IR 05000483/1989012

From kanterella
Jump to navigation Jump to search
Partially Withheld Safeguards Insp Rept 50-483/89-12 on 890626-0707 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected Area Assessment Aids,Power Supply, Training & Qualification
ML20247C469
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/18/1989
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20247C458 List:
References
50-483-89-12, NUDOCS 8907240354
Download: ML20247C469 (1)


Text

_ - - - - _ _ - _

. - _ - _ _.

I

.

-

",

.

...,

j

...

.

U. S. NUCLEAR REGULATORY COMMISSION-

~

.;

,

RF.GION III l

' Report No'. 50-483/89012(DRSS)

.

Docket No. 50-483 License No. NPF-30

.j s

Licensee: Union Electric Company

)

P. O, Box 149 - Mail Code 400 St. Louis, MO 63166

,

d Facility Name:

Callaway County Nuclear Power _ Station, Unit 1 Inspection Conducted: June 26-29, 1989 onsite

)

July 6-7,1989 in NRC.Ragion-III Office j

Type of Inspection: U'nannounced Physical Security Inspection j

i Date of Previous Physical Security Inspection:

February 13-23, 1989

]

Inspector:

9 Orvrwf b 2As nfM1 /c7 7 /7/87 G. L! Pirtle

// -

'Date

Physical Security Inspector Approved By:

/

S$-

J4nes R. Creed, Chief Date i

'

SMeguardsSection

Inspection Summary i

,

J Inspection on June 26 through July 7, 1989 (Re_gort No. 50-483/89012(DRSS))

'

Areas Inspected:

Included Management Support; Protected Area Assessment Aids; Power Supply; Training and Qualification; and Followup on previous-inspection findings

.

.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined. Three.of four previous inspection findings were closed. The licensee's progress'was adequate for the remaining previous l

inspection finding pertaining to reconfiguration of a portion of the; protected l

area fence.

More drills involving the. response ' team were requi. red and l

housekeeping within the Central Alarm Station complex required security _

management attention.

Security force requalification: training'was. conducted in an effective manner'and was well documented. -The Quality Assurance Department continued to provide aggressive oversight of the security program and security ' operations inspected were. generally wel1 managed.

Safe

~

operations were observed during weapon qualification conducted at the firing i

range.

(DETAILSy UNCLASSIFIED )

Enclosure Contains

]

.

. l e90724cas4 s9o719 Upon Separation This.

+

gR Anock socQ3 Page is Decontrolled l

-

-


N------------------------------------

- - - - - -

- - -

- -

a _ __