Partially Withheld Physical Security Insp Rept 50-483/89-03 on 890213-23 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers,Access Control,Personnel,Packages,Vehicles & Alarm Stations
ML20246P491
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/21/1989
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20246P484 List:
References
50-483-89-03, 50-483-89-3, NUDOCS 8903280231
Download: ML20246P491 (2)


Text

,

. <- *

.. ,

.

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-483/89003(DR$S)

Docket No. 50-483 License No. NPF-30 Licensee: Union Electric Company P. O. Box 149-Mail Code 400 St. Loui s, MO 63166 Facility Name: Callaway County Nuclear Power Station, Unit 1

..

Inspection Conducted: February 13-17, 1989 onsite February 22-23, 1989 in NRC Region III office Type of Inspection: Unannounced Physical Security Inspection i Date of Previous Physical Security Inspection: May 20-27, 1988 l

Inspector: b,i.bklo_ 3ht/89 G. L. Pirtle Date ,

Physical Security Inspector  !

Approved By: 3[#/[8 atnes R. Creed, Chief Date afeguards Section Inspection Summary Inspection on February 13-23, 1989 (Report No. 50-483/89003(DRSS))

Areas Inspected: Included Management Support; Protected and Vital Area Barriers; Access Control - Personnel, Packages, and Vehicles; Alarm Stations <

and Communications; Power Supply; Testing Maintenance and Compensatory Measures; and Followup on Previous Inspection Finding Results: The licensee viss found to be in compliance with NRC requirements within the areas examined, except as noted below:

Vital Area Barrier: A vital area access portal was not secured as required

'

by the security plan. The licensee's immediate corrective actions resolved the issue and a written response to the violation was not require Five previous open inspection findings were closed. Excessive compensatory measures were employed for a certain segment of the protected area alarm system. Some personnel were requested to be administered another psychological evaluation examination because of unresolved validity issues pertaining to the previously used psychological evaluation tes Enc!osure Contains

$$g32g@$$k $$8$ g3 EGliARDS INFORMATl0N p:n - Saration This

,

o Page is Decontrolled l

1 - _ _ _ _

..

-

- ,

, . . . . ,

, . .

The security force personnel were knowledgeable of their duties 'and responsibilities. The Quality Assurance Department continued to provide aggressive oversight of the security program and security operations were generally well manage (DETAILS - UNCLASSIFIED )