ML14094A173

From kanterella
Jump to navigation Jump to search

Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-02
ML14094A173
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/09/2014
From: Kimberly Green
License Renewal Projects Branch 1
To:
Entergy Nuclear Operations
Green K, 415-1627
References
TAC MD5407, TAC MD5408
Download: ML14094A173 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 9, 2014 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2014-02 (TAG NOS. MD5407 AND MD5408)

Dear Sir or Madam:

By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff) The staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, which was issued August 2009 and supplemented August 30, 2011 (SER Supplement 1).

By letter dated September 27, 2013, Entergy responded to a request for additional information (RAI). The staff has reviewed the response and has identified the need for additional information, which is enclosed.

This RAI was discussed with Mr. Roger Waters, and a mutually agreeable date for Entergy's response is within 60 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or by e-mail at Kimberly.Green@nrc.gov.

Sincerely, Kimberly Green, Sr. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc: Listserv

..* ML14094A173 *concurred via email OFFICE LA:DLRIRPB1* APM: DLRIRASB BC:DLRIRPB1 APM: DLRIRASB NAME YEdmonds KGreen YDiaz-Sanabria KGreen DATE 41712014 41912014 4/912014 41912014

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2014-02 (TAC NOS. MD5407 AND MD5408)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDirRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource RidsNrrPMindianPoint Resource YDiaz-Sanabria MGray, Rl KGreen ABurritt, Rl JUnbe DonaldJackson, Rl JPoehler GMeyer, Rl A Hiser MModes, Rl STurk, OGC NSheehan, Rl OPA BMizuno, OGC DScrenci, Rl OPA DRoth, OGC DTifft, Rl BHarris, OGC NMcNamara, Rl SBurnell, OPA GNewman, Rl DMclntyre, OPA JSStewart, Rl EDacus, OPA AmiPatel, Rl

REQUEST FOR ADDITIONAL INFORMATION SET 2014-02 RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION DOCKET NOS. 50-247 AND 50-286 REGARDING REACTOR VESSEL INTERNALS PROGRAM RAI11-C Applicant/Licensee Action Item 7 from the staff's final safety evaluation (SE) of MRP-227 requires the applicants/licensees of Babcock & Wilcox (B&W), Combustion Engineering (CE),

and Westinghouse reactors to develop plant-specific analyses to be applied for their facilities to demonstrate that B&W In-Core Monitoring Instrumentation (IMI) guide tube assembly spiders and control rod guide tube (CRGT) assembly spacer castings, CE lower support columns, and Westinghouse lower support column bodies will maintain their functionality during the period of extended operation, and states that these analyses should also consider the possible loss of fracture toughness in these components due to thermal embrittlement (TE) and irradiation embrittlement (IE). For Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3), the equivalent component to the lower support column bodies are the lower internals assembly -

column caps (column caps).

By letter dated January 28, 2014, Entergy provided plant-specific information on the ferrite content and susceptibility toTE for the Indian Point Nuclear Generating Unit Nos. 2 and 3 lower internals assembly- column caps. Based on its evaluation of the plant-specific material information for the column caps, Entergy concluded that the IP2 and IP3 column caps are not susceptible toTE.

Entergy's conclusion related toTE notwithstanding, the column caps remain susceptible to IE.

The staff is concerned that the linked Primary component for the column caps, the CRGT assembly lower flange welds, is not a good predictor of IE for the column caps since the CRGT lower flange welds receive substantially lower neutron fluence than the column caps (based on the estimated neutron fluence tabulated in MRP-191 for the two components). Irradiation assisted stress corrosion cracking (IASCC) is the only mechanism of cracking that screened in for the column caps. The CRGT lower flange welds are also not a good predictor for IASCC of the column caps, because the lower flange welds are susceptible to stress corrosion cracking (SCC) and fatigue cracking, but not IASCC.

The staff, therefore, requests that Entergy modify its Reactor Vessel Internals Inspection Plan (RVI Inspection Plan) to provide a link to a Primary component or components that is an appropriate predictor of IE and IASCC of the column caps.

RAI16-B In its September 27, 2013 response to RAI 16-A, Entergy proposed Commitment No. 50 stating that it would provide the NRC staff a detailed inspection plan for the IP2 split pins, including inspection methods, inspection coverage, and inspection frequency, by March 31,2015, if the planned replacement of the 1P2 split pins will not be accomplished in 2016. In order to resolve MRP-227-A ApplicanVLicensee Action Item 3, the NRC staff requests Entergy submit the schedule for initial inspection, inspection methods, inspection coverage, and inspection frequency for the IP2 split pins in the event the IP2 split pins are not replaced by 2016, and that Commitment No. 50 be modified accordingly.

ENCLOSURE

RA117-A In its September 27, 2013 response to RAI 17, Entergy provided a technical justification for the adequacy of the existing inspection requirements specified in MRP-227 -A for the clevis insert bolts, which relies on its American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section Xllnservice Inspection {lSI) Program. Entergy's response included the statement, "[t]he video camera visual inspections at a ten-year interval by qualified personnel that are specified in the ASME Code Section XI and MRP-227 -A are capable of identifying wear or dislodged components of the clevis insert cap screws or dowel pins at any location, if they exist." To assure that the type of degradation documented in Westinghouse lnfoGram IG-10-1 would be reliably detected at IP2 and IP3, the staff requests the following additional information:

1. Provide the ASME Code Section XI, Table IWB-2500 Examination Category and Item Number under which the IP2 and IP3 clevis insert bolts are classified.
2. Verify that the ASME Code,Section XI examination of the clevis inserts directly views all the clevis insert bolt heads, dowel pins and locking devices for each clevis insert.
3. If the ASME Code,Section XI examination does not directly view all the clevis insert bolts heads, locking devices, and dowel pins, propose a modification to Entergy's ASME Code,Section XI lSI Program to do so.
4. State when the most recent ASME Code,Section XI inspection of the clevis insert bolts was conducted at 1P2 and IP3. Summarize the findings of that inspection for the clevis insert bolts.