DTE Electric Company 6400 N. Dixie Highway Newport, Ml 48166 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 OTE January 20, 2023 10 CFR 55.40 NRC-23-0003 Ms. Patricia J. Pelke, Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Fermi 2 Initial License Operator Examination Outline

References:

1) FERMI POWER PLANT, UNIT 2 - CONFIRMATION OF INITIAL LICENSE EXAMINATION, ML22322A108 Enclosed please find the proposed examination outline for the upcoming Fermi 2 Initial License Examination that is scheduled to begin the week of June 19, 2023:
  • Examination Outline Quality Checklist (Form 2.3-1)
  • Photocopies of Examination Security Agreements (Form 1.3-1)
  • RO Administrative Topics Outline (Form 3.2-1)
  • SRO Administrative Topics Outline (Form 3.2-1)
  • RO Control Room/In-Plant Systems Outline (Form 3.2-2)
  • SRO Instant Control Room/In-Plant Systems Outline (Form 3.2-2)
  • Events and Evolutions Checklist (Form 3.4-1)
  • Scenario Outlines (Form 3.3-1)
  • BWR Examination Outline (Form 4.1)
  • Record of Rejected K/As (Form 4.1-1)
  • Draft Operating Test Administration Schedule
  • Preliminary NRC Review Test Items (10 written questions, 1 scenario, and 2 JPMs)

The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED

USNRC NRC-23-0003 Page 2 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 The examination outline was developed using the appropriate guidance contained in NUREG-1021, Revision 12. These materials shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Justin Angel, Director Nuclear Training, at (734) 586-4055.

No new commitments are being made in this submittal.

Sincerely,

/

Justin Angel Director Nuclear Training Enclosures cc: [w/o Enclosures]

NRC Project Manager Reactor Projects Chief, Branch 2, Region III NRC Resident Office The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED

DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 DT E Enclosure to

[NRC-23-0003]

Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43

[Title of enclosure]

The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED to