Other: ML071900365, ML11090A078, ML11109A067, ML12199A025, ML13043A527, ML13067A315, ML13077A284, ML13134A367, ML13155A504, ML13270A248, ML14217A206, ML15007A430, ML15055A004, ML15055A014, ML15268A128, NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application, NL-10-054, Correction to License Renewal Application, NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A, NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A
|
MONTHYEARNL-07-056, Supplement to License Renewal Application2007-05-0303 May 2007 Supplement to License Renewal Application Project stage: Supplement ML0729601252007-06-21021 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 21 2007 Project stage: Request NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application2007-06-21021 June 2007 Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application Project stage: Other ML0719003652007-07-25025 July 2007 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from ENO, Inc. for Renewal of the Operating License for the Indian Point Nuclear Generating Unit Project stage: Other ML0727804392007-10-16016 October 2007 Summary of Telephone Conference Call with Entergy Nuclear Operations, Inc., Requests for Additional Information Project stage: RAI NL-10-054, Correction to License Renewal Application2010-05-27027 May 2010 Correction to License Renewal Application Project stage: Other ML11090A0782011-04-19019 April 2011 Safety Project Manager Change for the License Renewal Project for Indian Point Nuclear Generating Unit Numbers 2 and 3 Project stage: Other ML11109A0672011-04-19019 April 2011 Lr Hearing - FW: OAR - Safety PM Change for the License Renewal Project for Indian Point...(Tac Nos. MD5407 & MD5408) Project stage: Other CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12048B4082012-02-17017 February 2012 State of New Yorks Answer to Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention NYS-37 (Entergy Alternatives) Project stage: Request NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A2012-02-17017 February 2012 License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A Project stage: Other CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12184A0372012-06-14014 June 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML12199A0252012-07-30030 July 2012 Project Manager Change for the License Renewal of Indian Point, Units 2 & 3 Project stage: Other ML12223A3882012-09-10010 September 2012 RAI for the Review of the Indian Pont Nuclear Generating Unit Nos. 2 and 3, LRA Set 2012-02 Project stage: RAI ML12223A3672012-09-12012 September 2012 Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning RAI Set 2012-02, Reactor Vessel Internals Program Pertaining to the Indian Point, Units 2 & 3, License Renewal Application Project stage: RAI ML12270A3842012-09-26026 September 2012 Lr Hearing - Meeting Summary Project stage: Request ML12278A0772012-10-16016 October 2012 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application, Set 2012-03 Project stage: RAI NL-12-140, Reply to Request for Additional Information Regarding the License Renewal Application2012-10-17017 October 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI NL-12-166, Reply to Request for Additional Information Regarding the License Renewal Application2012-11-20020 November 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications Project stage: Response to RAI ML13015A1752013-02-0606 February 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, LRA, Set 2013-01 Project stage: RAI ML15335A2722013-02-0606 February 2013 Official Exhibit - NRC000187-00-BD01 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and Project stage: RAI ML15334A2562013-02-0606 February 2013 Official Exhibit - ENT000660-00-BD01 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2013-01 (TAC Nos. MD5407 and Project stage: Request ML15223A2632013-02-0606 February 2013 NRC000187 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) Feb. 6, Project stage: RAI ML15222A8962013-02-0606 February 2013 ENT000660 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD54 Project stage: Request ML13043A5272013-02-26026 February 2013 PM Change Letter - February 2013 Project stage: Other ML13077A2842013-03-0808 March 2013 Correction PM Letter Indian Point Project stage: Other ML13067A3152013-03-0808 March 2013 Correction to Project Manager Change for the License Renewal of Indian Point, Units 2 and 3 (TAC Nos. MD5407 & MD5408) Project stage: Other ML13127A3762013-05-0707 May 2013 Errata to NRC Staff'S Proposed and Reply Findings of Fact and Conclusions of Law on Contention NYS-5 (Buried Piping and Tanks) Project stage: Request NL-13-052, Reply to Request for Additional Information Regarding the License Renewal Application2013-05-0707 May 2013 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML13155A5042013-06-11011 June 2013 IP2-32-390 Request to Withhold-NL-12-166 Project stage: Other ML13162A6062013-06-12012 June 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-02 Project stage: RAI ML13186A1692013-07-17017 July 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013 03 Project stage: RAI ML13134A3672013-07-19019 July 2013 PM Change Letter Project stage: Other ML13205A0222013-07-24024 July 2013 Lr Hearing - Telecon Summary for 7-19-13 Call on Drais for Rvi Program and Inspection Plan Project stage: Request ML15222A8982013-07-26026 July 2013 ENT000661 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5 Project stage: Request ML15334A2572013-07-26026 July 2013 Official Exhibit - ENT000661-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 Lr Application, Set 2013-04 (TAC Nos Project stage: Request ML13204A1992013-07-26026 July 2013 RAI for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-04 Project stage: RAI ML13240A0762013-09-0303 September 2013 RAI Set 2013-5 follow-up RAI on CP Project stage: RAI ML13270A2482013-09-27027 September 2013 Lr Hearing - IPEC License Renewal - Response to Set 2013-04 RAIs Project stage: Other ML13318A4502013-11-19019 November 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating, Units 2 and 3, License Renewal Application, Set 2013-06 Project stage: RAI NL-14-010, Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application2014-01-16016 January 2014 Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan Project stage: Request NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A2014-01-28028 January 2014 Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A Project stage: Other ML15160A2002014-01-28028 January 2014 NYS000503 - Dacimo, Fred, Entergy, Letter to Document Control Desk, USNRC, Reply to Request for Additional Information Regarding the License Renewal Application, NL-14-013 (January 28, 2014) (ML14038A150) Project stage: Response to RAI ML14084A3872014-04-0101 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-01 Project stage: RAI ML15334A2582014-04-0909 April 2014 Official Exhibit - ENT000662-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2014-02 (TAC Nos. MD5407 and Project stage: Request ML15222A9012014-04-0909 April 2014 ENT000662 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5 Project stage: Request ML14094A1732014-04-0909 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-02 Project stage: RAI 2012-09-26
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 17, 2013 Vice President, Operations Entergy Nuclear Operations,lnc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2013-03 (TAC NOS. MD5407 AND MD5408)
Dear Sir or Madam:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy). submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, which was issued August 2009 and supplemented August 30, 2011 (SER Supplement 1).
By letter dated May 6, 2013, Entergy proposed a change to the license renewal application regarding the Metal Enclosed Bus (MEB) Inspection Program and the associated regulatory commitments. The staff has reviewed the proposed change and has identified the need for additional information, which is enclosed.
This RAI was discussed with Mr. Roger Waters, and a mutually agreeable date for Entergy's response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-8064, or bye-mail at Yoira.Diaz.Sanabria@nrc.gov Sin~ereIY,.~d~
~sanabria, Chief (j,~:~s~~nCh 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc: Listserv
July 17, 2013 Vice President, Operations Entergy Nuclear Operations,lnc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2013-03 (TAC NOS. MD5407 AND MD5408)
Dear Sir or Madam:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, which was issued August 2009 and supplemented August 30, 2011 (SER Supplement 1).
By letter dated May 6, 2013, Entergy proposed a change to the license renewal application regarding the Metal Enclosed Bus (MEB) Inspection Program and the associated regulatory commitments. The staff has reviewed the proposed change and has identified the need for additional information, which is enclosed.
This RAI was discussed with Mr. Roger Waters, and a mutually agreeable date for Entergy's response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-8064, or bye-mail at Yoira.Diaz.Sanabria@nrc.gov.
Sincerely, IRA!
Yoira Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML13186A169
- concurred via email OFFICE LA:DLR/RPB1*
APM: DLRlRAPB BC:DLRlRPB1 APM: DLR/RAPB NAME YEdmonds KGreen YDiaz-Sanabria KGreen DATE 7/15/2013 7/16/2013 7/1712013 7/16/2013 OFFICIAL RECORD COpy
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION, SET 2013-03 (TAC NOS. MD5407 AND MD5408)
DISTRIBUTION:
HARDCOPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource YDiaz GMeyer, RI KGreen JTrapp, RI DNguyen DJackson, RI CDoutt DScrenci, RI OPA DPickett PCataldo, RI STurk,OGe NMcNamara, RI BMizuno, OGC BWelling, RI SBurnell,OPA KDunham, RI DMclntyre, OPA MCatts, RI EDacus,OCA IVIHalter, RI NSheehan, RI OPA SStewart, RI APatel, RI
REQUESTS FOR ADDITIONAL INFORMATION, SET 2013-03 RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION DOCKET NOS. 50-247 AND 50-286 CHANGES TO THE METAL ENCLOSED BUS INSPECTION PROGRAM RAI 3.0.3.2.11-1
Background:
On April 23, 2007, Entergy Nuclear Operations, Inc. (Entergy or the applicant) applied for renewal of the operating licenses for Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3). The Metal Enclosed Bus (MEB) Inspection Program is described in license renewal application (LRA) Section B.1.20 and includes an enhancement to revise appropriate procedures to add the 480V MEB associated with Substation A to the scope of the program.
This enhancement is also reflected in the LRA Updated Final Safety Evaluation Report (UFSAR) Section A.2.1.19. Entergy considered this MEB to be within the scope of license renewal because it provides ac power to the IP2 diesel fire pump (DFP).
By letter dated May 6, 2013, Entergy stated that it is making a change to the LRA regarding the MEB Inspection Program and the associated regulatory commitments. Specifically, based on a recent evaluation, Entergy determined that the 480V MEB is not used for starting the DFP, but it is used to maintain batteries in a charged state, which in turn provide dc power for starting the DFP and power instrumentation. Entergy stated that any loss of the 480V MEB associated with Substation A would initiate an automatic start of the DFP via the batteries. Therefore, the 480V MEB associated with Substation A does not perform a license renewal intended function and thus, Entergy is removing the 480V MEB from the scope of program.
Issue:
Title 10 of the Code of Federal Regulations 10 CFR 54.4(a)(3) requires, in part, that all systems, structures, and components relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commission's regulation for fire protection (10 CFR 50.48) are within the scope of license renewal. This is iterated in Section 2.1.3.1.3 of NUREG-1800, Revision 1, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," which includes the following example:
...if an NSR diesel generator is required for safe shutdown under the fire protection plan, the diesel generator and all SSCs specifically relied upon for that generator to comply with NRC regulations shall be included within the scope of license renewal under 10 CFR 54.4(a)(3). Such SSCs may include, but should not be limited to, the cooling water system or systems relied upon for operability, the diesel support pedestal, and any applicable power supply cable specifically relied upon for safe shutdown in the event of a fire.
The DFP is relied upon to demonstrate compliance with the Commission's regulation for fire protection, and therefore, is within the scope of license renewal. The staff considers the MEB associated with 480V Substation A to be within the scope of license renewal because it provides ac power to the chargers to maintain the DFP batteries at full charge. The fully charged ENCLOSURE
-2 batteries will be able to start the DFP during the fire events. It appears that if the 480V MEB is not part of an aging management program, the batteries which start the DFP may become depleted and unable to perform their intended function.
Request:
Provide a technical justification for why the 480V MEB Substation A is not relied upon for the DFP to demonstrate compliance with NRC regulations. Please refer to any applicable documents or statements in your current licensing basis to support your justification.