Summary of Public Meeting to Discuss Repetitive Substantive Cross Cutting Issues
ML082880573
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/10/2008
From: Ross Telson
Reactor Projects Region 3 Branch 4
To:
Detroit Edison
References
Download: ML082880573 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 10, 2008 LICENSEE: Detroit Edison Company FACILITY: Fermi 2 Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE OCTOBER 9, 2008, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS CUTTING ISSUES On October 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III office in Lisle, Illinois. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss substantive cross cutting issues in the area of Human Performance for two consecutive assessment cycles. This meeting was requested to discuss the licensees actions to address a repetitive substantive cross-cutting issue in the area of human performance.

The NRC began the meeting with introductions and opening remarks by Cynthia Pederson.

This was followed by the licensees presentation with questions by NRC staff. The licensees meeting presentation slides can be found in ADAMS at ML082820267. The NRC interactions were verbal and did not involve slides or handouts. A list of principal meeting attendees can be found in the attached enclosure.

No members of the public attended the meeting.

/RA/

Ross Telson, Chief (Acting)

Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated DISTRIBUTION:

See next page

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 LICENSEE: Detroit Edison Company FACILITY: Fermi 2 Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE OCTOBER 9, 2008, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS CUTTING ISSUES On October 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III office in Lisle, Illinois. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss substantive cross cutting issues in the area of Human Performance for two consecutive assessment cycles. This meeting was requested to discuss the licensees actions to address a repetitive substantive cross-cutting issue in the area of human performance.

The NRC began the meeting with introductions and opening remarks by Cynthia Pederson.

This was followed by the licensees presentation with questions by NRC staff. The licensees meeting presentation slides can be found in ADAMS at ML082820267. The NRC interactions were verbal and did not involve slides or handouts. A list of principal meeting attendees can be found in the attached enclosure.

No members of the public attended the meeting.

Ross Telson, Chief (Acting)

Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\FERM\Fermi 10-09-08 Public Mtg Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt- RTelson Roldan DATE 10/10/08 10/10/08 OFFICIAL RECORD COPY

Letter to Detroit Edison Company from R. Telson dated October 10, 2008

SUBJECT:

SUMMARY

OF THE OCTOBER 9, 2008, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS CUTTING ISSUES cc w/encl: J. Davis, Senior Vice President and Chief Nuclear Officer J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality G. Williams, Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, State Liaison Officer Wayne County Emergency Management Division

Letter to Detroit Edison Company from R. Telson dated October 10, 2008

SUBJECT:

SUMMARY

OF THE OCTOBER 9, 2008, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS CUTTING ISSUES DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

PUBLIC MEETING PRINCIPAL ATTENDEES October 9, 2008 Detroit Edison Company K. Hlavaty, Plant Manager K. Scott, Operations Manager R. Johnson, Licensing Manager (Acting)

E. Kokosky, Performance Improvement Manager K. Snyder, Engineering Manager Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator C. Pederson, Director, Division of Reactor Projects S. West, Director, Division of Reactor Safety R. Telson, Chief (Acting), DRP Branch 4 Other Nuclear Regulatory Commission Attendees J. Poole, Fermi Project Manager H. Logaras, Regional Government Liaison P. Chandrathil, Public Affairs Officer T. Steadham, Resident Inspector, Fermi J. Giessner, Resident Inspector, Palisades A. Scarbeary, Reactor Engineer Enclosure