Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335-08-001 and 05000389-08-001)
ML080630315
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
References
IR-08-001
Download: ML080630315 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Dear Mr. Stall:

On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

FP&L 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)

cc w/encl: (See page 3)

Distribution:

Normal distribution list

_________________________

OFFICE RII:DRP RII:DRP SIGNATURE MDS1 JDH4 NAME MSykes JHamman DATE 03/03/2008 03/03/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FP&L 3 cc w/encl: William A. Passetti Gordon L. Johnston Bureau of Radiation Control Site Vice President Department of Health St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution Craig Fugate Christopher R. Costanzo Director Plant General Manager Division of Emergency Preparedness St. Lucie Nuclear Plant Department of Community Affairs Electronic Mail Distribution Electronic Mail Distribution Bill Parks J. Kammel Operations Manager Radiological Emergency Planning St. Lucie Nuclear Plant Administrator Electronic Mail Distribution Department of Public Safety Electronic Mail Distribution Terry L. Patterson Licensing Manager Douglas Anderson St. Lucie Nuclear Plant County Adminstrator Electronic Mail Distribution St. Lucie County 2300 Virginia Avenue Rajiv S. Kundalkar Ft. Pierce, FL 34982 Vice President Nuclear Technical Services Mano Nazar Florida Power & Light Company Senior Vice President Electronic Mail Distribution and Nuclear Chief Operating Officer Florida Power & Light Company Don E. Grissette Electronic Mail Distribution Vice President Nuclear Training and Performance Improvement Florida Power & Light Company Electronic Mail Distribution Seth B. Dunston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

FP&L 4 Letter to J. from Marvin D. Sykes dated March 3, 2008.

SUBJECT: ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Distribution w/encl:

C. Evans, RII (Part 72 Only)

L. Slack, RII OE Mail (email address if applicable)

INPO ROP Reports RIDSNRRDIRS PUBLIC B. Mozafari, NRR

Page 1 of 2 Saint Lucie 03/03/2008 13:23:57 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 1, 2 IP 71152B Identification and Resolution of Problems 05/26/2008 05/30/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 06/30/2008 07/03/2008 Not Applicable PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP 71152B Identification and Resolution of Problems 07/07/2008 07/11/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 07/21/2008 07/25/2008 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 07/21/2008 08/01/2008 Not Applicable PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 Baseline Inspections EB3ISI - U1 ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 Baseline Inspections EB3SGISI - UNIT 1 SGISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/20/2008 10/24/2008 Baseline Inspections EB3TI172 - TI-172 1 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio STL TFPI - TFPI INSP 7 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 01/26/2009 01/30/2009 Baseline Inspections 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 02/09/2009 02/13/2009 Baseline Inspections PSB1EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 71151 Performance Indicator Verification 02/09/2009 02/13/2009 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Saint Lucie 03/03/2008 13:23:57 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/27/2009 05/01/2009 Baseline Inspections EB3ISI - UNIT 2 ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.