Summary of Conference Call with Tennessee Valley Authority (TVA) License Renewal Staff Regarding Information on Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Renewal Application
ML051400190
Person / Time
Site: Browns Ferry  
Issue date: 05/19/2005
From: Subbaratnam R
NRC/NRR/DRIP/RLEP
To:
Tennessee Valley Authority
Subbaratnam R NRR/DRIP/RLEP, 415-1478
References
TAC MC1704, TAC MC1705, TAC MC1706
Download: ML051400190 (7)


Text

May 19, 2005 LICENSEE:

Tennessee Valley Authority (TVA)

FACILITY:

Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3

SUBJECT:

SUMMARY

OF A CONFERENCE CALL HELD ON MAY 11, 2005, BETWEEN THE NRC STAFF AND TENNESSEE VALLEY AUTHORITY (TVA) LICENSE RENEWAL STAFF, CONCERNING INFORMATION ON BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. MC1704, MC1705, AND MC1706)

On May 11, 2005, the U.S. Nuclear Regulatory Commission (NRC) staff, Division of Regulatory Improvement Programs (DRIP), conducted a conference call with TVA, the applicant. This was a follow-up call concerning the applicants response to the staffs requests for additional information (RAIs) previously issued on August 31, 2004 in Section 2.3 - Scoping and Screening Results: Mechanical Systems; and follow up RAIs related to the applicants results of Seismic Class I qualification documentation submitted on February 28, 2005 for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 license renewal application (LRA).

During the conference call, the applicant agreed to provide written responses to the follow-up RAIs. provides a list of the conference call participants. Enclosure 2 is a summary of the RAIs discussed during the conference call.

The applicant had an opportunity to comment on the meeting summary.

/RA/

Ram Subbaratnam, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-259, 50-260 and 50-296

Enclosures:

As stated

May 19, 2005 LICENSEE:

Tennessee Valley Authority (TVA)

FACILITY:

Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3

SUBJECT:

SUMMARY

OF A CONFERENCE CALL HELD ON MAY 11, 2005, BETWEEN THE NRC STAFF AND TENNESSEE VALLEY AUTHORITY (TVA) LICENSE RENEWAL STAFF, CONCERNING INFORMATION ON BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. MC1704, MC1705, AND MC1706)

On May 11, 2005, the U.S. Nuclear Regulatory Commission (NRC) staff, Division of Regulatory Improvement Programs (DRIP), conducted a conference call with TVA, the applicant. This was a follow-up call concerning the applicants response to the staffs requests for additional information (RAIs) previously issued in August 31, 2004 in Section 2.3 - Scoping and Screening Results: Mechanical Systems; and follow up RAIs related to the applicants results of Seismic Class I qualification documentation submitted on February 28, 2005 for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 license renewal application (LRA).

During the conference call, the applicant agreed to provide written responses to the follow-up RAIs. provides a list of the conference call participants. Enclosure 2 is a summary of the RAIs discussed during the conference call.

The applicant had an opportunity to comment on the meeting summary.

/RA/

Ram Subbaratnam, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-259, 50-260 and 50-296

Enclosures:

As stated ADAMS Accession No.: ML051400190 E:\\Filenet\\ML051400190.wpd OFFICE PM:RLEP PM:RLEP LA:RLEP SC:RLEP NAME:

YDiaz-Sanabria RSubbaratnam MJenkins SLee (J. Zimmerman for)

DATE:

5/18/05 5/18/05 5/17/05 5/19/05 OFFICIAL RECORD ONLY LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 LICENSE RENEWAL APPLICATION MAY 4, 2005 Participants Affiliations Ram Subbaratnam U.S. Nuclear Regulatory Commission (NRC)

Yoira Diaz NRC Jin Guo NRC Kim Green NRC Ken Brune Tennessee Valley Authority (TVA)

Roger Jennings TVA Mickey Hamby TVA Don Arp TVA

Enclosure 2

SUMMARY

OF REQUESTS FOR ADDITIONAL INFORMATION (RAIs)

DISCUSSED DURING THE CONFERENCE CALL HELD BETWEEN U.S. NUCLEAR REGULATORY COMMISSION (NRC)

AND TENNESSEE VALLEY AUTHORITY (TVA) LICENSE RENEWAL STAFF MAY 11, 2005 RAI 2.3.3.21-4: The applicant will include the non-electrical part of the flow indicators as pressure retaining component with the intended function of pressure boundary. The applicant will confirm this in a supplemental information to be formally submitted. Therefore, the RAI is resolved.

RAI 2.3.3.28-1: The applicant explained that the drain pan does not perform a safety function, and it is an external drain pan used to collect any oil spillage during a filter replacement.

Hence, the item will not be considered to be included in scope. Therefore, the RAI is resolved.

RAI 2.3.4.4-1 and RAI 2.3.4.4-2: The applicant will re-evaluate the secondary containment integrity for all units as a result of follow-up to RAI 2.1-2A. This RAI will remain unresolved until submission of response to RAI 2.1-2A, sub-parts (1) and (2).

RAI 2.3.4.5-1: This RAI is related to a bold bordered item in Appendix F of the LRA concerning Unit 1 commitments. This will be covered in Section 2.6.1.1 of the SER, which will discuss Appendix F.1 of the LRA, main steam isolation valve (MSIV) leakage pathway modifications related to mechanical scoping. Therefore, the RAI is resolved.

DISTRIBUTION: Summary of a conference call on May 4, 2005 with TVA, Dated: May 19, 2005 Adams Accession No: ML051400190 HARD COPY:

RLEP RF Ram Subbaratnam (PM)

Yoira Diaz-Sanabria (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti K. Naidu C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff K. Jabbour C. Julian (RII)

S. Cahill (RII)

A. Hodgdon C. Carpenter D. Coe E. Kleeh A. Howe J. Lyons, DLPM M. Chernoff, DLPM F. Gillespie, DRIP J. Guo

BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:

Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael J. Lorek, General Manager Nuclear Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. Skaggs, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Kurt L. Krueger, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Jon R. Rupert, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones Browns Ferry Unit 1 Plant Restart Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Fredrick C. Mashburn, Senior Program Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Bobby L. Holbrook Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970

BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:

State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Mr. James Ross Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-2708 Ken Brune, Manager Browns Ferry License Renewal Project Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801