Public Meeting Summary - Plant Performance and Planned Major Projects - Sequoyah
ML032040611
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/23/2003
From: Cahill S
Reactor Projects Region 2 Branch 6
To: Scalice J
Tennessee Valley Authority
References
Download: ML032040611 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET SW SUITE 23T85 ATLANTA, GEORGIA 30303-8931 July 23, 2003 Tennessee Valley Authority ATTN: Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- PLANT PERFORMANCE AND PLANNED MAJOR PROJECTS - SEQUOYAH DOCKET NOS.: 50-327, 50-328

Dear Mr. Scalice:

This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia, on July 9, 2003, at 10:00 a.m. The meetings purpose was to discuss Sequoyah plant performance and planned major projects. Enclosed are a list of attendees and the presentation handout used by your staff.

The discussions included the following topics: Plant Performance Summary, Steam Generator Replacement Outage, Equipment Reliability Improvement Plan, Corrective Action Program, and Licensing of the Dry Cask Storage Facility. The meeting was particularly informative and did not result in specific action items or decisions.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4520.

Sincerely,

/RA/

Stephen J. Cahill, Chief Reactor Projects Branch 6 Division of Reactor Projects

Enclosures:

1. List of Attendees
2. Handout - Sequoyah Nuclear Plant - Plant Performance Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc w/encls: (See page 2)

TVA 2 cc w/encls:

Karl W. Singer Ann Harris Senior Vice President 341 Swing Loop Nuclear Operations Rockwood, TN 37854 Tennessee Valley Authority Electronic Mail Distribution John D. White, Jr., Director Tennessee Emergency Management Jack A. Bailey, Vice President Agency Engineering and Technical Services Electronic Mail Distribution Tennessee Valley Authority Electronic Mail Distribution Distribution w/encls: (See page 3)

Richard T. Purcell Site Vice President Sequoyah Nuclear Plant Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Robert J. Adney, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority Electronic Mail Distribution Pedro Salas, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution D. L. Koehl, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution County Executive Hamilton County Courthouse Chattanooga, TN 37402-2801

TVA 3 Distribution w/encls:

M. Marshall, NRR RIDSNRRDIPMLIPB PUBLIC PUBLIC DOCUMENT (circle one): YES NO OFFICE DRP/RII SIGNATURE RCarrion:as NAME RPC DATE 7/ 23 /2003 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032040611.wpd

LIST OF ATTENDEES Nuclear Regulatory Commission L. Reyes, Regional Administrator, Region II (RII)

C. Casto, Division of Reactor Safety, RII L. Plisco, Director, Division of Reactor Projects (DRP), RII S. Cahill, Branch Chief, Reactor Projects Branch 6, DRP, RII S. Freeman, Senior Resident Inspector, Sequoyah Nuclear Plant B. Holbrook, Senior Resident Inspector, Browns Ferry Nuclear Plant S. Shaeffer, Senior Project Engineer, Reactor Projects Branch 6, DRP, RII M. Marshall, Project Manager, Sequoyah, Project Directorate II, NRR R. Taylor, NRC Intern D. Maspenaranda, NRC Intern R. Rodriguez, NRC Intern K. Harper, NRC Intern A. Vargas, NRC Intern Tennessee Valley Authority R. Purcell, Site Vice President D. Koehl, Plant Manager P. Salas, Licensing & Industry Affairs Manager C. Kent, Jr., Radiological & Chemistry Control Manager D. Lundy, Engineering Manager R. Rauser, Steam Generator Replacement Project Manager M. Gillman, Operations Manager M. Cooper, Engineering Supervisor - NSSS Enclosure 1