IE Insp Rept 50-372/79-01 on 790102-05.No Noncompliance Noted.Major Areas Inspected:Preservice Insp Program, Procedures,Work Activities & Records
ML19282A849
Person / Time
Site: 05000372
Issue date: 01/12/1979
From: Conlon T, Vandoorn P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19282A847 List:
References
50-372-79-01, 50-372-79-1, NUDOCS 7903070188
Download: ML19282A849 (5)


Text

.

e UNITED STATES (p " 88%gjo,,

NUCLEAR REGULATORY COMMISSION

.

REGION ll g

)g g

  • -

s.

E 101 M ARIETTA STRE ET. N.W.

ATLANTA, GEORGI A 30303 o,s,..v.../

Report No.:

50-327/79-01 Licensee: Tennessee Valley Authority 830 Power Building Chattanooga, Tennessee 37401 Facility Name: Sequoyah Nuclear Plant, Unit 1 Docket No.: 50-327 License No.:

CPPR-72 Inspection at: Sequoyah Nuclear Plant, Daisy, Tennessee TVA Central Offices, Chattanooga, Tennessee Inspector:

/

f,';. _

//< -/,T e P'. K. VanDo~orn, Metallurgical Engineer Date Signed Reviewed by:

,/

.ks

///t /7 4

.

,

T. E. Conlon, Chief, ES/-2, $ &ES Branch Date Signed Inspection Summary Inspection on January 2-5, 1979 (Report No. 50-327/79-01)

Are.as Inspected:

Routine, unannounced inspection of preservice inspection program, procedures, work activities and records. The inspection involved 26 inspector-hours on-site and at the TVA central offices by one NRC inspector.

Results: No apparent items of noncompliance or deviations were identified.

79030701F8

>

.

.

RII Rpt. No. 50-327/79-01-1-1.

Persons Contacted a.

Tennessee Valley Authority (TVA)

J. M. Ballentine, Power Plant Superintendent

  • W. E. Andrews, QA Staff Supervisor E. F. Harwell, Supervisor, Metallurgy and NDT Section, Office of Power C. R. Crevass, Office of Power Quality Assurance Manager T. B. Lee, Office of Power Quality Audits Supervisor R. L. Hamilton, QA Engineer
  • C. R. Brimer, Outage Director
  • K. E. Vanhorn, Engineering Aid R. H. Daniels, Level III Examiner J. L. Goodner, Engineering Aid b.

Contractor Organization Lambert, MacGill and Thomas, Inc. (LMT)

E. L. Thomas, Preservice Inspection Supervisor

  • Denotes those present at the Exit Interview.

2.

Licensee Actions on Previous Inspection Findings Licensee actions on previous inspection findings were not inspected.

3.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable or may involve noncompliance or deviations. One unresolved item disclosed during the inspection is discussed in paragraph 6.

4.

Exit Interview The inspection scope and findings were summarized with those persons indicated by an asterisk in paragraph I above.

The unresolved item described in paragraph 6 below was discussed in detail.

5.

Independent Inspection Effort The inspector observed a portion of the 60 degree shear wave ultrasonic testing (UT) of Steam Generator No. 2 tube sheet weld no. SGW-A2 to determine if code and procedure requirements were being met.

The applicable code for preservice inspection (PSI) is the ASME Boiler the Pressure Vessel Code Section XI, 1974 edition plus' addenda through the

RII Rpt. No. 50-327/79-01-2-Summer of 1975.

The applicable procedure was LMT-UT-2, Revision 11.

Areas reviewed included:

type of equipment used, including frequency, linearity, extent of coverage (beam / angle) provided, size of transducer; scanning technique; calibration methods; DAC curve; and, method of recording and evaluating indications.

No items of noncompliance or deviations were identified.

6.

Preservice Inspection-Review of Program The applicable code for PSI is identified in paragraph 5.

TVA has contracted with LMT for performance of manual UT inspection for PSI and Southwest Research, Inc. (SwRI) for reactor vessel inspections. The TVA central of fice Power Plant Maintenance Branch of the Division of Power Production is assigned responsibility for preparation and administration of the PSI program and provides personnel to perform the functions of the Authorized Inspector.

Plant QA staff provide surveillance of PSI activities and the independent audit function is provided by the central office QA and Audit Staff of the Office of Power.

The Sequoyah Operations QA Manual contains the TVA QA requirements applicable to PSI.

Records requirements are contained in Sequoyah administrative instruction AI-7, Revision 7.

Other documents containing QA program requirements are as follows: LMT QA Manual; SwRI QA Manual; Office of Power QA Manual audit section and Quality Assurance Plan; Office of Power QAAS Procedures 3.1, Revision 3 (" Quality Program Audits"),

3 2, Revision 2 (" Quality Program Audit Planning") and 4.1, Revision 0 ("QA Training Prcgram"); TVA liquid penetrant test procedure SQ-PT-1, Revision 0; and TVA procedure titled (no number), " Duties of NDE Inspector-Division of Power Production".

The inspector reviewed the above documents to determine if requirements were met for providing controls in the following areas (as applicable):

organization structure and QA personnel including qualifications, respon-sibilities, duties and indoctrination / training of QA personnel; audit procedures / checklists; scope and purpose of audits being performed; audit schedules (the inspector verified that an audit was scheduled of the Sequoyah PSI); qualifications and responsibilities of auditors; establishment of general quality requirements applicable to PSI; proce-dure / program control; identification components and systems covered by PSI; establishment of appropriate PSI procedures; control of corrective actions; control of the QA manual; document control; control of records including examination results, equipment lists and certifications, calibration data, calibration block data, personnel qualifications, drawings and weld lists; and control of records storage.

>

i RII Rpt. No. 50-327/79-01-3-The Sequoyah Operations QA Manual, Part III, Section 7.2, dated January 21, 1977 requires that, "The identification of significant conditions adverse to quality, the cause of the condition, and the corrective action taken shall be documented".

TVA informed the inspector that conditions such as performance of UT inspection with equipment out of calibration, expiration of personnel qualification, use of inadequate technique, etc., are normally corrected without formal documentation.

It could not be determined during the time of this inspection if any conditions such as those exampled above had been found by TVA at Sequoyah which should have been documented but were not.

Further review is needed to determine if any of these types of con-ditions have been found at Sequoyah and to what extent formal documentation is necessary for the PSI program. This is unresolved item number 327/79-01-01.

No items of noncompliance or deviations were identified.

7.

Preservice Inspection-Review of Procedures The applicable code for PSI is identified in Paragraph 5.

The inspector reviewed the TVA liquid penetrant (PT) test procedure SQ-PT-1, Revision 0 to determine if PT was adequately controlled and code requirements were delineated.

The following areas were considered in the review:

method consistent with ASKE Code; identification of brand names and specific types of materials; control of sulfur and halogens in materials; surface preparation; control of technique such as cleaning, drying, penetrant application, dwell time, surface temperature, penetront removal, application of developer and evaluation; and, qualification of procedure and personnel.

No items of noncompliance or deviations were identified.

8.

Preservice Inspection-Data Review and Evaluation The applicable code for PSI is identified in Paragraph 5.

The inspector reviewed the temporary filing system for manual UT inspection records and reviewed UT records for six pipe welds to determine if requirements were being met. Areas reviewed included examination results, equipment data, calibration data, identification of couplant, chart recordings, evaluation of findings and disposition, extent of inspection, deviations f rom normal procedure, calibration re-verification, accurate recording of indications, record reviews and control of records storage.

>

.

RII Rpt. No. 50-327/79-01-4-Records for the following welds were reviewed:

Weld No.

Size UT Report No.

S1S-237 6"

R-025 SIF-120 6"

R-029 S1S-224 8"

R-060 S1S-242 10" R-298 RC-12 31" R-681 RC-15S1 27.5" R-682 No items of noncompliance or deviations were identified.

,