Email from Conte, Richard to Burritt, Arthur, Et Al, Salem Unit 2/1 AFW Pipe Degradation.ML102980343 |
Person / Time |
---|
Site: |
Salem |
---|
Issue date: |
05/07/2010 |
---|
From: |
Conte R NRC Region 1 |
---|
To: |
Arthur Burritt, Richard Ennis, Timothy Lupold, Kamal Manoly, O'Hara T, Patnaik P, Daniel Schroeder, Schulten C, John Tsao Office of Nuclear Reactor Regulation, NRC Region 1 |
---|
References |
---|
FOIA/PA-2010-0334 |
Download: ML102980343 (5) |
|
Similar Documents at Salem |
---|
Category:E-Mail
MONTHYEARML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24250A0562024-07-11011 July 2024 PSEG to NMFS, Regarding Processing of Fin Clips ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) 2024-09-03
[Table view] Category:Meeting Summary
MONTHYEARML24239A8402024-08-28028 August 2024 Summary of August 20, 2024, Pre-Planning Public Meeting with PSEG Nuclear LLC to Discuss Future Amendments in Support of Stretch Power Uprate ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23276A6242023-10-12012 October 2023 Summary of the Closed Meeting with PSEG Nuclear LLC and Westinghouse Electric Company to Discuss Cobalt-60 Production at Salem Nuclear Generating Station ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23146A1012023-05-31031 May 2023 Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Sites Exclusion Area Boundary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22153A4492022-06-14014 June 2022 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Extend Emergency Diesel Generator Allowed Outage Time ML21201A0702021-08-0505 August 2021 Summary of July 20, 2021, Meeting with the National Marine Fisheries Service Regarding Incidental Take of Kemps Ridley Sea Turtles at Salem Nuclear Generating Station, Units 1 and 2 ML21064A0962021-03-0909 March 2021 Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station ML20204A8422020-07-28028 July 2020 Summary of July 20, 2020, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Proposed Relief Request for Pressurizer Weld Interval Extension ML20125A1652020-05-0404 May 2020 Summary of April 23, 2020, Teleconference with NMFS Regarding Incidental Take of Atlantic Sturgeon at Salem Nuclear Generating Station ML20113F0892020-04-27027 April 2020 Summary of April 15, 2020, Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment on Leak Before Break Analyses ML20108F0652020-04-17017 April 2020 Summary of April 15, 2020, Teleconference with PSEG Nuclear, LLC Regarding Incidental Take of Atlantic Sturgeon at Salem ML19109A1282019-04-16016 April 2019 and Hope Creek Generating Station: Summary of Public Webinar Meeting on April 10, 2019 ML18156A4242018-06-0505 June 2018 Annual Assessment Meeting, 5/30/18 Meeting Summary ML18044A9942018-02-26026 February 2018 Summary of Meeting with PSEG Nuclear LLC Regarding Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Extending the Allowed Outage Time for the Inverters ML17332A6032017-12-0404 December 2017 Summary of October 27, 2017, Conference Call with PSEG Nuclear LLC Fall 2017 Steam Generator Inspections ML17206A0282017-08-0707 August 2017 Summary of 7/19/17 Meeting with PSEG Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 ML17102A7772017-04-10010 April 2017 Summary of Annual Assessment Meeting with PSEG ML16347A3932017-01-0505 January 2017 Summary of Teleconference with PSEG Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877) ML16123A1322016-05-17017 May 2016 Summary of Public Pre-Application Meeting Held on March 30, 2016, with PSEG LLC to Discuss License Amendment Request Containment Fan Coil Unit Allowed Outage Time at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML16096A2222016-04-0505 April 2016 March 30, 2016, Summary of Annual Assessment Meeting with PSEG - Salem Nuclear Generating Station & Hope Creek Generating Station ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15202A2432015-07-29029 July 2015 June 24, 2015, Summary of Pre-Submittal Meeting with PSEG Nuclear LLC on Upgrades and Maintenance to the Chilled Water System at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML15104A1492015-04-14014 April 2015 Hope, Summary of Annual Assessment Meeting with PSEG ML14167A1592014-09-0202 September 2014 Summary of Category 1 Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 Seismic ML14100A0242014-04-10010 April 2014 Salem and Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13109A2352013-05-10010 May 2013 Summary of Conference Call Regarding the Fall 2012 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 2 ML13099A3242013-04-0909 April 2013 Salem & Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13078A4482013-04-0505 April 2013 Summary of February 28, 2013, Public Meeting with PSEG Final Supplemental Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 ML12144A3312012-05-23023 May 2012 Summary of Meeting at the PSEG to Discuss the Nrc'S Assessment of Pseg'S Safety Performance at Salem & Hope Creek for 2011 ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11139A3462011-05-26026 May 2011 Summary of Telephone Conference Call Held on May 10, 2011, Between the NRC and Nuclear, LLC, Concerning a Draft Response to a Draft RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, (Salem) License Renewal Application ML1114002132011-05-20020 May 2011 Summary of Annual Assessment Meeting for Salem and Hope Creek ML1107606042011-04-0505 April 2011 January 25, 2011, Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Information on Buried Piping Inspections at the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107007082011-04-0505 April 2011 February 17, 2011, Summary of Telephone Conference Call Held Between NRC and PSEG, Concerning Information on the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107608982011-04-0505 April 2011 January 12, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, Llx, Concerning Audit of the Westems Software Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, LR ML1036307352011-02-0909 February 2011 Summary of Telephone Conference Call Held on September 16, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, License Renewal App ML1035005662011-02-0909 February 2011 Summary of Telephone Conference Call Held on 11/18/10 Between the USNRC and PSEG Nuclear, LLC, Concerning Draft Response to the Salem Nuclear Generating Station, Units 1 and 2, Request for Additional Information, and Concerning NRC Open Ite ML1100501562011-01-26026 January 2011 Summary of Telephone Conference Call Held on September 27, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2 ML1035606562011-01-26026 January 2011 12/13/10 Summary of Telephone Conference Call Held on 12/13/10 Btw the USNRC and PSEG Nuclear, LLC, Concerning Draft Requests for Additional Information Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Appl ML1035401842011-01-0707 January 2011 10/08/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1032102502010-12-13013 December 2010 10/22/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear LLC Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1024600952010-10-14014 October 2010 Summary of Telephone Conference Call Held Between Us NRC and PSEG Nuclear, LLC Concerning Questions Pertaining to the Salem Nuclear Generation Station Units 1&2 LRA ML1026400612010-10-14014 October 2010 09/09/2010-Summary of Telephone Conference Call Between the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1023200572010-09-0303 September 2010 8/16/10 Summary of Telephone Conference Call Held Between the USNRC and PSEG Nuclear LLC Concerning a D-RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022900442010-08-31031 August 2010 Summary of Conference Call Regarding Spring 2010 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 1 ML1022305122010-08-18018 August 2010 08/04/10 Summary of Telephone Conference Call Held on Between NRC and PSEG Nuclear, LLC, Concerning Drais Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022200122010-08-13013 August 2010 Summary of Telephone Conf Call Held on 7/29/10, Between the USNRC and PSEG Nuclear LLC, Concerning Follow-Up Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station License Renewal Enviro 2024-08-28
[Table view] |
Text
.i ,
Ziev, Tracey From: Conte, Richard 4*10)
Sent: Friday, May 07, 2010 4:10 PM To: Burritt, Arthur; Ennis, Rick; Lupold, Timothy; Manoly, Kamal; OHara, Timothy; Patnaik, Prakash; Schroeder, Daniel; Schulten, Carl; Tsao, John Cc: DeFrancisco, Anne; Balian, Harry; Bowman, Eric; Brown, Michael; Cahill, Christopher; Chernoff, Harold; Gardocki, Stanley; Gray, Harold; Hardies, Robert; Hoffman, Keith; Holston, William; Modes, Michael; Pelton, David; Robinson, Jay; Sanders, Carleen; Schmidt, Wayne; Thorp, John; Taylor, Robert
Subject:
Salem Unit 2/1 AFW Pipe Degradation Attachments: SL1 AFW Degradation Telecon of 04-28-2010.doc We need another Conference to discuss developments since the April 28 telecon. See attached file for summary and actions along with residual actions. I am looking for Monday pm since Region I is in a counterparts meeting for Tues thru Thursday, can do Thursday pm. I am off Friday. ,
Some of you may have gotten emails today on entering the TS LCO related to structural integrity and how well it does or does not mesh with rule and code per 10 CFR 50.55a. These residual issues are right after the problem summary in the attached file. During the call we can summarize discuss point and counterpoint.
- 1. Does the licensee need a code relief request to cover:
- a. Time from now to the outage in 2011 lAW 10 CFR 50.55a (g) (5) (iii) as impractical to perform?
- b. Cover the first two periods of the current 10 year interval lAW 10 CFR 50.55a (g) (5) (iii) impractical to perform (they could have done it during there outages) or (iv), post ISI interval review?
- 2. Should staff inform PSEG they are violating TS LCO on structural integrity regardless of how ambiguously it is written. Do we really understand the consequence of this action.
- 3. For this case, do the rule/code requirements stand alone and what are they - evaluation of suitability for service in light of not doing the pressure drop test for Unit 2.
I hope to have a conference bridge all afternoon. Hopefully key players as noted in addressee list can communicate their availabiltiy in the pm preferrably 300pm but I am open to 1 2 or 3pm. If you want to be considered as a key player let me know.
C / lqlý
Summary of Telecon Internal to NRC staff 4/28/10 Attendees (please sent email to correct list if wrong):
Cahill, Christopher; Gray, Harold;' Hardies, Robert; Lupold, Timothy; Harry; Modes, Michael; OHara, Timothy; Ennis, Rick; Tsao, John; Manoly, Kamal; Patnaik, Prakash; Bowman, Eric; Schulten, Carl This summary also includes additional reviews and questions after the call.
Problem Summary:
As a result of implementation the PSEG buried pipe program, significant degradation of the No.
14 and 12 Auxiliary Feedwater Piping was identified - the yard section was replaced and the FHB section was abandoned in place with new piping routed above grade inside the FHB with code compliant pressure testing in each of the sections. Based on inspector questioning, PSEG wrote an internal notification reporting that the ASME code required pressure drop test for buried Class 3 piping (an inservice inspection) had never been done (IWA-5244 test). PSEG then entered a number of TS LCO for AFW and structural integrity (???? - trying to confirm) and the section 4.0 of the TS and starting developing an operability determination for Unit 2 current operations and for Unit 1 from an historical viewpoint.
More specifically, PSEG has developed an operability review for Unit 2 based on information in response to the noted unit 1 degradation on the corresponding headers in Unit 2 Nos. 24 and
- 21. They are also developing a past operability review for Unit 1 which includes finite element analysis in order to assess the structural integrity of the AFW piping and a technical evaluation to support a revised minimum wall thickness based on a revised pressure rating in order to support the historical view. Along with this the current design rating for both units is 1950 psi the basis of which remains unknown.
For Unit 1, the apparent cause is little to no coating application of the yard section of buried piping. An extent of condition was developed as a part of a root cause report that will not be finalized until the end of May 2010. Unit 2 is operating and has similar piping but the difference appears to be in the use of a better coating application based on 1994 information in the yard area and 2010 information based on a dig inside Unit 2 FHB to expose the upper header No. 24 and assess the coating and take some UT measurements.
Issues Subsequent to the April 28, 2010 conference call internal to NRC:
- 1. Does the licensee need a code relief request to cover:
- a. Time from now to the outage in 2011 lAW 10 CFR 50.55a (g) (5) (iii) as impractical to perform?
- b. Cover the first two periods of the current 10 year interval lAW 10 CFR 50.55a (g) (5)
(iii) impractical to perform (they could have done it during there outages) or (iv), post ISI interval review?
- 2. Should staff inform PSEG they are violating TS LCO on structural integrity regardless of how ambiguously it is written. Do we really understand the consequence of this action.
- 3. For this case, do the rule/code requirements stand alone and what are they - evaluation of suitability for service in light of not doing the pressure drop test for Unit 2.
Open Issues as discussed on April 28. 2010 conference call internal to NRC:
- 1. Staff view of Unit 1 yard section FEA and its applicability to Unit 2 - see below Unit 1 Operability Determination.
- 2. Staff view of analysis for reduced design pressure form 1950 to 1275 psi for Unit 1 past historical look - Lupold to get back to us, they claim they never saw it.
- 3. Adequacy on the use of the Unit 2 TS section 4.0.1 and 4.0.3 and 4.0.5 - see below on Unit 2 Operability Determination
- 4. Adequacy of Unit 2 Operability Determination
- a. There are no immediate safety issues.
- b. Licensee reviewing for explicit statement on the evaluation for suitability in this case structural integrity per sections IWA 4160, 4170, and 4180 of their code version.
- c. Staff needed to better understand condition of Unit 2 FHB deep section as to coated or not and adequacy of intact portion with wetted sand conditions with no past pressure drop test - licensee information limited from 2010.
- d. Staff needed to better understand condition of Unit 2 buried yard section with no past pressure drop test - licensee information limited from 1994.
- e. In light of the limited information above, we will need to look at the PSEG final Operability Evaluation for the U2 AFW buried piping or other document related to suitability for service. Licensee information is limited to an inference that coating was applied to Unit 2 unlike Unit 1 and Unit 2 is in better shape. Region I SRA support the PSEG risk assessment of only a slight increase in risk until the IWA-5244 test is done at the next U2 RFO (spring 2011).
- f. PSEG entered TS 4.0.3 on missed surveillance and this resulted in the above noted risk assessment:
- i. Staff informed PSEG of TIA at Pilgrim dated December 31, 2008 (m1083660174), a missed surveillance is different from a surveillance never done. With a missed surveillance, one has a basis or starting point for satisfactory conditions assuming the test past. If the test was never done then what is the basis for satisfactory conditions (can't go on the hunch that it may pass - see Ennis email of 4/26/10 which sparked the conference call.
- g. PSEG entered TS 4.01 and 4.0.5 on failure to conduct a surveillance test and this resulted in entering AFW LCO and ??? possibly the 3.4.11.1 LCO on structural integrity for code class 3 components. This then resulted in operability determinations:
- i. Based on a past TIA at Clinton (2010-001 dated April 19, 2010 (m1l 01100101)), there is separation of code ISI/IST from Surveillance testing.
Salem Unit 1 and 2 TS 4.0.5 seems to define surveillance as ASME code ISI
for components and IST for Pumps and Valves. Based on past practice and current TSB position, the code ISI requirements should be separated from TS requirements. Per rule in 1OCFr 50.55a section f and g, any conflicts between code and TS must result in a TS amendment request. The licensee has an amendment request as of Sept. 23, 2009, but based on recent review it is not clear how the structural integrity LCO is being addressed (10 CFR 50.55a f and g sections f (5) (ii) and g (5) (ii)).
ii. The issue of technical specification, ASME vs. surveillance, was resolved with the Tech Spec Branch on the line. ASME is invoked "in isolation" of the tech spec and does not connect to surveillance requirement regardless of how stated in the LCO for maintaining structural integrity is written in accordance with ISI requirement per related TS surveillance requirement.
- 5. Unit 2 Risk Assessment done per TS 4.0.3 - SRA Cahill reported being satisfied with the risk assessment done by PSEG. The risk assessment has information value and it supports a determination of a slight increase in risk (CCDP) waiting for the next refueling outage for Unit 2 for a more thorough inspection of coating and pressure drop test be done on the Nos.
24 and 22 AFW headers.
- 6. Adequacy of Unit 1 Operability Determination
- a. Staff needs to understand condition of FHB deep section as to coated or not and adequacy of intact portion with wetted sand conditions) - licensee information limited
- historical issue on significance for NRC identified finding of failure to conduct ISI (pressure drop test) per code.
- b. Tsao comments on FEA were addressed:
- i. Page 4, last paragraph. The licensee stated that the worst wall thickness is 0.077 inch. Confirm that the minimum allowable pipe wall thickness is 0.190 inch as shown on page 5, second paragraph.
ii. The stress analysis needs to include detailed pipe wall thickness measurements in all 5 subject AFW pipes so that the reviewer can understand the extent of the wall thinning
- c. Based on review with Kamal Manoly, we are going to engage the licensee technical staff on four residual questions since the FEA (see also Tsao questions in Attachment 2) appears to be a final document (answers may be addressed in the Unit 1 operability determination).
- i. Was the seismic input considered in the structural integrity analysis?
For the Ul structural integrity evaluation what is the contribution of seismic induced stresses? This is to establish the magnitude of the seismic stresses in comparison to the pressure induced stresses. It is expected that the pressure induced stresses will be the dominant stress source.
ii. What was the basis for the averaging of loads on the piping analysis?
For the Ul finite element analysis, confirm that the area of compensation for the missing material at the deepest pit ( 0.077") was within the Code calculation requirements.
iii. What documented evidence can be supplied to show a coating of what type was applied to the Unit 2 AFW piping? These are still unknowns.
iv. What does the supplier of the coating suggest is the life of the coating?
How long was the coating expected to be effective? This is still unknown.
- d. With respect to d above, the results where conveyed to DRP BC who agreed with the stated position and agreed to assist in setting up a staff-to-staff discussion on the above points with PSEG. DRS BC communicated the above issues on Friday 4/30/10. A telecom with Kamal Manoly occurred on Monday May 3 to address the c.i and c.ii issues? At the out-brief for Wednesday May 5, items c.iii and c.iv were discussed with the licensee as an issue associated with difficulty in retrieving design or as installed information - they acknowledged the issue.
- e. Headquarters review of tech eval on reduced pressure rating from 1950 to 1275.