Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application
ML041760076
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/23/2004
From: Sanabria Y
NRC/NRR/DRIP/RLEP
To: Singer K
Tennessee Valley Authority
Sanabria, Y D, NRR/DRIP/RLEP/415-1594
References
TAC MC1704, TAC MC1705, TAC MC1706
Download: ML041760076 (6)


Text

June 23, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 LICENSE RENEWAL APPLICATION (TAC NOS. MC1704, MC1705 AND MC1706)

Dear Mr. Singer:

By letter dated December 31, 2003, Tennessee Valley Authority (TVA) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for the Browns Ferry Nuclear Plant, Units 1, 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified areas where additional information is needed to complete the review. Those areas are stated in the enclosed requests for additional information (RAIs), specifically from Section 3.5, related to the lay-up effects of Browns Ferry Unit 1 structures and components supports.

Based on discussions with Mr. Gary Adkins of your staff, a mutually agreeable date for your response to the RAIs is within 30 days of the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at (301) 415-1594 or by e-mail at yks@nrc.gov Sincerely,

/RA/

Yoira K. Diaz Sanabria, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-259, 50-260 and 50-296

Enclosure:

As stated cc w/encl: See next page

June 23, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 LICENSE RENEWAL APPLICATION (TAC NOS. MC1704, MC1705 AND MC1706)

Dear Mr. Singer:

By letter dated December 31, 2003, Tennessee Valley Authority (TVA) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for the Browns Ferry Nuclear Plant, Units 1, 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified areas where additional information is needed to complete the review. Those areas are stated in the enclosed requests for additional information (RAIs), specifically from Section 3.5, related to the lay-up effects of Browns Ferry Unit 1 structures and components supports.

Based on discussions with Mr. Gary Adkins of your staff, a mutually agreeable date for your response to the RAIs is within 30 days of the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at (301) 415-1594 or by e-mail at yks@nrc.gov Sincerely,

/RA/

Yoira K. Diaz Sanabria, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-259, 50-260 and 50-296

Enclosure:

As stated cc w/encl: See next page Accession no. ML041760076 DISTRIBUTION: See next page

  • Input provided by memo Document Name: C:\\ORPCheckout\\FileNET\\ML041760076.wpd OFFICE PM:RLEP LA:RLEP SC:EMEB*

SC:RLEP NAME Y. Diaz-Sanabria Y. Edmonds K. Manoly S. Lee DATE 6/21/04 6/21/04 5/7/04 6/23/04 OFFICIAL RECORD COPY

DISTRIBUTION: Dated: June 23, 2004 Accession No: ML041760076 HARD COPY RLEP RF Yoira Diaz-Sanabria (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff K. Jabbour C. Julian (RII)

S. Cahill (RII)

A. Hodgdon C. Carpenter D. Coe E. Kleeh A. Howe

Enclosure REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO THE LAY-UP EFFECTS OF BROWNS FERRY UNIT 1 STRUCTURES AND COMPONENT SUPPORTS BROWNS FERRY NUCLEAR PLANT LICENSE RENEWAL APPLICATION CIVIL AND ENGINEERING MECHANICS SECTION RAI 3.5-1 Browns Ferry Nuclear Plant (BFN) document titled, "Evaluation of the BFN Unit 1 Lay-Up and Preservation Program," including Tables 1 through 4, does not provide information related to BFNs evaluation of the Unit 1 spent fuel storage system lay-up effects. Please describe the method adopted in assessing the Unit 1 spent fuel storage system related lay-up effects. Also provide a discussion of the applicable spent fuel pool environments (any delta change in pool water chemistry, ambient humidity and temperature, etc.), results of past periodic inspections of the spent fuel pool structural components and pool liners, any observed pool leakages or degraded conditions, and corrective actions taken to support BFNs conclusion that no lay-up effect is applicable to Unit 1 spent fuel storage system.

RAI 3.5-2 Please describe the approach used in evaluating the Unit 1 structures and component supports related lay-up effects. Provide a discussion of the environments applicable to Unit 1 structures and component supports (e.g., any exposure to aggressive chemicals or ponding of water, significant change in ambient humidity and temperature, etc.), results of past periodic inspections of the structures and component supports, any observed degraded conditions, and corrective actions taken to support BFNs conclusion that no lay-up effect is applicable to Unit 1 structures and component supports that require an Aging Management Review (AMR).

RAI 3.5-3 When the plant is operating, the containment drywell, torus, and connecting vent assemblies are subjected to relatively inert environment, and all the requirements related to their inspections, and leak-rate testing are applicable. These requirements ensure the leak tight, and structural integrity of these components. Also, the industry operating experience problems, as reflected in NRCs Generic Letters, Information Notices, and other industry published event reports are considered as applicable. These activities may or may not have been considered for Unit 1 during its long lay-up. In this context, the applicant is requested to provide information that would describe the benchmark condition of the containment pressure boundary related components prior to restart of the Unit, and actions that will be taken prior to the extended period of operation. The relevant regulatory requirements would be:10 CFR 50.55a, and Appendix J of 10 CFR 50. The relevant Generic Letters would be: GL 87-05, GL 89-16, and GL 98-05. The relevant Information Notices would be: IN 86-99, IN 88-82, IN 89-06, IN 89-79, and IN 92-20.

Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:

Mr. James E. Maddox, Vice President Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. T. J. Niessen, Acting General Manager Nuclear Assurance Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. Skaggs Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Jon R. Rupert, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones Browns Ferry Unit 1 Plant Restart Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-2708 Gary M. Adkins Manager, Browns Ferry License Renewal Project Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801