Other: ML071900365, ML11090A078, ML11109A067, ML12199A025, ML13043A527, ML13067A315, ML13077A284, ML13134A367, ML13155A504, ML13270A248, ML14217A206, ML15007A430, ML15055A004, ML15055A014, ML15268A128, NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application, NL-10-054, Correction to License Renewal Application, NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A, NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A
|
MONTHYEARNL-07-056, Supplement to License Renewal Application2007-05-0303 May 2007 Supplement to License Renewal Application Project stage: Supplement ML0729601252007-06-21021 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 21 2007 Project stage: Request NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application2007-06-21021 June 2007 Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application Project stage: Other ML0719003652007-07-25025 July 2007 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from ENO, Inc. for Renewal of the Operating License for the Indian Point Nuclear Generating Unit Project stage: Other ML0727804392007-10-16016 October 2007 Summary of Telephone Conference Call with Entergy Nuclear Operations, Inc., Requests for Additional Information Project stage: RAI NL-10-054, Correction to License Renewal Application2010-05-27027 May 2010 Correction to License Renewal Application Project stage: Other ML11090A0782011-04-19019 April 2011 Safety Project Manager Change for the License Renewal Project for Indian Point Nuclear Generating Unit Numbers 2 and 3 Project stage: Other ML11109A0672011-04-19019 April 2011 Lr Hearing - FW: OAR - Safety PM Change for the License Renewal Project for Indian Point...(Tac Nos. MD5407 & MD5408) Project stage: Other CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12048B4082012-02-17017 February 2012 State of New Yorks Answer to Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention NYS-37 (Entergy Alternatives) Project stage: Request NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A2012-02-17017 February 2012 License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A Project stage: Other CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12184A0372012-06-14014 June 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML12199A0252012-07-30030 July 2012 Project Manager Change for the License Renewal of Indian Point, Units 2 & 3 Project stage: Other ML12223A3882012-09-10010 September 2012 RAI for the Review of the Indian Pont Nuclear Generating Unit Nos. 2 and 3, LRA Set 2012-02 Project stage: RAI ML12223A3672012-09-12012 September 2012 Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning RAI Set 2012-02, Reactor Vessel Internals Program Pertaining to the Indian Point, Units 2 & 3, License Renewal Application Project stage: RAI ML12270A3842012-09-26026 September 2012 Lr Hearing - Meeting Summary Project stage: Request ML12278A0772012-10-16016 October 2012 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application, Set 2012-03 Project stage: RAI NL-12-140, Reply to Request for Additional Information Regarding the License Renewal Application2012-10-17017 October 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI NL-12-166, Reply to Request for Additional Information Regarding the License Renewal Application2012-11-20020 November 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications Project stage: Response to RAI ML13015A1752013-02-0606 February 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, LRA, Set 2013-01 Project stage: RAI ML15335A2722013-02-0606 February 2013 Official Exhibit - NRC000187-00-BD01 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and Project stage: RAI ML15334A2562013-02-0606 February 2013 Official Exhibit - ENT000660-00-BD01 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2013-01 (TAC Nos. MD5407 and Project stage: Request ML15223A2632013-02-0606 February 2013 NRC000187 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) Feb. 6, Project stage: RAI ML15222A8962013-02-0606 February 2013 ENT000660 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD54 Project stage: Request ML13043A5272013-02-26026 February 2013 PM Change Letter - February 2013 Project stage: Other ML13077A2842013-03-0808 March 2013 Correction PM Letter Indian Point Project stage: Other ML13067A3152013-03-0808 March 2013 Correction to Project Manager Change for the License Renewal of Indian Point, Units 2 and 3 (TAC Nos. MD5407 & MD5408) Project stage: Other ML13127A3762013-05-0707 May 2013 Errata to NRC Staff'S Proposed and Reply Findings of Fact and Conclusions of Law on Contention NYS-5 (Buried Piping and Tanks) Project stage: Request NL-13-052, Reply to Request for Additional Information Regarding the License Renewal Application2013-05-0707 May 2013 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML13155A5042013-06-11011 June 2013 IP2-32-390 Request to Withhold-NL-12-166 Project stage: Other ML13162A6062013-06-12012 June 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-02 Project stage: RAI ML13186A1692013-07-17017 July 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013 03 Project stage: RAI ML13134A3672013-07-19019 July 2013 PM Change Letter Project stage: Other ML13205A0222013-07-24024 July 2013 Lr Hearing - Telecon Summary for 7-19-13 Call on Drais for Rvi Program and Inspection Plan Project stage: Request ML15222A8982013-07-26026 July 2013 ENT000661 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5 Project stage: Request ML15334A2572013-07-26026 July 2013 Official Exhibit - ENT000661-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 Lr Application, Set 2013-04 (TAC Nos Project stage: Request ML13204A1992013-07-26026 July 2013 RAI for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-04 Project stage: RAI ML13240A0762013-09-0303 September 2013 RAI Set 2013-5 follow-up RAI on CP Project stage: RAI ML13270A2482013-09-27027 September 2013 Lr Hearing - IPEC License Renewal - Response to Set 2013-04 RAIs Project stage: Other ML13318A4502013-11-19019 November 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating, Units 2 and 3, License Renewal Application, Set 2013-06 Project stage: RAI NL-14-010, Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application2014-01-16016 January 2014 Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan Project stage: Request NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A2014-01-28028 January 2014 Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A Project stage: Other ML15160A2002014-01-28028 January 2014 NYS000503 - Dacimo, Fred, Entergy, Letter to Document Control Desk, USNRC, Reply to Request for Additional Information Regarding the License Renewal Application, NL-14-013 (January 28, 2014) (ML14038A150) Project stage: Response to RAI ML14084A3872014-04-0101 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-01 Project stage: RAI ML15334A2582014-04-0909 April 2014 Official Exhibit - ENT000662-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2014-02 (TAC Nos. MD5407 and Project stage: Request ML15222A9012014-04-0909 April 2014 ENT000662 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5 Project stage: Request ML14094A1732014-04-0909 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-02 Project stage: RAI 2012-09-26
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 April1, 2014
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2014-01 (TAG NOS MD5407 AND MD5408)
Dear Sir or Madam:
By letter dated April23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff) The staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, which was issued August 2009 and supplemented August 30, 2011 (SER Supplement 1 ).
Since the issuance of SER Supplement 1, the staff has identified additional operating experience (OE) at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, managing aging effects offire water system components, and loss of coating integrity of internal coatings. To address this OE, the staff has issued interim staff guidance (ISG) documents, either as final or draft. As such, the staff is requesting additional information regarding how Entergy plans to manage the effects of aging as described in the ISG documents.
This RAI was discussed with Mr. Roger Waters, and a mutually agreeable date for Entergy's response is September 30, 2014.
If you have any questions, please contact me at 301-415-1627, or by e-mail at Kimberly.Green@nrc.gov.
Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc: Listserv Sincerely, r
0 r f: 1
()r r
___/ /~ ___/~' L!
r--
-joY
)
)
Kimberly Green, Senior. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation
Kimberly Green, Senior Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation
- concurred via email OFFICE LA:DLR/RPB1*
APM: DLR/RASB BC:DLR/RPB1 APM: DLR/RASB NAME YEdmonds KGreen (JUribe for)
YDiaz-Sanabria KGreen (JUribe for)
DATE 3/28/2014 4/1/2014 3/31/2014 4/1/2014
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2014-01 (TAG NOS. MD5407 AND MD5408)
DISTRIBUTION:
HARDCOPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRerb Resource RidsNrrDirRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource RidsNrrPMindianPoint Resource YDiaz KGreen JUri be WHolston STurk, OGC BMizuno, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMclntyre, OPA EDacus, OCA MGray, Rl ABurritt, Rl DonaldJackson, Rl GMeyer, Rl MModes, Rl NSheehan, Rl OPA DScrenci, Rl OPA DTifft, Rl NMcNamara, Rl GNewman, Rl JSStewart, Rl AmiPatel, Rl
REQUESTS FOR ADDITIONAL INFORMATION, SET 2014-01 RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION DOCKET NOS. 50-247 AND 50-286 REGARDING LR-ISG-2012-02 AND DRAFT LR-ISG-2013-01 RAI 3.0.3-1
Background:
Recent industry operating experience (OE) and questions raised during the staff's review of several license renewal applications (LRAs) have resulted in the staff concluding that several aging management programs (AMPs) and aging management review (AMR) items in the LRA may not or do not account for OE involving recurring internal corrosion, corrosion occurring under insulation, managing aging effects of fire water system components, and certain other issues. In order to provide updated guidance, the NRC staff has issued LR-JSG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation" (ADAMS Accession No. ML13227A361).
Issue:
The staff noted that the updated guidance may not have been incorporated into the respective AMPs and AMR items.
Request:
Provide details on how the updated guidance of LR-ISG-2012-02 has been accounted for in your AMPs and AMR items; or where the revised recommendations will not be incorporated, state an exception and the basis for the exception. If necessary, provide revisions to LRA Section 3 tables, Appendix A, and Appendix B.
RAI3.0.3-2
Background:
The staff has noted several recent industry OE events related to loss of coating integrity of internal coatings. This has resulted in the staff concluding that several AMPs and AMR items in the LRA may not or do not account for this OE. The staff recently issued draft LR-ISG-2013-01, "Aging Management of Loss of Coating Integrity for Internal Service Levell II (Augmented)
Coatings" (ADAMS Accession No. ML13262A442).
Issue:
Loss of coating integrity for Service Levell II {augmented) coatings Industry OE indicates that degraded coatings have resulted in unanticipated or accelerated corrosion of the base metal and degraded performance of downstream equipment (e.g.,
reduction in flow, drop in pressure, reduction in heat transfer) due to flow blockage. Based on these industry OE examples, the staff has questions related to how the aging effect, loss of coating integrity due to blistering, cracking, flaking, peeling, or physical damage (e.g., cavitation ENCLOSURE damage downstream of a control valve) would be managed for Service Levell II {augmented) coatings.
For purposes of this RAI, Service Levell II (augmented) coatings include:
- 1. Those installed on the interior of in-scope piping, heat exchanges, and tanks which support functions identified under 10 CFR 54.4(a)(1) and (a)(2), and
- 2. Coatings installed on the interior of in-scope piping, heat exchangers, and tanks whose failure could prevent satisfactory accomplishment of any of the functions identified under 10 CFR 54.4(a)(3).
The term "coating" includes inorganic (e.g., zinc-based) or organic (e.g., elastomeric or polymeric) coatings, llnings (e.g., rubber, cementitious), and concrete surfacers (e.g.,
concrete-lined fire water system piping). The terms "paint" and "linings" should be considered as coatings.
The staff believes that to effectively manage loss of coating integrity due to blistering, cracking, flaking, peeling, or physical damage of Service Levell II (augmented) coatings an AMP should include:
- 1. Baseline visual inspections of coatings installed on the interior surfaces of in-scope components should be conducted as soon as practical.
- 2. Subsequent periodic inspections where the interval is based on the baseline inspection results should be performed. For example:
- a. If no peeling, delamination, blisters, or rusting are observed, and any cracking and flaking has been found acceptable, subsequent inspections could be conducted after multiple refueling outage intervals (e.g., six years or more if the same coatings are in redundant trains).
- b. If the inspection results do not meet the above; but, a coating specialist has determined that no remediation is required, subsequent inspections could be conducted every other refueling outage interval.
- c.
If coating degradation was observed that required repair or replacement, or for newly installed coatings, subsequent inspections should occur at least once during the next two refueling outage intervals to establish a performance trend on the coatings.
- 3. All accessible internal surfaces for tanks and heat exchangers should be inspected. A representative sample of internally coated piping components not less than 73 1-foot axial length circumferential segments of piping or 50 percent of the total length of each coating material and environment combination should be inspected.
- 4. Coatings specialists and inspectors should be qualified in accordance with an American Society for Testing and Materials International standard endorsed in Regulatory Guide 1.54, "Service Levell, II, and Ill Protective Coatings Applied to Nuclear Power Plants,"
including staff guidance associated with a particular standard.
- 5. Monitoring and trending should include pre-inspection reviews of previous inspection results.
- 6. The acceptance criteria should include that indications of peeling and delamination are not acceptable. Blistering can be evaluated by a coating specialist; however, physical testing should be conducted to ensure that the blister is completely surrounded by sound coating bonded to the surface.
Request:
If coatings have been installed on the internal surfaces of in-scope piping, piping components, heat exchangers, or tanks, state how loss of coating integrity due to blistering, cracking, flaking, peeling, or physical damage will be managed. Describe the following:
- 1. the inspection method
- 2. the parameters to be inspected
- 3. when baseline inspections will commence and finish, and the frequency of subsequent inspections
- 4. the extent of inspections and the basis for the extent of inspections
- 5. the training and qualification of individuals involved in coating inspections
- 6. how trending of coating degradation will be conducted
- 7. acceptance criteria
- 8. corrective actions for coatings that do not meet acceptance criteria, and
- 9. the program(s) that will be augmented to include the above activities If necessary, provide revisions to LRA Section 3 tables, Appendix A, and Appendix B.