IR 05000335/2006001

From kanterella
(Redirected from IR 05000389/2006001)
Jump to navigation Jump to search
Inspection/ Activity Plan - St. Lucie Nuclear Plant (NRC Inspection Report 05000335/2006001 and 05000389/2006001)
ML060610187
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML060610175 List:
References
IR-06-001
Download: ML060610187 (2)


Text

Page 1 of 2 Saint Lucie 03/02/2006 10:34:09 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 1 V23256 ST. LUCIE/MARCH 2006 EXAM AT POWER FACILITIES 02/27/2006 03/03/2006 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23256 ST. LUCIE/MARCH 2006 EXAM AT POWER FACILITIES 03/20/2006 03/31/2006 Not Applicable EB3-ISI - U2 INSERVICE INSPECTION 3 2 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 05/15/2006 05/19/2006 Baseline Inspections DRP-PIR - PI&R PRE-INSP VISIT 1 1, 2 IP 71152B Identification and Resolution of Problems 06/26/2006 06/29/2006 Baseline Inspections DRP-PIR - PI&R 6 1, 2 IP 71152B Identification and Resolution of Problems 08/07/2006 08/11/2006 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/21/2006 08/25/2006 Baseline Inspections EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT 4 1, 2 IP 7111105T Fire Protection [Triennial] 09/05/2006 09/07/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 10/16/2006 10/20/2006 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/10/2006 10/11/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 10/30/2006 11/03/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/30/2006 11/03/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 01/08/2007 01/12/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedure Page 2 of 2 Saint Lucie 03/02/2006 10:34:09 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/26/2007 03/02/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/09/2007 04/13/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/09/2007 04/13/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 93812 Special Inspection 04/22/2007 04/27/2007 Event Response Insp OL RQ - LICENSED OPERATOR REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 09/10/2007 09/14/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.