. ML010800360). PG&E further requested changes to paragraph C.2.(5) of Facility Operating License No. DPR-80 and paragraph C.2.(4) of Facility Operating License No. DPR-82 that describes how the licensee may make changes to its approved fire protection program without prior approval by the U.S. Nuclear Regulatory Commission (NRC).

The purpose of this letter is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent

E. Halpin

- 2 assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.

In order to make the application complete, the NRC staff requests that PG&E supplement the application to address the information requested in the enclosure by October 9, 2013, to enable the NRC staff to complete its acceptance review. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its review activities associated with the application.

The information requested and associated timeframe in this letter were discussed with Mr. Philippe Soenen of your staff on September 20, 2013.

If you have any questions, please contact me at 301-415-1530 or via e-mail at Jennivine. Rankin@nrc.gov.

Sincerely, Jennivine K. Rankin, Project Manager Plant licensing Branch IV Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

As stated cc w/encl: Distribution via listserv

LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 By letter dated June 26.2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML131960159). Pacific Gas and Electric Company (PG&E. the licensee). submitted a license amendment request (LAR) for Diablo Canyon Power Plant. Units 1 and 2 (DCPP). The proposed amendment would enable PG&E to adopt a new fire protection licensing basis for DCPP. which complies with the requirements in paragraphs 50.48(a) and (c) of Title 10 of the Code of Federal Regulations (10 CFR). Specifically. DCPP would transition the fire protection program to one based on the National Fire Protection Association Standard 805 (NFPA 805) Performance-Based Standard for Fire Protection For Light Water Reactor Generating Plants (2001 Edition) (ADAMS Accession No. ML010800360). PG&E further requested changes to paragraph C.2.(5) of Facility Operating License No. DPR-80 and paragraph C.2.(4) of Facility Operating License No. DPR-82 that describes how the licensee may make changes to its approved fire protection program without prior approval by the U.S. Nuclear Regulatory Commission (NRC).

The NRC staff performed the LAR acceptance review in accordance with Revision 1 of the Office of Nuclear Reactor Regulation (NRR) Office Instruction L1C-109. "Acceptance Review Procedures" (ADAMS Accession No. ML091810088). The NRC staff, has determined that the following information is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.

1.

Tables W-2 and W-3 of the submittal dated June 26. 2013. present the significant-risk accident sequences for DCPP. Units 1 and 2. respectively.

associated with fire scenarios that individually contribute greater than 0.5 percent of the calculated fire core damage frequency (CDF). There are no similar tables provided for large early release frequency (LERF). Please provide listings of all of the fire initiating events that contribute individually greater than 0.5 percent of the calculated LERF for both Units 1 and 2 (similar to Tables W-2 and W-3 for CDF).

2.

Table S-2 of the submittal dated June 26. 2013. identifies Modification S-2.3.

"Reactor Coolant Pump (RCP) Seal Cooling Modification." which includes installation of Westinghouse SHIELD low leakage RCP seals. The NRC staff understands that PG&E fully intends to install this modification or other compensatory measures in order to achieve the desired plant safety. as documented in the LAR. However. given the recent concerns about the performance of the new Westinghouse RCP seals, the risk reduction credit taken in this application for this modification may be optimistic. Not crediting the RCP Enclosure

- 2 seal cooling modification will likely increase the total CDF and LERF for both units. Please discuss the impact of not crediting the new Westinghouse SHIELD RCP seals on CDF, LERF. delta (Ll.) CDF, and Ll.LERF.

E. Halpin

- 2 assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.

In order to make the application complete, the NRC staff requests that PG&E supplement the application to address the information requested in the enclosure by October 9, 2013, to enable the NRC staff to complete its acceptance review. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its review activities associated with the application.

The information requested and associated timeframe in this letter were discussed with Mr. Philippe Soenen of your staff on September 20, 2013.

If you have any questions, please contact me at 301-415-1530 or via e-mail at Jennivine.Rankin@nrc.gov.

Sincerely, IRA!

Jennivine K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn4MailCenter Resource LPLIV Reading JHyslop, NRRlDRAlAPLA RidsAcrsAcnw_MailCTR Resource HHamzehee, NRRlDRNAPLA RidsNrrDorlLpl4 Resource AKlein, NRRlDRAlAFPB RidsNrrDraAfpb Resource HBarrett, NRRlDRNAFPB RidsNrrDraApla Resource JRobinson, NRRlDRAlAFPB RidsNrrLAJBurkhardt Resource LFields, NRR/DRAlAHPB RidsNrrPMDiabloCanyon Resource

  • b email RRlDORLlLPL4/PM NRRI JBurkhardl 9/23/13 9/20/13 9/24/13 DORLlLPL4IBC NRRlDORLlLPL4/PM HHamzehee MMa OFFICIAL RECORD COpy