IR 05000327/1979001

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/79-01 on 790102-05.No Noncompliance Noted
ML19282A846
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/15/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19282A847 List:
References
NUDOCS 7903070183
Download: ML19282A846 (2)


Text

.,.

UNITED STATES

  1. ga at0

NUCLEAR REGULATORY COMMISSION 6C @ 7 o,,

REGION 11 o

101 MARIETTA STREET, N.W.

,t

'*

ATLANTA, GEORGI A 30303 o

  • %,,,,*

JAN 151979 In Reply Refer To:

RII:PKV 50-327/79-01 Tennessee Valley Authority ATTN:

Mr. N. B. Hughes Manager of Power 830 Power Building Chattanooga, Tennessee 37401 Gentlemen:

This refers to the inspection conducted by Mr. P. K. VanDoorn of this office on January 2-5, 1979 of activities authorized by NPC License No. CPPR-72 for the Sequoyah Nuclear Plant, Unit I facility, and to the discussion of our findings held with Mr. W. E. Andrews at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

.

7903070183

.

J A k' ' 5 1975 Tennessee Valley Authority-2-

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, Charles E. Mdfp Chief Reactor Construction and Engineering Support Branch Enclosure:

Inspection Report No. 50-327/79-01 cc w/ enclosure:

Mr. J. E. Gilleland Assistant Manager of Power 830 Power Building Chattanooga, Tennessee 37401 Mr. G. G. Stack, Project Manager Sequoyah Nuclear Plant Post Office Box 2000 Daisy, Tennessee 37319 Mr. J. M. Ballentine Plant Superintendent Sequoyah Nuclear Plant Post Office Box 2000 Daisy, Tennessee 37319 Mr. J. F. Cox 400 Commerce Street W9D214 Knoxville, Tennessee 37902

,

I