IE Insp Rept 50-327/79-18 on 790306-08.No Noncompliance Noted.Major Areas Inspected:Fire Protection & Prevention Procedures
ML19289F577
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/22/1979
From: Bradford W, Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19289F576 List:
References
50-327-79-18, NUDOCS 7906150052
Download: ML19289F577 (4)


Text

.,

.

.

_..

__ _.

tAS#800 UNITED STATES

  1. p
  1. o,,

NUCLEAR REGULATORY COMMISSION

.

[

REGION il o

$

101 MARIETTA STREET N.W.

ATLANTA, GEORGIA 30303

\\...../

Report No. 50-327/79-18 Licensee: Tennessee Valley Authority 500A Chestnut Street Tower II Chattanooga, Tennessee 37402 Facility Name: Sequoyah Nuclear Plant, Unit 1 Docket No. 50-327 License No. 50-327 Inspection at Sequoyah site near Chattanooga, Tennessee Inspector:

/72 -

3 2/L 7[

D4te Signed

[

W. H. Br

"

J?d Approved by:

'

on Chier, RONS Branch D4te Signed

P. J.

SUMMARY Inspection on March 6-8, 1979 Areas Inspected This routine unannounced inspection involved 22 inspector-hours onsite in the areas of fire protection and prevention programs and plant tour.

Results Of the 3 areas inspected, no apparent items of noncompliance or deviations were identified.

2229 005 790615005/2

. :,..

.

DETAILS 1.

Persons Contacted Licensee Employees

  • J. M. Ballentine, Plant Superintendent Walter Popp, Assistant Plant Superintendent
  • Walter E. Andrews, QA Supervisor Jim Doty, Maintenance Supervisor i
  • E. A. Craigge, Safety Engineer Walter Guinn, Operations Supervisor Dan Record, Assistant Operations Supervisor
  • Attended exit interview.

2.

Exit Interview The inspection scope and findings were summarized on March 8, 1979, with those persons indicated in Paragraph I above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items None identified.

5.

Fire Protection and Prevention The inspector reviewed the licensee's fire protection and prevention a.

program to verify that administrative controls had been established and included the following requirements:

periodic audits will be performed as per the requirements of

-

the proposed technical specifications; indoctrination of contractor personnel and offsite licensee

-

personnel who work on site in fire protection, fire prevention and the appropriate administrative procedures; that fire brigade members are qualified by training and physical

-

examinations; that actions to be taken by the individual discovering, and

-

reporting the fire, ard subsequent actions by the control room operator had been identified; 2229 006

7..__...____..

_ _..

.

-2-that functional responsibilities and lines of communication

-

for the onsite and offsite organiations res-sible for fire protection and prevention activities had been luentified.

b.

The Administrative Procedures for the control of combustibles were reviewed to verify that:

the use of combustible, flammable or explosive material in

-

safety-related areas requires special authorization; the storage of combustible, flammable or explosive material in

-

safety-related areas is prohibited;

-

all waste, debris, oil spills or other combustibles are required to be removed following work completion or at the end of each shift; all wood used in safety-related areas will be treated with

-

flame retardant;

-

a periodic inspection for control of combustibles is required; special authorization for activities: involving welding, open

-

flame, or other ignition sources is required; smoking in safety-related areas is prohibited except where

-

specifically designated.

Fire fighting procedures were reviewed to verify that:

c.

-

fire brigade actions are identified;

-

fire fighting activities with offsite fire departments is coordinated; instructions and actions in fire emergencies for plant personnel

-

is defined.

d.

Fire brigade training requirements and training records were reviewed to verify that announced and unannounced fire drills were required; that at least one drill per year was performed on the back shift; and that offsite fire departments participate in at least one annual drill.

The inspector reviewed the results of the latest fire inspection e.

conducted by the offsite fire inspection organization conducted in July, 1978 and the licensee response with corrective actions, dated August, 1978.

2229 007

.

\\

-3-f.

The inspector toured various areas of the facility to observe operations in progress, to inspect the general state of cleanliness, housekeeping and fire protection / prevention systems and conditions.

g.

The inspector used one or more of the following acceptance criteria for the above items:

Proposed Technical Specifications

-

Appendices A and B of 10 CFR 50

-

Regulatory Guide 1.120, " Fire Fighting (Rules for Nuclear

-

Power Plants)"

-

Regulatory Guide 1.39, " Housekeeping Requirement for Water-Cooled Nuclear Power Plants" Section 3.2.3 of ANSI N45.2

-

-

Section 6 of Appendix A to Regulatory Guide 1.33.

Within the areas inspected no deviations or items of noncompliance were identified.

The inspector determined in the review of the administrative controls in section 5 - A above, that the administrative procedures do not appear to adequately address the indoctrination of all contractor personnel and offsite licensee personnel, who work onsite, in the appropriate admini-strative procedures which implement the fire protection program and the emergency procedures relative to fire protection and fire prevention.

The licensee stated in the exit interview that they were not aware that this area was not adequately covered in the administrative procedures but that this area would be reviewed and that appropriate steps would be taken to insure that this area is covered. This iter. is designated as open item no. 79-18-01 and will be reinspected on a subsequent inspection.

2229 008

.

-

.

'

-

--

.;

.

l

. -

,

.

.

.

TMI DOCUMENTS

.

.

N!

DOCUMENT NO:

-

.-

b!fT!'

0F MCUMENT PROMG M COPY MADE ON METROPOLITAN EDISON COMPANY.

.

.

>

.

%-

.

-

tt/4Ax

~

'

-

b Wilda R. Mull, nix, NRC

_

,

r-

.

.

,

p

.

,

.

.

.

7 9 0 615.0 05Y

-

.

.

.

.

-

.

-

2229 009 s se

.

O

.

.

.

.

-

.

O

.

a

e UNITED STATES I

,

/gt * *' Coq [$

NUCLEAR REGULATORY COMMISSION f.k4f

'.$

REGION I

.

631 PARK AVENUE

  • 'E -

g KING OF PRUSSI A PENNSYL.VANI A 19406

  • qr,

,

  • ...+

May 18, 1979

..

.

MEMORANDUM FOR:

File Dale E. Donaldson, Radiation Specialist FROM:

NTC IE Investigation Team O

SUBJECT:

TELECON WITH R. FRIESS, DOE-RAP On 5/18/79, the undersigned contacted Mr. Robert Friess, DOE-RAP (Brookhaven National Laboratories) to verify their receipt of notifica-tions from Metropolitan Edison regarding the 3/28/79 incident. DOE

' logs indicated the following:

0710 R. Bettsel, TMI, called to report a Site Emergency - loss of normal feedwater and a primary to secondary leak 0735 TMI called to report General Emergency

'

A Dale E. Donaldson Radiation Specialist i

I (,'

l

-

h 2229 010 L

.

h

k

-