Text
' p r.ntc,u d
'o UNITED STATES E
. J
'n NUCLEAR REGULATORY COMMISSION
$ * ' 'h [$
/
REGION il o,
101 MARIETTA sT.. N W., sul'E 3100
'g
'%
j ATLANTA, GEORGI A 30303
.....
Report No. 50-395/79-21 Licensee:
South Carolina Electric and Gas Company Columbia, South Carolina 29218 Facility Name:
Virgil C. Sumer Docket No.
50-395 License No. CPPR-94 Inspection at Virgil C. Sumer ite near Winnsboro, South Carolina Inspector:
I J. L. Skolds E87f Date Signed Accompanying Perso e.
J. p.; Allen Approved by:
1/
P.JFK gg,T h o_n Chief, RONS Branch f /</ //
Date Signed SUMMARY Inspection on June 18-20, 1979 Areas Inspected This routine, unannounced inspection involved 18 inspector-hours onsite in the areas of overall preoperational test program review and current plant operations and status.
Results Of the two areas inspected, no apparent items of noncompliance or deviations were identified.
7908230sse
.
9Aaz8
.
DETAILS 1.
Persons Contacted Licensee Employees H. T. Babb, General Manager, Nuclear Operations and System Planning
- S. J. Smith, Maintenance Supervisor
- J. G. Connelly, Startup Supervisor K. E. Beale, Health Physics Supervisor
- S. Smith, QA Supervisor, Civil and Operations
- P. Fain, QC Inspection Coordinator Other Organizations Systems Coordination Incorporated Earl Porter Steve Scearce
- Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on June 20, 1979, with those person, indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Overall Preoperational Test Program Review The inspector discussed the status of the plant and the startup program with various members of the licensee organization. The program for scheduling of events in order to meet certain startup milestones was reviewed as well as the current status of various systems and tests. The program for keeping track of Deficiency Notices, Non-conformance Notices, Construction Work Requests and Startup Field Reports was reviewed with personnel from Systems Coordination Incorporated (SCI).
The method of turning over systems from Daniels Construction Company to the licensee was reviewed. It was determined that once a system is turraa over to the licensee's startup organization the Operational QA Program is applica-ble to that system.
It was also determined that the Startup Organization performs any QC functions when initially testing the systems (i.e., flushes, etc.) af ter turnover.
7/4329
<
.
2-6.
Plant Tours The inspector toured the entire site and observed general plant conditions.
The inspector toured the Fuel Handling Building to ensure compliance with the Special Nuclear Material license issued under 10 CFR Part 70. Specifi-cally the following areas were observed:
Special Nuclear Material specific storage requirements
-
Integrity of security controls
-
Control of environment in the fuel storage area
-
-
Radiological controls Within the areas inspected, no items of noncompliance or deviations were disclosed.