OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this
transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Senior VP and Chief Nuclear Officer
DTE Electric Company
Fermi 2 - 260 TAC
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
FERMI POWER PLANT, UNIT 2 - CYBER SECURITY INSPECTION REPORT
Dear Peter Dietrich:
On August 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Fermi Power Plant, Unit 2 and discussed the results of this inspection with you and other
members of your staff. The results of this inspection are documented in the enclosed report.
Four findings of very low security significance (Green) are documented in this report. Four of
these findings involved violations of NRC requirements. We are treating these violations as
non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this
inspection report, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission,
ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional
Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear
Security and Incident Response; and the NRC Resident Inspector at Fermi Power Plant, Unit 2.
The following cross-cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.1] - Resources, one [H.14] - Conservative
Bias, one [H.7] - Documentation, and one [P.2] - Evaluation.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director,
Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Fermi
Power Plant, Unit 2.
October 5, 2023
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
P. Dietrich
2
Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this
transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,
Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be
made publicly available in accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related
Information, please mark your entire response Security-Related Information-Withhold from
public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the
instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit
requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
Jennifer L. Dalzell, Acting Branch Chief
Engineering Branch 2
Division of Operating Reactor Safety
Docket No. 05000341
License No. NPF-43
Enclosure:
As stated
cc: P. ORourke, Security Manager
T. R. Wentworth, State Liaison Officer, State of Michigan
cc w/o encl: Distribution via LISTSERV
Signed by Dalzell, Jennifer
on 10/05/23
ML23276B454 (Cover letter)
Entire Report:
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
Cover Letter Only:
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE
RIII
NAME
JDalzell:sw
DATE
10/05/2023