ML072780439

From kanterella
Jump to navigation Jump to search

Summary of Telephone Conference Call with Entergy Nuclear Operations, Inc., Requests for Additional Information
ML072780439
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/16/2007
From: Kimberly Green
NRC/NRR/ADRO/DLR/RLRB
To:
Entergy Nuclear Operations
Green, Kimberly NRR/DLR/RLRB 415-1627
References
TAC MD5407, TAC MD5408
Download: ML072780439 (10)


Text

October 16, 2007 LICENSEE:

Entergy Nuclear Operations, Inc.

FACILITY:

Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 2, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on October 2, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs.

provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Kimberly Green, Safety Project Manager License Renewal Branch RLRB Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosures:

1. List of Participants
2. List of Draft Requests for Additional Information cc w/encls: See next page

ML072780439 OFFICE LA:DLR PM:RLRB:DLR BC:RLRB:DLR NAME SFigueroa KGreen RAuluck DATE 10/11/07 10/15/07 10/16/07

TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS OCTOBER 2, 2007 PARTICIPANTS AFFILIATIONS Kim Green NRC Barry Elliot NRC Lambros Lois NRC Mike Stroud Entergy Alan Cox Entergy Don Fronabarger Entergy John Curry Entergy Charlie Caputo Entergy Donna Tyner Entergy Nelson Azevedo Entergy Walt Wittich Entergy Charlie Jackson Entergy Floyd Gumble Entergy Bill Spataro Entergy

DRAFT REQUESTS FOR ADDITIONAL INFORMATION INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION OCTOBER 2, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on October 2, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3 license renewal application (LRA).

D-RAI B.1.1.32-1 The Reactor Vessel Surveillance Program is identified as consistent with the program described in NUREG-1801, "Generic Aging Lessons Learned (GALL) Report,"Section XI.M31, "Reactor Vessel Surveillance" with enhancements. The enhancements are: (1) to withdraw and test a standby capsule to cover the peak reactor vessel fluence that is expected through the end of the period of extended operation and (2) to revise procedures to require that tested and untested specimens from all capsules pulled from the reactor vessel be maintained in storage. Identify the lead factors for each standby capsule, the materials available to be tested in each capsule, and the date for capsule withdrawal to ensure that the fluence of the surveillance capsule will be equal or greater than the peak reactor vessel fluence through the end of the period of extended operation.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 4.2.1-1 The Charpy Upper-Shelf Energy (USE) and Pressurized Thermal Shock (PTS) analyses utilize the neutron fluence at 48 effective full power years (EFPY) to represent the neutron fluence for the reactor vessels at the end of the period of extended operation.

A) What were the EFPY achieved for each unit prior to the last refueling outage? What capacity factors and neutron flux were assumed for each unit from the last refueling outage to the end of the period of extended operation to result in 48 EFPY at the end of the period of extended operation? Explain why these capacity factors and neutron flux values are applicable for determining the neutron fluence for the reactor vessels at the end of the period of extended operation.

B) How will future capacity factors, neutron flux and neutron fluence values be monitored to ensure 48 EFPY values bound the actual conditions of the reactor vessels at the end of the period of extended operation?

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

2 D-RAI 4.2.2-1 Table 4.2-2 in the License Renewal Application (LRA) indicates that the percentage drop in Charpy USE for plate B2803-3 is 21.3 percent at 48 EFPY. The percentage drop in Charpy USE for plate B2803-3 was determined using its surveillance data, in accordance with Position 2.2 of Regulatory Guide (RG) 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials." Provide the analysis that was used to determine the percentage drop in Charpy USE for plate B2803-3, include all surveillance data (unirradiated and irradiated Charpy USE and surveillance capsule neutron fluence) and references for the surveillance data.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 4.2.2-2 According to Table 4.2-1 in the LRA, plates B2002-3 and B2003-1 in Indian Point Unit 2 (IP2) are projected to have a Charpy USE of 47.4 ft-lb and 49.8 ft-lb at 48 EFPY, respectively. This table also indicates that the material type was A302-B. Since the Charpy USE values are below 50 ft-lb, Section 4.2.2 indicates that the USE is acceptable in accordance with the Westinghouse 4-loop plant analysis described in WCAP-13587, Revision 1, "Reactor Vessel Upper Shelf Energy Bounding Evaluation For Westinghouse Pressurized Water Reactors."

WCAP-13587, Revision 1 was reviewed by the staff in a safety assessment in a letter dated April 21, 1994 to W. H. Rasin (Nuclear Management and Resources Council, NUMARC). This safety assessment indicates that licensees must confirm that the bounding plate used in the report has a lower J-R curve than any beltline material in the vessel. This safety assessment indicates that the A302-B material J-R curve methodology used in WCAP-13587, Revision 1 was unacceptable. However, the A302-B J-R curve methodology in a letter from D. B. Waters (Carolina Power and Light Company) dated December 21, 1993, includes appropriate adjustments for USE and temperature corrections and is acceptable to the staff.

A)

Provide the J-R curve for the limiting IP2 plate, using corrections for material type used in the IP-2 reactor vessel, at 48 EFPY. Compare this curve to the J-R applied values in WCAP-13587, Revision 1 to demonstrate the analysis in the WCAP is bounding for the IP2 reactor vessel.

B)

Table 3-1 in WCAP-13587, Revision 1 indicates the Westinghouse 4-loop plant J-R applied values are applicable for reactor vessels with a thickness of 8.5 inches and an inner radius of 86.5 inches and subject to Level A, B, C, and D conditions specified in Section 3.0 of the WCAP. Compare the wall thickness and inner radius of the IP2 reactor vessel at its beltline to the values used in the Westinghouse 4-loop plant analysis. Compare the Level A, B, C, and D conditions specified in Section 3.0 of the WCAP to the Level A, B, C and D conditions for IP2. Explain why the Westinghouse 4-loop plant analysis in WCAP-13587, Revision 1 is applicable to IP2.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

3 D-RAI 4.2.5-1 A)

Table 4.2-3 in the LRA indicates that the RTNDT value caused by irradiation for the intermediate shell axial welds and the lower shell axial welds in IP2 were determined using surveillance data reported in WCAP-15629, Revision 1, "Indian Point Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and PTLR Support Documentation." This WCAP has surveillance data from IP2, Indian Point Unit 3 (IP3),

and H.B. Robinson, Unit 2. The IP2 fluences were calculated using approved methodologies (WCAP-15557-R0, "Qualification of the Westinghouse Pressure Vessel Neutron Fluence Evaluation Methodology," and WCAP-14040-NP-A, Revision 2, "Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves") that are based on RG 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," March 2001, (This RG requires the use of ENDF/BVI for determining neutron cross-sections which are included in the BUGLE-96 cross-section file.) In addition, there is excellent agreement between calculated and corresponding measured values. The IP3 capsule analyses also used approved methods and cross sections, thus, they are acceptable.

The H.B. Robinson calculations are reported in WCAP-14044, "Westinghouse Surveillance Capsule Neutron Fluence Re-evaluation," that was issued in 1994 (before the issuance of RG 1.190 and the availability of BUGLE-96 and ENDF/BVI). WCAP-15629, Revision 1 indicates that 15% was added to the values reported in WCAP-14044.

Explain why 15% was added to the values reported in WCAP-14044. Provide neutron fluence values derived using a methodology that adheres to the guidance in RG 1.190.

If the revised analysis results in a change in neutron fluence for the H.B. Robinson, Unit 2 surveillance capsules, provide the RTNDT value caused by irradiation and the RTPTS value for the intermediate shell axial welds and the lower shell axial welds in IP2 and provide the surveillance data analysis required by 10 CFR 50.61(c)(2)(i).

B)

Table 4.2-4 in the LRA indicates that the RTNDT caused by irradiation for the lower shell plate B2803-3 in IP3 was determined using surveillance data reported by the licensee's response to Generic Letter (GL) 92-01, "Reactor Vessel Structural Integrity." This surveillance data was reported in Attachment I to a September 4, 1998, letter from J. Knubel (New York Power Authority). As discussed in RAI 4.2.5-1A, the surveillance data from IP3 is also reported in WCAP-15629, Revision 1. The neutron fluence values for the IP3 surveillance capsule that are reported in WCAP-15629, Revision 1 and in the September 4, 1998, letter have different values. The applicant is requested to revise the PTS analyses using neutron fluence values for the surveillance capsules that are determined using the guidance in RG 1.190 and to provide the surveillance data analysis required by 10 CFR 50.61(c)(2)(I).

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 4.2.5-2 10 CFR 50.61(b)(4) indicates that each pressurized water nuclear power reactor for which the analysis required by PTS rule indicates that if there is no reasonably practicable flux reduction program to prevent the RTPTS value from exceeding the PTS screening criteria based on the neutron fluence at the expiration date of the operating license, the licensee shall submit a safety analysis to determine what, if any, modifications to equipment, systems, and operation are

4 necessary to prevent potential failure of the reactor vessel as a result of postulated PTS events if continued operation beyond the screening criteria is allowed. The analysis must be submitted at least three years before the RTPTS value is projected to exceed the PTS screening criteria.

Section 4.2.5 in the LRA indicates that the RTPTS value for plate B2803-3 in IP3 will exceed the PTS screening criterion. Identify the flux reduction program initiated by the applicant to prevent the RTPTS value for plate B2803-3 in IP3 from exceeding the PTS screening criterion. Based on the information provided in response to RAI 4.2.5-1(B) and RAI 4.2.1-1, identify when the RTPTS value for plate B2803-3 in IP3 is projected to exceed the PTS screening criterion.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Letter to Entergy Nuclear Operations, Inc From K. Green Dated October 16, 2007 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 2, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING, UNITS 2 AND 3, LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter BPham JLeous KGreen JAyala RFranovich RAuluck MKowal JBoska ECobey, RI RConte, RI MCox, RI DJackson, RI BWittick, RI NSheehan, RI OPA DScrenci, RI OPA SBurnell, OPA DMcIntyre, OPA RShane, OCA UShoop, OEDO

Indian Point Nuclear Generating, Units 2 and 3 cc:

Mr. Michael R. Kansler President & CEO / CNO Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Anthony Vitale - Acting General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Patric W. Conroy Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. T.R. Jones - Acting Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanana, NY 10511-0249 Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

Indian Point Nuclear Generating, 2

Units 2 and 3 cc:

Mr. Michael Balboni Deputy Secretary for Public Safety State Capitol, Room 229 Albany, NY 12224 Mr. John P. Spath New York State Energy, Research and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspectors Office Indian Point 3 U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 48 Bear Hill Road Newton, NH 03858 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.

828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524 Mr. R. M. Waters Technical Specialist Licensing 450 Broadway P.O. Box 0249 Buchanan, NY 10511-0249