Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML040650206, ML040910016, ML041310015, ML041310029, ML041310206, ML041700505, ML041700523, ML041700550, ML041700572, ML041950508, ML041980222, ML042010388, ML042240255, ML042390497, ML042580327, ML042820624, ML042920201, ML042990519, ML043000040, ML050310428, ML050320137, ML051180046, ML051180464, ML051250308, ML051400190, ML051460418, ML052140646, ML052170406, ML052210484, ML052220070, ML052630075, ML053050358, ML060410288, ML060450582, ML060950060, ML061110094, ML061110102, ML061110126, ML061140182, ML061140209, ML061140322, ML061140352, ML061730464, ML091540582, ML091870509, ML11171A037, ML11171A038, ML11308A018
|
MONTHYEARML0336503552003-12-31031 December 2003 Forthcoming License Renewal Meeting Between the U.S. NRC Staff and the Nuclear Energy Institutes (Neis) License Renewal Working Group; Carolina Power and Light Company (Cp&L), for the H.B. Robinson Steam Electric Plant Project stage: Meeting ML0405102412004-02-19019 February 2004 January 28, 2004 Meeting Follow-Up - Additional Information Project stage: Meeting ML0406502062004-03-0404 March 2004 Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from Tennesssee Valley Authority for Renewal of the Operating Licenses for Browns Ferry, Units 1, 2 & 3 Project stage: Other ML0409100162004-03-31031 March 2004 Review Schedule for Application for Renewal of the Operating Licenses for the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Project stage: Other ML0413100152004-05-0404 May 2004 Summary of Telephone Conferences on April 7, 2004, Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant Units 1, 2 and 3, License Renewal Application Project stage: Other ML0413100292004-05-0606 May 2004 & 03/31/2004 Summary of Telephone Conferences with Tennesssee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant, Units 1, 2 & 3 LRA Project stage: Other ML0413102062004-05-10010 May 2004 Summary of Telephone Conferences with Tennessee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0414604202004-05-25025 May 2004 Revision of Schedule for Conduct of Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3 License Renewal Application Project stage: Approval ML0419501002004-06-10010 June 2004 Audit and Review Plan for Plant Aging Management Programs and Reviews - Browns Ferry Nuclear Plant, Units 1, 2 and 3 Project stage: Request ML0417005502004-06-15015 June 2004 Summary of Telephone Conference with the Tennessee Valley Authority Regarding Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0417005232004-06-16016 June 2004 Summary of Telephone Conference Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0417005052004-06-16016 June 2004 Summary of Telephone Conference with Tennessee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0417005722004-06-18018 June 2004 Summary of Telephone Conference with Tennessee Valley Authority Regarding Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0417600762004-06-23023 June 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: RAI ML0418101682004-06-28028 June 2004 Summary of Telephone Conference on May 27, 2004, Between the U.S. NRC and the Tennessee Valley Authority Concerning Draft Requests for Additional Information on Browns Ferry Nuclear Plant, Units 1, 2 and 3 LRA Project stage: Draft RAI ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0419505082004-07-10010 July 2004 Summary of Telephone Conference on June 16, 2004, Between the NRC & TVA Concerning Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: Other ML0420103882004-07-19019 July 2004 Summary of Telephone Conference with Tennessee Valley Authority Concerning Activities on Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: Other ML0421104852004-07-28028 July 2004 Summary of Telephone Conference Held on July 1, 2004, Between NRC and TVA Concerning Draft Requests for Additional Information (D-RAI) on Browns Ferry Nuclear Plant Units 1, 2,& 3 Project stage: Draft RAI ML0421201862004-07-30030 July 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: RAI ML0422402552004-08-10010 August 2004 Audit and Review Plan for Plant Aging Management Reviews and Programs at the Browns Ferry Nuclear Power Plants, Units 1, 2 and 3 Project stage: Other ML0423904972004-08-23023 August 2004 Summary of Telephone Conference Held on July 28, 2004, Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Browns Ferry Nuclear Plant, Units 1 and 2 and 3, License Renewal Application. Project stage: Other ML0423605902004-08-23023 August 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: RAI ML0423607622004-08-23023 August 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: RAI ML0424005502004-08-26026 August 2004 Summary of Telephone Conference Held on July 27, 2004, Between U.S. Nuclear Regulatory Commission & Tennessee Valley Authority Concerning Draft Requests for Additional Information on Browns Ferry Nuclear Plant, Units 1, 2 & 3, License Renew Project stage: Draft RAI ML0424502112004-08-31031 August 2004 Summary of Telephone Conference Held on July 12, 2004, Between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) Concerning Requests for Additional Information (RAI) on Browns Ferry Nuclear Plant, Unts 1, Project stage: RAI ML0424502602004-08-31031 August 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: RAI ML0425203742004-09-0303 September 2004 (BFN) - Units 1, 2, and 3 License Renewal Application - NRC Scoping and Screening Audit - Request for Additional Information Project stage: Request ML0426005222004-09-16016 September 2004 Summary of Telephone Conference Held on August 19, 2004, Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Draft Requests for Additional Information on Browns Ferry Nuclear Plant, Units 1, 2 & 3 Lr Project stage: Draft RAI ML0425803272004-09-16016 September 2004 Audit Trip Report Regarding the Tennessee Valley Authority License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Dated December 31, 2003 Project stage: Other ML0427502592004-09-30030 September 2004 License Renewal Application Response to NRC Request for Additional Information (RAI) Project stage: Response to RAI ML0428206242004-10-0707 October 2004 License Renewal Application - Notification of Change of TVA License Renewal Project Manager Project stage: Other ML0428704222004-10-0808 October 2004 License Renewal Application - Response to NRC Request for Additional Information Related to Aging of Mechanical Systems During the Extended Outage Project stage: Response to RAI ML0428600662004-10-0808 October 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application (RAI 2.3.2-2.3.3) Project stage: RAI ML0428704282004-10-0808 October 2004 (BFN) - Units 1, 2, and 3 License Renewal Application - Response to NRC Request for Additional Information Developed During the License Renewal Audit Inspections for Comparison to Generic Aging Lessons Learned Project stage: Response to RAI ML0428600152004-10-0808 October 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application (2.3 Rx Systems) Project stage: RAI ML0428601332004-10-12012 October 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application (Aux System\\Rai 3.3) Project stage: RAI ML0429202012004-10-15015 October 2004 Summary of Telephone Conference Call Held on September 15, 2004, Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Application Project stage: Other ML0429304712004-10-18018 October 2004 License Renewal Application - Response to NRC Request for Additional Information (RAI) Project stage: Response to RAI ML0429309312004-10-19019 October 2004 Units 1, 2, and 3 License Renewal Application Response to NRC Request for Additional Information Project stage: Response to RAI ML0429905192004-10-21021 October 2004 Summary of Telephone Conference Held on September 22, 2004, Between the U.S. Nuclear Regulatory Commission and the Tennessee Valley Authority Concerning Browns Ferry Nuclear Plant, Units 1, 2 and 3, LRA Project stage: Other ML0430000402004-10-22022 October 2004 Summary of Telephone Conference with Tennessee Valley Authority Concerning Browns Ferry Nuclear Plant, Units 1, 2 and 3 License Renewal Application Project stage: Other ML0430001492004-10-25025 October 2004 (BFN) Units 1, 2, and 3 License Renewal Application - Appendix F - Request for Additional Information (RAI) Project stage: Request ML0430304342004-10-28028 October 2004 Units 1, 2, and 3 License Renewal Application Fire Protection Section Verbal Request on October 20, 2004 - Response to NRC Request for Additional Information Project stage: Response to RAI ML0430604922004-11-0101 November 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, License Renewal Applicaiton Project stage: RAI ML0431005882004-11-0303 November 2004 (Ban) - Units 1, 2, and 3 License Renewal Application - Reactor Systems Section 2.3.1, 2.3.2, and 2.3.3 - Response to Request for Additional Information Project stage: Response to RAI ML0430905452004-11-0303 November 2004 License Renewal Application, Heating, Ventilation and Cooling (HVAC) Systems Sections 2.3.2 and 2.3.3, Request for Additional Information (RAI) Project stage: Request ML0430903432004-11-0303 November 2004 License Renewal Application Auxiliary Systems Section 3.3 Response to NRC Request for Additional Information Project stage: Response to RAI ML0430905772004-11-0404 November 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, LRA (TAC Nos. MC1704, MC1705 and MC1706.) Project stage: RAI ML0430905732004-11-0404 November 2004 Request for Additional Information for the Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3, LRA Project stage: RAI 2004-05-04
[Table View] |
Text
May 24, 2005 10 CFR 54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
) Docket Nos. 50-259 Tennessee Valley Authority
) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -
LICENSE RENEWAL APPLICATION (LRA) - RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION ON FOLLOW-UP TO RAI 2.3.3.21-4b (TAC NOS. MC1704, MC1705, AND MC1706)
By letter dated December 31, 2003, TVA submitted, for NRC review, an application pursuant to 10 CFR 54, to renew the operating licenses for the Browns Ferry Nuclear Plant, Units 1, 2, and 3. As part of its review of TVAs LRA, the NRC staff, through an informal request on May 21, 2005, identified additional information needed for follow-up to RAI 2.3.3.21-4b.
The enclosure to this letter contains the specific NRC request for additional information and the corresponding TVA response.
U.S. Nuclear Regulatory Commission Page 2 May 24, 2005 If you have any questions regarding this information, please contact Ken Brune, Browns Ferry License Renewal Project Manager, at (423) 751-8421.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 24th day of May, 2005.
Sincerely, Original Signed by:
T. E. Abney Manager of Licensing and Industry Affairs
Enclosure:
cc: See page 3
U.S. Nuclear Regulatory Commission Page 3 May 24, 2005 Enclosure cc (Enclosure):
State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, Alabama 35611 (Via NRC Electronic Distribution)
Enclosure cc (Enclosure):
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 cc: continued page 4
U.S. Nuclear Regulatory Commission Page 4 May 24, 2005 cc: (Enclosure)
Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Yoira K. Diaz-Sanabria, Project Manager U.S. Nuclear Regulatory Commission (MS 011F1)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Ramachandran Subbaratnam, Project Manager U.S. Nuclear Regulatory Commission (MS 011F1)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 5 May 24, 2005 JEM:TLE:BAB Enclosure cc (Enclosure):
A. S. Bhatnagar, LP 6-C K. A. Brune, LP 4F-C J. C. Fornicola, LP 6A-C R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN R. F. Marks, Jr., PAB 1A-BFN F. C. Mashburn, BR 4X-C N. M. Moon, LP 6A-C J. R. Rupert, NAB 1F-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS, WT CA-K s://Licensing/Lic/Submit/Sub/License Renewal/BFN LR Clarification On Follow-up to RAI 2.3.3.21-4b Letter.doc
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION (LRA)
RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI) ON FOLLOW-UP TO RAI 2.3.3.21-4b (SEE ATTACHED)
E-1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION (LRA)
RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI) ON FOLLOW-UP TO RAI 2.3.3.21-4b By letter dated December 31, 2003, TVA submitted, for NRC review, an application pursuant to 10 CFR 54, to renew the operating licenses for the Browns Ferry Nuclear Plant, Units 1, 2, and 3. As part of its review of TVAs LRA, the NRC staff, through an informal request on May 4, 2005, identified additional information needed for follow-up to RAI 2.3.3.21-4b. This enclosure contains the specific NRC request for additional information and the corresponding TVA response.
NRC Follow-up to RAI 2.3.3.21-4b With regard to RAI 2.3.3.21-4b, the applicant stated that flow indicators are not contained as a component type in LRA Table 2.3.3.21. Flow indicators were excluded from an AMR based on guidance provided in NEI 95-10 Appendix B.
Based on its review, the staff is not able to find the applicant's response to RAI 2.3.3.21-4 acceptable. The applicant follows the guidance in NEI 95-10 which lists flow indicators as active components. However, the flow indicators in question are in-line indicators. The indicator portion of the component is an active component, but the piping portion of the indicator through which flow goes provides a pressure boundary function. Therefore, this portion of the component should be within scope and subject to an AMR. Therefore, the staff is not able to determine that the integrity of the reactor water cleanup system will be ensured.
TVA Response to follow up to RAI 2.3.3.21-4b The pressure boundary portion of the flow indicators are in scope and are evaluated as fittings in the Control Rod Drive System (85). License Renewal Drawings 1-47E810-1-LR, 2-47E810-1-LR, and 3-47E810-1-LR were revised to show FI-75 and FI-77 in blue for 54.4(a)(2). The pressure retaining portion of the flow indicators are stainless steel with an internal environment of treated water with an external environment of inside air and are already contained in Table 3.3.2.29 of the LRA.
E-2 All license renewal boundary drawings were reviewed for in-line flow indicators which provide a pressure boundary function. This review identified that the following system drawings also contain flow indicators that form a pressure boundary, and the drawings were updated as listed below:
System 43 changes Drawing 1-47E610-43-1-LR was revised to show FI-11,
-12A, and -12B and FIS-13A and -13B in blue for 54.4(a)(2).
Drawing 2-47E610-43-1-LR was revised to show FI-10,
-11, -12A, -12B, FIC-10A, -10B, -10C, -11A, -11B,
-11C, -12A, -12B, and FIS-13A and -13B in blue for 54.4(a)(2).
Drawing 3-47E610-43-1-LR was revised to show FIS-13A and -13B in blue for 54.4(a)(2).
Drawing 3-47E610-43-6-LR was revised to show FI-10,
-11, -12A, -12B and FIC-11A, -11B, -11C, -12AA, -12AB,
-12BA, and -12BB in blue for 54.4(a)(2).
No changes are required to LRA Table 3.3.2.14 since fittings contain the material/environment combinations for the in-line FIs, FICs and FISs which provide a pressure boundary function.
System 68 changes Drawing 1-47E817-1-LR was revised to show FIS-55, -62,
-68, and -74 in blue for 54.4(a)(2).
Drawing 2-47E817-1-LR was revised to show FIS-55, -62,
-68, and -74 in blue for 54.4(a)(2).
Drawing 3-47E817-1-LR was revised to show FIS-55, -62,
-68, and -74 in blue for 54.4(a)(2).
Drawing 1-47E822-1-LR was revised to show FIS-53 and
-66 in red for 54.4(a)(1).
Drawing 2-47E822-1-LR was revised to show FIS-53 and
-66 in red for 54.4(a)(1).
No changes are required to drawing 3-47E822-1-LR since FIS-53 and -66 were already red for 54.4(a)(1).
E-3 No changes are required to LRA Table 3.1.2.4 since fittings contain the material/environment combinations for the in-line FISs which provide a pressure boundary function.
System 69 changes Drawings 1-47E837-1-LR was revised to show FI-38,
-55, and -81 in blue for 54.4(a)(2).
Drawings 2-47E837-1-LR was revised to show FI-38,
-55, and -81 in blue for 54.4(a)(2).
Drawings 3-47E837-1-LR was revised to show FI-38,
-55, and -81 in blue for 54.4(a)(2).
No changes are required to LRA Table 3.3.2.21 since fittings contain the material/environment combinations for the in-line FIs which provide a pressure boundary function.
System 74 changes Drawing 1-47E811-1-LR was revised to show FIS-4, -15,
-27, and -38 in blue for 54.4(a)(2).
Drawing 2-47E811-1-LR was revised to show FIS-4, -15,
-27, and -38 in blue for 54.4(a)(2).
Drawing 3-47E811-1-LR was revised to show FIS-4, -15,
-27, and -38 in blue for 54.4(a)(2).
Add the following Material to page 3.2-8: Glass Add the information from the next page to Table 3.2.2.4 on page 3.2-50.
No other changes are required to LRA Table 3.1.2.4 since fittings contain the other material/environment combinations for the in-line FISs which provide a pressure boundary function.
E-4 ADDITIONS TO TABLE 3.2.2.4 Component Type Intended Function Material Environment Aging Effect Requiring Management Aging Management Program NUREG-1801, Vol. 2 Item Table 1 Item Notes Fittings PB Glass Treated water (internal)
None None V.D2.1-c None F,4,6 Fittings PB Glass Inside air (external)
None None V.E.1-b None F,4,6