Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: ML071900365, ML11090A078, ML11109A067, ML12199A025, ML13043A527, ML13067A315, ML13077A284, ML13134A367, ML13155A504, ML13270A248, ML14217A206, ML15007A430, ML15055A004, ML15055A014, ML15268A128, NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application, NL-10-054, Correction to License Renewal Application, NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A, NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A
|
MONTHYEARNL-07-056, Supplement to License Renewal Application2007-05-0303 May 2007 Supplement to License Renewal Application Project stage: Supplement ML0729601252007-06-21021 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 21 2007 Project stage: Request NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application2007-06-21021 June 2007 Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application Project stage: Other ML0719003652007-07-25025 July 2007 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from ENO, Inc. for Renewal of the Operating License for the Indian Point Nuclear Generating Unit Project stage: Other ML0727804392007-10-16016 October 2007 Summary of Telephone Conference Call with Entergy Nuclear Operations, Inc., Requests for Additional Information Project stage: RAI NL-10-054, Correction to License Renewal Application2010-05-27027 May 2010 Correction to License Renewal Application Project stage: Other ML11090A0782011-04-19019 April 2011 Safety Project Manager Change for the License Renewal Project for Indian Point Nuclear Generating Unit Numbers 2 and 3 Project stage: Other ML11109A0672011-04-19019 April 2011 Lr Hearing - FW: OAR - Safety PM Change for the License Renewal Project for Indian Point...(Tac Nos. MD5407 & MD5408) Project stage: Other CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12048B4082012-02-17017 February 2012 State of New Yorks Answer to Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention NYS-37 (Entergy Alternatives) Project stage: Request NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A2012-02-17017 February 2012 License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A Project stage: Other CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12184A0372012-06-14014 June 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML12199A0252012-07-30030 July 2012 Project Manager Change for the License Renewal of Indian Point, Units 2 & 3 Project stage: Other ML12223A3882012-09-10010 September 2012 RAI for the Review of the Indian Pont Nuclear Generating Unit Nos. 2 and 3, LRA Set 2012-02 Project stage: RAI ML12223A3672012-09-12012 September 2012 Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning RAI Set 2012-02, Reactor Vessel Internals Program Pertaining to the Indian Point, Units 2 & 3, License Renewal Application Project stage: RAI ML12270A3842012-09-26026 September 2012 Lr Hearing - Meeting Summary Project stage: Request ML12278A0772012-10-16016 October 2012 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application, Set 2012-03 Project stage: RAI NL-12-140, Reply to Request for Additional Information Regarding the License Renewal Application2012-10-17017 October 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI NL-12-166, Reply to Request for Additional Information Regarding the License Renewal Application2012-11-20020 November 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications Project stage: Response to RAI ML13015A1752013-02-0606 February 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, LRA, Set 2013-01 Project stage: RAI ML15335A2722013-02-0606 February 2013 Official Exhibit - NRC000187-00-BD01 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and Project stage: RAI ML15334A2562013-02-0606 February 2013 Official Exhibit - ENT000660-00-BD01 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2013-01 (TAC Nos. MD5407 and Project stage: Request ML15223A2632013-02-0606 February 2013 NRC000187 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) Feb. 6, Project stage: RAI ML15222A8962013-02-0606 February 2013 ENT000660 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD54 Project stage: Request ML13043A5272013-02-26026 February 2013 PM Change Letter - February 2013 Project stage: Other ML13077A2842013-03-0808 March 2013 Correction PM Letter Indian Point Project stage: Other ML13067A3152013-03-0808 March 2013 Correction to Project Manager Change for the License Renewal of Indian Point, Units 2 and 3 (TAC Nos. MD5407 & MD5408) Project stage: Other ML13127A3762013-05-0707 May 2013 Errata to NRC Staff'S Proposed and Reply Findings of Fact and Conclusions of Law on Contention NYS-5 (Buried Piping and Tanks) Project stage: Request NL-13-052, Reply to Request for Additional Information Regarding the License Renewal Application2013-05-0707 May 2013 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML13155A5042013-06-11011 June 2013 IP2-32-390 Request to Withhold-NL-12-166 Project stage: Other ML13162A6062013-06-12012 June 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-02 Project stage: RAI ML13186A1692013-07-17017 July 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013 03 Project stage: RAI ML13134A3672013-07-19019 July 2013 PM Change Letter Project stage: Other ML13205A0222013-07-24024 July 2013 Lr Hearing - Telecon Summary for 7-19-13 Call on Drais for Rvi Program and Inspection Plan Project stage: Request ML15222A8982013-07-26026 July 2013 ENT000661 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5 Project stage: Request ML15334A2572013-07-26026 July 2013 Official Exhibit - ENT000661-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 Lr Application, Set 2013-04 (TAC Nos Project stage: Request ML13204A1992013-07-26026 July 2013 RAI for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-04 Project stage: RAI ML13240A0762013-09-0303 September 2013 RAI Set 2013-5 follow-up RAI on CP Project stage: RAI ML13270A2482013-09-27027 September 2013 Lr Hearing - IPEC License Renewal - Response to Set 2013-04 RAIs Project stage: Other ML13318A4502013-11-19019 November 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating, Units 2 and 3, License Renewal Application, Set 2013-06 Project stage: RAI NL-14-010, Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application2014-01-16016 January 2014 Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan Project stage: Request NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A2014-01-28028 January 2014 Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A Project stage: Other ML15160A2002014-01-28028 January 2014 NYS000503 - Dacimo, Fred, Entergy, Letter to Document Control Desk, USNRC, Reply to Request for Additional Information Regarding the License Renewal Application, NL-14-013 (January 28, 2014) (ML14038A150) Project stage: Response to RAI ML14084A3872014-04-0101 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-01 Project stage: RAI ML15334A2582014-04-0909 April 2014 Official Exhibit - ENT000662-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2014-02 (TAC Nos. MD5407 and Project stage: Request ML15222A9012014-04-0909 April 2014 ENT000662 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5 Project stage: Request ML14094A1732014-04-0909 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-02 Project stage: RAI 2012-09-26
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 September 3, 2013
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2013-05 (TAC NOS. MD5407 AND MD5408)
Dear Sir or Madam:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, which was issued in August 2009 and supplemented in August 2011 (SER Supplement 1 ).
By letter dated July 24, 2013, Entergy responded to RAI 3.0.3.1.2-4. The staff has reviewed the response and has identified the need for additional information, which is enclosed.
This RAI was discussed with Mr. Roger Waters, and a mutually agreeable date for Entergy's response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or by e-mail at Kimberly.Green@nrc.gov.
Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc: w/encl SKin~er~ly,
/\\;
\\;L;_\\!(J.. (o"t.. :~
Kimberly Green',
- r. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation
ML13240A076 Sincerely, IRA/
Kimberly Green, Senior Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation
- concurred via email OFFICE LA:DLR/RPB1*
APM: DLR/RAPB BC:DLR/RPB1 APM: DLR/RAPB NAME I King KGreen YDiaz-Sanabria KGreen DATE 8/30/2013 9/3/2013 9/3/2013 9/3/2013
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2013-05 (TAC NOS. MD5407 AND MD5408)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRapb Resource RidsNrrDirRerb Resource RidsNrrDirRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource YDiaz KGreen WHolston DPickett STurk, OGC BMizuno, OGC SBurnell, OPA DMclntyre, OPA EDacus, OCA NSheehan, Rl OPA GMeyer, Rl JTrapp, Rl DonaldJackson, Rl DScrenci, Rl OPA PCataldo, Rl NMcNamara, Rl SWelling, Rl KDunham, Rl MCatts, Rl SStewart, Rl AmiPatel, Rl
REQUESTS FOR ADDITIONAL INFORMATION, SET 2013-03 RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION DOCKET NOS. 50-247 AND 50-286 FOLLOW-UP REQUEST REGARDING JULY 24, 3013 RESPONSE ON CATHODIC PROTECTION RAI 3.0.3.1.2-4a
Background:
The response to RAI 3.0.3.1.2-4 dated July 24, 2013 stated the following in relation to crediting the cathodic protection (CP) system:
"[t]he IPEC CP systems will not be credited as preventive measures for the in-scope buried piping."
"[t]o the extent they are proven effective, the CP systems at IPEC will be considered in risk ranking to ensure that the in-scope buried piping systems that are more susceptible to external corrosion continue to receive a higher risk ranking when determining inspection priority."
"[t]herefore, no revision to License Renewal Application Sections A.2.1.5 and A.3.1.5 is necessary because Entergy is not crediting the CP system as a preventive measure for in-scope buried piping."
The response to RAI 3.0.3.1.2-4 further stated the following in regard to using the 1 OOmV polarization criterion to demonstrate effectiveness of CP system performance:
"[f]or existing CP systems, corrosion monitoring probes may be installed near pipe depth to ensure that the pipe of concern is being adequately protected given the possible presence of mixed metal potentials."
"[t]he failure to meet the 100 mV polarization criterion (which is not uncommon in dry, high-resistance soils) during a new CP system commissioning would prompt further investigation. For example, in that circumstance, corrosion coupons or corrosion probes can be used to confirm the low corrosivity of the in situ soils, such that CP and compliance with the NACE SP0169 CP system effectiveness criteria are not necessary."
Issue:
The staff understands that the CP system will not be credited as a preventive measure for in-scope buried piping. The staff's evaluation of the acceptability of the Buried Piping and Tanks Inspection Program without crediting CP is documented in Safety Evaluation Report Section 3.0.3.1.2. However, the CP system is being credited in regard to risk ranking inspection locations. As such, the program should reflect the purpose of the CP system and its acceptance criteria (e.g., annual testing to confirm 85 percent availability, 80 percent effectiveness, a polarization potential of at least 850 mV instant-off, and upper voltage acceptance criterion of 1200 mV instant-off) that will be used when risk ranking inspection locations. Also, the updated Final Safety Analysis Report (UFSAR) Supplement should reflect the purpose of the CP system.
ENCLOSURE While the staff recognizes that buried coupons, electrical resistance probes, or placement of reference cells can be used as effective means to detect corrosion rates or localized effectiveness of CP when using the 100 mV polarization criterion in a mixed metal environment, the program does not state details such as what industry consensus document(s) will be used to install the devices, device placement, coupon characteristics, analysis of device results (e.g.,
how pitting rates versus general corrosion rates will be differentiated), how acceptance criteria will be established, and how many inspections of buried pipe will occur during the time period when the CP effectiveness is indeterminate.
Request:
- 1. Revise the Buried Piping and Tanks Inspection Program to include the purpose of the CP system and acceptance criteria that will be used when risk ranking inspection locations.
- 2. Revise the Buried Piping and Tanks Inspection Program UFSAR Supplement to reflect the purpose of the CP system.
- 3. If the 100 mV polarization criterion will be used in a mixed metal environment, respond to the following:
- a. State which industry consensus documents will be used to install and use the corrosion rate monitoring devices or reference electrodes.
- b. State the acceptance criteria for general and pitting corrosion rates when using electrical resistance probes or coupons.
- c. State how many inspections of buried pipe will occur during the time period when the CP effectiveness is indeterminate.
- d. If coupons will be used, respond to questions i through iii.
- i.
Describe the corrosion coupon characteristics, including:
the type of coupon to be used (e.g., free-corrosion coupon, polarized and native coupon pair, gravimetric, electrical resistance probe);
whether the coupons will be coated with an intentionally embedded holiday; the surface condition (e.g., presence of scale and corrosion products, surface finish) of coupons; and the composition of the coupon compared to the pipe (e.g., chemical composition and microstructure).
ii.
Describe the coupon placement, including:
how coupon locations will be selected so that they will be representative of the CP conditions at the point of interest; the number of coupons that will be buried for each linear length of buried pipe; coupon size and orientation with respect to the pipe, for example, how close both in distance and elevation the coupons will be installed to the pipe; and whether coupon will be perpendicular or parallel with the pipe; the length of time coupons will be allowed to be buried; how many years the coupons will be buried prior to accepting results; for a given portion of pipe, how will the impact of localized soil parameters, such as soil resistivity, soil chemistry, moisture content, temperature and microbiological activity, be considered; how voids in the backfill will be avoided when installing coupons; and how seasonal variability will be accounted for on soil characteristics.
iii.
Describe the analysis of coupon results, including:
what guidance will be used regarding coupon cleaning, corrosion rate calculations, and data reporting; and how pitting rates versus general corrosion rates will be differentiated.