Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335-08-001 and 05000389-08-001)
ML080630315
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
References
IR-08-001
Download: ML080630315 (7)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Dear Mr. Stall:

On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

FP&L

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16

Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)

cc w/encl: (See page 3)

Distribution:

Normal distribution list

_________________________

OFFICE RII:DRP RII:DRP

SIGNATURE MDS1 JDH4

NAME MSykes JHamman

DATE 03/03/2008 03/03/2008

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FP&L

cc w/encl:

Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution

Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Bill Parks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Rajiv S. Kundalkar Vice President Nuclear Technical Services Florida Power & Light Company Electronic Mail Distribution

Don E. Grissette Vice President Nuclear Training and Performance Improvement Florida Power & Light Company Electronic Mail Distribution

Seth B. Dunston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution

M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution

Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution

Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution

Douglas Anderson County Adminstrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982

Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company Electronic Mail Distribution

FP&L

Letter to J. from Marvin D. Sykes dated March 3, 2008.

SUBJECT:

ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Distribution w/encl:

C. Evans, RII (Part 72 Only)

L. Slack, RII OE Mail (email address if applicable)

INPO ROP Reports RIDSNRRDIRS PUBLIC B. Mozafari, NRR

Saint Lucie Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 13:23:57 Report 22

PI&R

- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 05/26/2008 05/30/2008 1, 2 71152B IP

OL EXAM

- INITIAL EXAM PREP Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 06/30/2008 07/03/2008

V23284

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 07/07/2008 07/11/2008 1, 2 71152B IP Baseline Inspections Identification and Resolution of Problems 07/21/2008 07/25/2008 1, 2 71152B IP

OL EXAM

- INITIAL EXAM Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 07/21/2008 08/01/2008

V23284

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 1, 2 7112101 IP

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 1, 2 2515/171 IP

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 1, 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/08/2008 09/12/2008 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 1, 2 71151-PR01 IP

EB3ISI

- U1 ISI Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008

7111108P IP

EB3SGISI

- UNIT 1 SGISI Baseline Inspections Inservice Inspection Activities - PWR 10/20/2008 10/24/2008

7111108P IP

EB3TI172

- TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 1, 2 2515/172 IP

STL TFPI

- TFPI INSP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

01/26/2009 01/30/2009 1, 2 7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

02/09/2009 02/13/2009 1, 2 7111105P IP

PSB1EP

- EP INSP EP Baseline Inspection Alert and Notification System Testing 02/09/2009 02/13/2009 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 1, 2 7111405 IP Baseline Inspections Performance Indicator Verification 02/09/2009 02/13/2009 1, 2 71151 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Saint Lucie Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 13:23:57 Report 22

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 1, 2 7112101 IP

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/27/2009 05/01/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 1, 2 7112202 IP Baseline Inspections Performance Indicator Verification 04/27/2009 05/01/2009 1, 2 71151 IP

EB3ISI

- UNIT 2 ISI Baseline Inspections Inservice Inspection Activities - PWR 05/04/2009 05/08/2009

7111108P IP

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 05/11/2009 05/15/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 05/11/2009 05/15/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 1, 2 7112202 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.