MONTHYEARML22033A3482022-02-0101 February 2022 Revision to Holtec Decommissioning International, LLC (HDI Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and 10 CFR Part 50, Appendix E for Indian Point Unit Nos. 1, 2, and 3 Project stage: Request ML22032A0172022-02-0101 February 2022 Supplement to Holtec Decommissioning International, LLC, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and 10 CFR Part 50, Appendix E Including Site-Specific Calculations Project stage: Supplement ML22140A1262022-05-20020 May 2022 License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements Project stage: Request ML22144A0472022-05-26026 May 2022 Acknowledgement - Indian Point Energy Center - License Amendment Request to Revise License Condition to Eliminate Cybersecurity Plan Requirements Project stage: Other ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements Project stage: Acceptance Review ML22222A0872022-08-10010 August 2022 Stations, Units 1 & 2, Amended and Restated Master Decommissioning Trust Agreement Project stage: Request ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 Project stage: Other ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 Project stage: Other ML22292A2402022-10-21021 October 2022 RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022 Project stage: RAI ML22292A2392022-10-21021 October 2022 RAI Letter to Holtec Mdta Project stage: RAI ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition Project stage: Other 2022-06-16
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23171B0442023-06-23023 June 2023 Enclosure - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML22292A2402022-10-21021 October 2022 RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022 ML22103A2442022-04-13013 April 2022 Attachment - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0352022-04-13013 April 2022 Request for Additional Information Related to Exemption Request from Emergency Planning Holtec Decommissioning International, LLC Indian Point Energy Center ML22006A0452022-01-0505 January 2022 PSDAR RAIs Final ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21183A1602021-06-30030 June 2021 Update Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (06/30/2021 E-mail) ML21138A9412021-05-18018 May 2021 Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (05/18/2021 E-mail) ML21112A2672021-04-22022 April 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (Public Redacted Version) ML21019A5672021-01-19019 January 2021 Second Round Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML21013A0152021-01-12012 January 2021 Draft Request for Additional Information (E-mail Dated 1/12/2021) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20268C2352020-09-24024 September 2020 Request for Additional Information (E-mail Dated 9/24/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20233B0152020-08-20020 August 2020 Request for Additional Information (E-mail Dated 8/20/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20190A2342020-07-0808 July 2020 Request for Additional Information - Application for Order Consenting to Transfers of Control of Licenses (07/08/2020 E-mail) ML20190A1502020-06-25025 June 2020 (06/25/2020 E-mail) Draft Request for Additional Information Application for Order Consenting to Transfers of Control of Licenses ML20106F2492020-04-15015 April 2020 E-mail (04/15/2020) Request for Additional Information Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic ML20070J7902020-03-10010 March 2020 Request for Information to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000286/2020012 ML19045A6252019-02-14014 February 2019 Request for Additional Information - Proposed License Amendment Request Regarding Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool - 2/14/19 E-mail from R.Guzman to M.Mirzai NL-18-053, Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension2018-07-18018 July 2018 Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension ML18155A4842018-06-0404 June 2018 Request for Additional Information Regarding Relief Request IP3-ISI-RR-11, E-mail from R.Guzman to C.Mackaman ML18143B6792018-05-23023 May 2018 Request for Additional Information Regarding LAR for One-Time Extension of the Containment Leakage Rate Test - Email from R.Guzman to M.Mirzai ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML17296A2352017-10-23023 October 2017 Request for Additional Information -10/23/17 E-mail from R.Guzman to R.Louie Cyber Security Plan Milestone 8 Implementation Schedule (CAC Nos. MF9656, MF9657, MF9658; EPID: L-2017-LLA-0217) ML17277B5482017-10-0303 October 2017 Request for Additional Information - Relief Request IP2-ISI-RR-20 Regarding Weld Examination ML17219A1062017-08-10010 August 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel - Shielded Transfer Canister Requests for Additional Information ML17200A0852017-07-19019 July 2017 Request for Additional Information Regarding the Connection of Non-Seismic Boric Acid Recovery System to RWST Seismic Piping ML17197A0002017-07-17017 July 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 ML17103A4182017-04-25025 April 2017 Baffle Bolt Rais. Requests for Additional Information for the Review of the Indian Point License Renewal Application (TAC Nos. MD5407 and MD5408) ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) ML17100A1282017-04-11011 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment of Inter Unit Transfer of Spent Fuel ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 ML16232A1192016-09-12012 September 2016 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units Nos. 2 and 3, License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives (CAC Nos. MD5411 and MD5412) ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 ML16139A0302016-06-10010 June 2016 Request for Additional Information Regarding Conditional Exemption from End-of-Line Moderator Temperature Coefficient Measurement ML16112A2262016-04-26026 April 2016 Request for Additional Information Regarding Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16041A5782016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Moderator Temperature Coefficient Measurement Change ML16005A6292016-01-14014 January 2016 Request for Additional Information Regarding Relief Request IP2-RR-19 ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15148A4032015-06-29029 June 2015 Request for Additional Information Regarding the Spent Fuel Pool Criticality Analysis ML15156B2742015-06-16016 June 2015 Request for Additional Information Regarding Request to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15125A0972015-05-0606 May 2015 Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15071A1012015-05-0404 May 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-01 (TAC Nos. MD5407 and MD5408) ML15103A2592015-04-28028 April 2015 Request for Additional Information Regarding the Proposed License Amendment to Extend the Containment Type a Leak Rate Testing Frequency to 15 Years ML15104A5412015-04-22022 April 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) ML15072A4172015-03-17017 March 2015 Request for Additional Information Regarding Extension of the Containment Type a Leak Rate Testing Frequency to 15 Years ML14329B2452015-02-18018 February 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company 2023-06-23
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION HOLTEC MASTER DECOMMISSIONING TRUST AGREEMENT HOLTEC DECOMMISSIONING INTERNATIONAL, LLC INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1 AND 2 DOCKET NOS.50-003, 50-247, AND 72-051 By letter dated August 10, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML22222A087), Holtec Decommissioning International, LLC (HDI, the licensee) provided notification to the U.S. Nuclear Regulatory Commission (NRC) of its Amended and Restated Holtec Indian Point 2, LLC Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Unit Nos. 1 and 2 (Proposed Amended IP2 Master Trust Agreement) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.75(h)(1)(iii). 10 CFR 50.75(h)(1)(iii) requires that written notification of any material changes to the decommissioning trust agreement be provided to the Director of the Office of Nuclear Material Safety and Safeguards (NMSS) at least 30 working days before the proposed effective date of the amendment.
The NRC staff reviewed the Proposed Amended IP2 Master Trust Agreement, and, the Director of NMSS objected by email dated September 22, 2022 (ML22269A345). Based on its review of the Proposed Amended IP2 Master Trust Agreement, the NRC staff needs additional information to determine whether it complies with the applicable regulations. To complete its review, the staff has provided a request for additional information (RAI) below. The RAI specifically focuses on Section 3.07 of the Proposed Amended IP2 Master Trust Agreement, which does not appear to be consistent with 10 CFR 50.75(h)(1)(ii). There are also several general observations on the Proposed Amended IP2 Master Trust Agreement, but these do not require specific response.
Background
The Proposed Amended IP2 Master Trust Agreement submitted by HDI on August 10, 2022, is intended to replace the Entergy Master Trust Agreement. In the Proposed Amended IP2 Master Trust Agreement, Section 3.07, Investment of Funds, Paragraph (a) states the following:
The Company [i.e., HDI] shall have the authority to appoint one or more investment managers (which may include the Company, each an Investment Manager) who shall have the power to direct the Trustee in investing the assets of the Funds; provided, however, that the Trustee shall not follow any direction which would result in assets of a Qualified Fund [i.e., funds subject to Internal Revenue Code of 1986, Section 468A, Nuclear Decommissioning Reserve Fund]
Enclosure
being invested in assets other than Permissible Assets as defined in the Special Terms. To the extent that the Company chooses to exercise this authority, it shall so notify the Trustee [i.e., the Bank of New York Mellon] and instruct the Trustee in writing to separate into a separate account those assets the investment of which will be directed by each investment manager. Upon the separation of the assets in accordance with the Company instructions, the Trustee, as to those assets while so separated, shall be released and relieved of all investment duties, investment responsibilities and investment liabilities normally or statutorily incident to a trustee; provided, however, that the Trustee shall not be relieved of the responsibility of ensuring that assets of a Qualified Fund are invested solely in Permissible Assets, as defined in the Special Terms. The Trustee shall retain all other fiduciary duties with respect to assets the investment of which is directed by Investment Managers.
However, 10 CFR 50.75(h)(1)(ii) states in relevant part:
The licensee [is] prohibited from being engaged as investment manager for the funds or from giving day-to-day management direction of the funds investments or direction on individual investments by the funds, except in the case of passive fund management of trust funds where management is limited to investments tracking market indices.
The language in Section 3.07(a) appears to conflict with 10 CFR 50.75(h)(1)(ii) should HDI choose to exercise its option to become an Investment Manager, as the Company (i.e., HDI) would be directing the Trustee on investing the assets of the funds.
This notwithstanding, Section 3.07(h) of the Proposed Amended IP2 Master Trust Agreement further states:
The Company, its affiliates, and its subsidiaries are prohibited from being engaged as investment manager for the Funds or from giving day-to-day management direction of the Funds investments or direction on individual investments by the Funds, except in the case of passive fund management of the Funds where management is limited to investments tracking market indices.
The NRC staff recognizes that this verbiage is taken from 10 CFR 50.75(h)(1)(ii), so the above language would be permissible; however, this section of the Proposed Amended IP2 Master Trust Agreement would appear to conflict with Section 3.07(a) if HDI chose to exercise its Investment Management option (and that option appears to conflict with 10 CFR 50.75(h)(1)(ii)).
RAI-1 Investment of Funds It is unclear who directs the Trustee regarding assets of a Qualified Fund being invested in assets other than Permissible Assets, as defined in the Special Terms. Specifically, the NRC staff finds Section 3.07 (a) and (h) of the Proposed Amended IP2 Master Trust Agreement in conflict with each other, which does not maintain the regulations in 10 CFR 50.75(h)(1)(ii).
Request:
Please provide any supporting explanation or description, as appropriate of the HDI commitment to the Authorized Person as either the Company or an Investment Manager
(Section 3.02 of the Proposed Amended IP2 Master Trust Agreement), as well as whether HDI has any specific process on who directs activities for the Trustee.
RAI-2 Limitation on Use of Assets Permissible Assets as per Special Terms: Exhibit A of the Proposed Amended IP2 Master Trust Agreement defines Special Terms of the qualified nuclear decommissioning reserve fund.
Subsection (c), Permissible Assets (Page 3), states that any investment permitted for a qualified nuclear decommissioning reserve fund under section 468A of the Code and the regulations thereunder. However, in referencing Section 468A of the Internal Revenue Code, the NRC staff could not find language directly regarding a permissible asset or investment for a qualified decommissioning reserve fund under the cited section of the Code.
Request:
Please clarify what the Permissible Assets are per the Special Terms of the Proposed Amended IP2 Master Trust Agreement, and point out where they are defined under the cited Internal Revenue Code, to demonstrate that this language does not violate 10 CFR 50.75(h)(1)(ii).
General Observations A. By letter dated August 10, 2022, HDI stated that the Proposed Amended IP2 Master Trust Agreement would permit international investments for IP2. However, the NRC staff could not locate any language explicitly stating that international investments would be permitted under Permissible Assets or anywhere else in the document. It would be useful to consider a revision to Article V, Powers of the Trustee and Investment Manager, Section 5.01(j), of the Proposed Amended IP2 Master Trust Agreement to make clear that, not only can the IP2 decommissioning trust invest in foreign securities, but the Trustee could also invest in futures, options, short sales, foreign exchange or foreign exchange contracts, etc. (if that is the case).
B. Section 1(d) of Exhibit A to the Proposed Amended IP2 Master Trust Agreement defines substantial completion of decommissioning as the date that the maximum acceptable radiation levels mandated by the NRC with respect to a decommissioned nuclear power plant are satisfied by the Unit. The section goes on to state that if HDI requests a ruling from the Internal Revenue Service (IRS), then the IRS will make the determination on when substantial completion of decommissioning was completed. It would be useful to consider a revision to this section to clarify whether substantial completion of decommissioning at Indian Point Energy Center (IPEC) will be determined on a sitewide or unit-specific basis to meet the NRC requirements.
C. On Page 3 and Page 13 of the Proposed Amended IP2 Master Trust Agreement, there are references to the Director, Office of Nuclear Reactor Regulation. It would be useful to consider a revision to clarify that only the NMSS Director will need to be addressed for this submittal as IPEC is now in a decommissioning status.