Letter Sequence RAI |
---|
|
Results
Other: ML14195A221, ML14237A194, ML15030A229, ML15076A468, ML15092A224, ML15092A243, ML15098A175, ML15341A261, ML16005A399, ML16011A009, ML16011A011, ML16011A012, ML16011A013, ML16011A014, ML16011A032, ML16011A036, ML16187A173, ML16270A567, ML16330A117, NRC-16-0014, Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal, NRC-16-0061, DTE Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.
|
MONTHYEARML14195A2212014-07-24024 July 2014 Plan for Scoping and Screening Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other ML14237A1942014-09-0505 September 2014 Plan for the Aging Management Program Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other NRC-14-0070, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12014-10-24024 October 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 1 Project stage: Response to RAI ML14288A6802014-10-29029 October 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 3 Project stage: RAI NRC-14-0072, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22014-11-18018 November 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 Project stage: Response to RAI ML14322A1782014-11-26026 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 5 Project stage: RAI NRC-14-0076, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 32014-12-0101 December 2014 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 3 Project stage: Response to RAI NRC-14-0083, Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 62014-12-30030 December 2014 Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 6 Project stage: Response to RAI NRC-15-0001, Response to NRC Request for Additional Information for the Review License Renewal Application - Set 72015-01-0505 January 2015 Response to NRC Request for Additional Information for the Review License Renewal Application - Set 7 Project stage: Response to RAI NRC-15-0013, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives2015-01-0909 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives Project stage: Response to RAI NRC-15-0009, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 152015-01-15015 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 15 Project stage: Response to RAI NRC-15-0006, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 112015-01-20020 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Project stage: Response to RAI NRC-15-0012, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 182015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 18 Project stage: Response to RAI NRC-15-0022, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-12015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-1 Project stage: Response to RAI NRC-15-0010, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 162015-02-0505 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 16 Project stage: Response to RAI ML15030A2292015-02-11011 February 2015 AMP Audit Summary Report Enclosure Project stage: Other NRC-15-0011, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 172015-02-12012 February 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 17 Project stage: Response to RAI NRC-15-0029, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-12015-02-19019 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-1 Project stage: Response to RAI ML15051A3482015-02-24024 February 2015 Schedule Revision and Project Manager Change for the Review of the Fermi 2 License Renewal Application Project stage: Approval NRC-15-0020, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Sets 19, 20, and 212015-03-0505 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Sets 19, 20, and 21 Project stage: Response to RAI NRC-15-0023, Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 22015-03-0505 March 2015 Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 2 Project stage: Response to RAI ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 Project stage: RAI ML15051A3172015-03-11011 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 24 Project stage: RAI ML15051A4202015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 23 Project stage: RAI ML15062A3362015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 26 Project stage: RAI ML15054A1712015-03-13013 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15072A2132015-03-19019 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15072A0812015-03-19019 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 25 Project stage: RAI ML15070A1612015-03-19019 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15051A5072015-03-19019 March 2015 Summary of Telecom Drai Sets 4, 5 and 6 - November 14 2014 Project stage: RAI ML15077A1082015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 27 Project stage: RAI ML15082A0462015-03-26026 March 2015 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 29, Project stage: RAI ML15078A3372015-03-26026 March 2015 Request for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 28 Project stage: RAI ML15085A5132015-04-0202 April 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 31 Project stage: RAI ML15099A0162015-04-22022 April 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application Set 32 Project stage: RAI ML15092A2432015-04-22022 April 2015 Summary of Telephone Conference Call Held on November 19, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Concerning Set 7 - November 19, 2014 Project stage: Other ML15076A4682015-04-22022 April 2015 Summary of Telephone Conference Call Held on February 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company Project stage: Other ML15099A6632015-04-23023 April 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15082A1882015-04-27027 April 2015 Summary of Conference Call Held on March 16, 2015, Between the U.S. NRC and DTE Electric Company, Concerning Requests for Additional Information, Set 27 Pertaining to the Fermi 2 License Renewal Application Project stage: RAI ML15072A2032015-04-27027 April 2015 Summary of Teleconference March 6, 2015 Between the U.S. NRC and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 License Renewal Application Project stage: RAI ML15104A5142015-05-0101 May 2015 Summary of Telephone Conference Call Held on November 25, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI NRC-15-0045, Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 32015-05-0808 May 2015 Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 3 Project stage: Response to RAI ML15117A5642015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 10, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15113A1982015-05-13013 May 2015 Summary of Telephone Conference Call Held on December 8, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15104A3882015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 25, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15098A3022015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 7,2015, Between the U.S.Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA Project stage: RAI ML15098A1752015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 17,2015, Between the Us Nuclear Regulatory Commission Project stage: Other ML15126A0042015-05-15015 May 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application-Set 34 Project stage: RAI ML15104A6322015-05-15015 May 2015 Summary of Telephone Conference Call Held on November 17, 2014 Between NRC and DTE Electric Co Re Requests for Additional Information on Fermi 2 License Renewal Application Project stage: RAI ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 Project stage: RAI 2015-02-19
[Table View] |
Similar Documents at Fermi |
---|
Category:Meeting Summary
MONTHYEARML24177A1662024-06-26026 June 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Fermi Nuclear Power Plant, Unit 2 ML23187A4562023-07-0606 July 2023 June 21, 2023, Summary of the Public Outreach to Discuss the NRC 2022 End of Cycle Plant Performance Assessment of Fermi Nuclear Power Plant Unit 2 ML22307A1252022-11-0909 November 2022 Summary of October 19, 2022, Teleconference Meeting with DTE Electric Company Regarding Proposed License Amendment Pertaining to the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 ML22144A1052022-05-24024 May 2022 Summary of Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Fermi ML21187A1662021-07-0606 July 2021 Summary of the June 24, 2021, Public Webinar to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of the Fermi Power Plant, Unit 2 ML20244A3432020-08-31031 August 2020 Summary of the August 27, 2020 Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Fermi 2 Nuclear Power Plant ML19127A0532019-05-0606 May 2019 Summary of the April 30, 2019 Public Outreach to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML18344A0652018-12-17017 December 2018 Summary of Meeting with DTE Electric Company Regarding Upcoming License Amendment Request to Transition from an 18 Month Fuel Cycle to a 24 Month Fuel Cycle. ML18194A5402018-07-16016 July 2018 Summary of Public Meeting with DTE Electric Company Regarding Upcoming License Amendment Request to Revise a License Condition Related to Boraflex Storage Racks ML18151A9502018-05-31031 May 2018 Summary of Public Outreach to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML17237B9672017-08-25025 August 2017 Summary of the July 10, 2017, Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Fermi, Unit 2 ML17067A2712017-03-13013 March 2017 February 9, 2017 Summary of Public Meeting with Dte Electric Company to Discuss the Potential Upcoming Exigent License Amendment Request Regarding TS 3.3.5.1 Emergency Core Cooling System ML16187A1792016-06-30030 June 2016 Enclosure 2 - Summary of Telecon Held on June 9, 2016, Revision 1 ML16187A1732016-06-30030 June 2016 Enclosure 1 - List of Attendees for Telecon Held on June 9, 2016 ML16166A2012016-06-13013 June 2016 Summary of the June 2, 2016, Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-Of-Cycle Performance Assessment of Fermi, Unit 2 ML16131A0662016-05-10010 May 2016 Summary of Telephone Conference Calls Held on February 10 and 25, 2016, Between U.S. Nuclear Regulatory Commission and DTE Electric Company Concerning Response to RAI 4.3.3-3a Pertaining to Fermi License Renewal Application ML15341A2612015-12-11011 December 2015 Summary of Telephone Conference Calls Held on August 4 And18, 2015, Between the U.S. NRC and DTE Electric Company Concerning the Boraflex Monitoring Program Pertaining to Fermi 2 LRA ML15175A0622015-07-0606 July 2015 Summary of Telephone Conference Call Held on May 18, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15175A0202015-07-0606 July 2015 Summary of Telephone Conference Call Held on January 14, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA (TAC No ML15175A0392015-07-0606 July 2015 Summary of Telephone Conference Calls Held on April 29 and May 4, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Co. Concerning RAIs Pertaining to Fermi 2 LRA ML15182A3292015-07-0101 July 2015 June 18, 2015, Summary of Public Open House Meeting to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML15139A5192015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Rais Pertaining to the Fermi 2 LRA ML15132A3362015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 5, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 LRA ML15133A1382015-06-11011 June 2015 Summary of Telephone Conference Calls Held on December 16, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15134A1222015-06-0909 June 2015 Summary of Telephone Conference Call Held on December 17, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15119A0582015-05-26026 May 2015 Summary of Telephone Conference Calls Held on December 5, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA (Tac No. Mf 4222) ML15092A2242015-05-26026 May 2015 Summary of Telephone Conference Call Held on March 4, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company ML15104A3032015-05-20020 May 2015 Summary of Telephone Conference Calls Held on April 8, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LAR ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 ML15104A6322015-05-15015 May 2015 Summary of Telephone Conference Call Held on November 17, 2014 Between NRC and DTE Electric Co Re Requests for Additional Information on Fermi 2 License Renewal Application ML15098A3022015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 7,2015, Between the U.S.Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15098A1752015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 17,2015, Between the Us Nuclear Regulatory Commission ML15104A3882015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 25, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15113A1982015-05-13013 May 2015 Summary of Telephone Conference Call Held on December 8, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15117A5642015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 10, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15104A5142015-05-0101 May 2015 Summary of Telephone Conference Call Held on November 25, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15082A1882015-04-27027 April 2015 Summary of Conference Call Held on March 16, 2015, Between the U.S. NRC and DTE Electric Company, Concerning Requests for Additional Information, Set 27 Pertaining to the Fermi 2 License Renewal Application ML15072A2032015-04-27027 April 2015 Summary of Teleconference March 6, 2015 Between the U.S. NRC and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 License Renewal Application ML15076A4682015-04-22022 April 2015 Summary of Telephone Conference Call Held on February 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company ML15054A1342015-03-19019 March 2015 Summary of Telephone Conference Call Held on January 22, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Requests for Additional Information Pertaining to the Fermi 2 License Renewal Application ML15051A5072015-03-19019 March 2015 Summary of Telecom Drai Sets 4, 5 and 6 - November 14 2014 ML15069A6152015-03-18018 March 2015 February 25, 2015, Summary of Pre-Application Teleconference with DTE Electric Company for a Proposed Relief Request Regarding the Core Spray System Pumps (Tac No. MF5700) ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 ML15027A3552015-02-11011 February 2015 Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning RAIs Pertaining to the Fermi, Unit 2 LRA SAMA Review ML15005A5382015-01-12012 January 2015 121814, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14330A2632014-12-15015 December 2014 Summary of Telephone Conference Call Held on November 17, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Requests for Additional Information Pertaining to the Fermi 2 License Renewal Application En ML14308A5982014-11-20020 November 2014 10/20/2014, Summary of Telephone Conference Call Held Between NRC and DTE Electric Co., Concerning Requests for Additional Information Pertaining to Fermi, Unit 2 License Renewal Application ML14308A5302014-11-20020 November 2014 Summary of Phone Call Between the NRC and DTE Electric Co, Concerning RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14233A4502014-09-18018 September 2014 Public Meeting to Discuss the License Renewal Process and Environmental Scoping Process for Fermi, Unit 2 ML14254A4652014-07-24024 July 2014 Scoping Meeting Afternoon Trancript 2024-06-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 13, 2015 LICENSEE: DTE Electric Company FACILITY: Fermi 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 10, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DTE ELECTRIC COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 33 PERTAINING TO THE FERMI 2 LICENSE RENEWAL APPLICATION (TAC NO. MF4222)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of DTE Electric Company (DTE or the applicant) held a telephone conference call on April 10, 2015, to discuss and clarify the staffs draft request for additional information (DRAI) 4.1-4a concerning the Fermi 2 license renewal application. The telephone conference call was useful in clarifying the intent of the staffs DRAI. provides a listing of the participants and Enclosure 2 contains the DRAI discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/
Daneira Meléndez-Colón, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosures:
- 1. List of Participants
- 2. Summary of Telephone Conference Call cc w/encls: Listserv
ML15117A564 *Concurred via e-mail OFFICE LA:RPB1:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME YEdmnds DMeléndez-Colón YDiaz-Sanabria DMeléndez-Colón DATE 5/ 6/15 5/11/15 5/13/15 5/13/15
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 10, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DTE ELECTRIC COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 33 PERTAINING TO THE FERMI 2 LICENSE RENEWAL APPLICATION (TAC NO. MF4222)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi2 Resource D. Melendez-Colon Y. Diaz-Sanabria E. Keegan B. Wittick B. Harris, OGC D. Roth, OGC M. Kunowski, RIII B. Kemker, RIII V. Mitlyng, RIII P. Chandrathil, RIII
TELEPHONE CONFERENCE CALL FERMI 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 10, 2015 PARTICIPANTS AFFILIATIONS Daneira Meléndez-Colón U. S. Nuclear Regulatory Commission (NRC)
James Medoff NRC Matthew Hardgrove NRC Lynne Goodman DTE Electric Company (DTE)
Kevin Lynn DTE Erica Mullen DTE Greg Brede DTE Andy Taylor Entergy Alan Cox Entergy ENCLOSURE 1
SUMMARY
OF TELEPHONE CONFERENCE CALL FERMI 2 LICENSE RENEWAL APPLICATION APRIL 10, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of DTE Electric Company (DTE or the applicant) held a telephone conference call on April 10, 2015, to discuss and clarify the following draft request for additional information (DRAI) concerning the Fermi 2 license renewal application (LRA).
DRAI 4.1-4a
Background:
The response to Request for Additional Information (RAI) 4.1-4, dated February 5, 2015, states that the standby liquid control (SLC) and core P lines internal to the reactor pressure vessel do not perform a license renewal intended function. A proprietary response to RAI 4.1-4, Part (b), which requested a clarification on whether the current licensing basis included any analyses for the internal portions of the SLC system that would need to be identified as time-limited aging analyses (TLAAs), was also provided.
Issue 1:
Based on information provided in Updated Final Safety Analysis Report (UFSAR)
Section 4.5.1.2.11, the staff has concluded that internal portions of the SLC line (i.e., the portions of the line inside of the reactor pressure vessel) need to be included within the scope of the license renewal application in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 54.4(a)(3) for anticipated transients without scram (ATWS) events, as regulated by 10 CFR 50.62.
Request 1:
- a. Amend the LRA, as appropriate, to include the internal portions of the SLC line as components that need to be within the scope of license renewal in accordance with 10 CFR 54.4(a)(3) for ATWS events.
- b. State the applicable aging effects requiring management that apply to the components and state (with justification) how these aging effects will be managed during the period of extended operation. Otherwise, justify why the applicable aging effects do not need to be age-managed if condition monitoring activities (i.e., inspections) will not be performed on the internal portions of the SLC during the period of extended operation.
ENCLOSURE 2
Issue 2:
The response to RAI 4.1-4, Part (b), identifies that both an American Society of Mechanical Engineers (ASME) Code fatigue analysis and a vibrational loading analysis were applied to the internal portions of the SLC line. The staffs assessment of the vibrational loading analysis for the internal portions of SLC line will be addressed through the review of the anticipated supplemental response to RAI 4.1-1. Regarding the referenced ASME Code Section III NB-3650 fatigue analysis, the alternating stress range value does not serve as an adequate basis for implying that the analysis does not involve time-limited assumptions defined by the current operating term. Instead, if an ASME Code Section III cumulative usage factor (CUF) analysis was performed for internal portions of the SLC line in accordance with NB-3650 requirements and the analysis is based on the number of cycles assumed for applicable design basis transients during the current 40-year licensing period, the analysis will meet Criterion (3) for TLAAs in 10 CFR 54.3(a) and the analysis does involve time-dependent assumptions defined by the current operating term.
Request 2:
If a CUF analysis has been performed for the internal portions of the SLC lines under the requirements of ASME Code Section III NB-3650, justify why the CUF analysis would not need to be identified as a TLAA analogous to the manner the fatigue analyses for the internal portions of the core spray lines, the jet pump riser braces, the access hole covers, and the jet pump auxiliary spring wedge assemblies have been identified as TLAAs in LRA Table 4.3-3.
Alternatively, if the design basis is such that it includes an alternative type of cyclical loading analysis for the internal portions of the SLC lines (e.g., an ASME Code Section III fatigue exemption or waiver analysis or a time-dependent expansion stress and maximum allowable stress range reduction analysis), justify whether the analysis needs to be identified as a TLAA for the LRA, when compared to the six criteria in 10 CFR 54.3(a) for defining TLAAs.
Discussion:
The staff provided clarification related to its request in draft RAI 4.1-4a.
The applicant stated that they do not think that the internal portions of the SLC line (i.e., the portions of the line inside of the reactor pressure vessel) need to be included within the scope of license renewal. The applicant discussed the basis for their position.
Based on the discussion with the applicant, the staff indicated that this question will be deferred for further discussion in a future conference call or a meeting.