o 101 MARIETTA ST., N.W., SUITE 3100 A1 LANTA, GEORotA 30303 o
.....
Report No. 50-327/79-57 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, Tennes. - 37401 Facility Name:
Sequoyah Unit 1 Docket No.
50-327 License No.
CPPR-72 Inspection at Sequoyah Site near Daisy, Tennessee
'
Inspected by:
6 /, ' fee.'. 4,-
/
/
.
.) (/
' -/
G. A. Belisle Date Signed
/;(
F-A (
Approved by:
'
'
H. C. Dance, Section Chief, RONS Date Signed SUMMARY Inspected on October 9 - October 11, 1979 Areas I wpected This routine, unannounced inspection involved 16 inspector-hours onsite in the areas of review of inspector identified items, followup on IE Circulars and a plant tour.
Results Of the three areas inspected, no apparent items of noncompliance or deviations were identified.
1504 092
%n o30 G S I
.
?
DETAILS 1.
Persons Contacted Licensee Employees
- W. F. Popp, Assistant Plant Superintendent
- W. E. Andrews, Quality Assurance Supervisor
- R. S. Kaplan, Captain, Public Safety Services
- J. T. Crittenden, Captain, Public Safety Services
- F. T. Bugher, Protection Specialist
- N. Lee, Protection Specialist
- G. W. Killian, Quality Assurance Coordinator Other Organizations
- K. H. Beseker, USNRC
- A. Tillman, USNRC
- S. D. Butler, USNRC NRC Resident Inspector
- W.
T. Cottle
- Attended exit interview 2.
Exit Interview The inspection scope and finding were summarized on 9/11/79 with those persons indicated in Paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Licensee Action on Previously Identified Inspector Followup Items The inspector reviewed licensee action on a previously identified item of concern through discussions with licensee personnel and verification of implementation of applicable corrective action.
(0 pen) Open Item (327/79-18-01) Include training in appropriate fire plans and procedures for offsite and temporary employees. The inspector reviewed 1504 093
.
-2-
revisions to SQA 13, Nuclear Plant Security - Employee and Visitor Identifi-cation - DPM No. N72A26, Visits to Licensed Nuclear Power Plants - DPM N76A6, and AI 14, Plant Training Program, that address training to be given prior to badging of offsite and temporary employees; however, there is no method of implementing specific trsining in fire plans and procedures required during badging. Until specific implementation is addressed this item remafns open.
6.
Review of lE Circulars The inspector reviewed IE circular 78-09 to determine that the licensee had received and routed this document to cognizant supervisors and that appro-priate action had been taken. This circular is closed.
7.
Plant Tour The inspector conducted a tour of Unit 1 spent fuel area, fuel receiving area, Residual Heat Removal and Core Spray pump and heat exchanger rooms, Auxiliary Feed Pump area, High Pressure Injection pump room, upper reactor compartments and control room. Housekeeping and general cleanliness were observed.
No items of noncompliance or deviations were identified.
1504 094