UNITED STATES pm at%q
[
jo,,
NUCLE AR REGULATORY COMMISSION
'
R EGION il
&
o 101 M ARIETTA STREET.N.W.
(
-j :-[
',
ATLANTA. CIORGI A 30303
'"
o,
%, * e s * * /
Report Nos. 50-327/79-23 and 50-328/79-12 Licensee:
Tennessee Valley Authority 500A Chestnut Street Chattanooga, Tennessee 37401 Facility Name: Sequoyah Nuclear Plant Units 1 and 2 Docket Nos.
50-327 and 50-328 License Nos. CFPR-72 and CPPR-73 Inspection at Se uoyah Nuclear Plant near Chattanooga, Tennessee
'/Sfh Inspector:
7./
a#v
~
v P. K VanDoorn
./
ate Signed Accompanying Perso 1:
L. Modenos (Training)
,
M-f ~,,,
G
[ / 7f Aoproved b'y:
/
T.E;fwlon,SectionChief,RC&ESBranch
/ aty Signed SUM W.Y inspection on April 10-12, 1979 Areas Inspected This rout.ce unannounced inspection involved 44 inspector-hours orsite in the areas of sai-ty related structures welding and welding records (Un:t 2);
safety related piping welding and welding records (Unit 2); followup inspec-tion of previous inspection findings and a licen.ee identified item (50.55(e))
in the area of preservice inspection (Unit 1).
Results Of the three areas inspected, no apparent items of noncompliance or deviations were identified.
/
d 285 317
.
'jTo7 050 g
--
-
--
,
.
s DETAILS 1.
Persons Contacted Licensee Employees
- G. G. Stack, Project Manager, Construction
- J. M. Ballentine, Plant Superintend-nt
- J.
E. Wilkins, Construction Engineer
- R. M. Pierce, Project Manager, Decirn
- J. M. Munns, Supervisor, Construction QA
- R. W. Farrell, Supervisor, QC Records Unit
- E. C. Pendergrass, QC Records Unit
- D. L. Cowant, QA Engineer, Power Production E. F. Harwell, Supervisor, Metallurgy and NDT Section, Office of Power G. L. Belew, Mechanical Engineer L. W. Jcaes, Supervisor, Welding Inspection Unit Other licensee employees contacted included 10 construction craftsmen and 6 technicians.
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on April 12, 1979, with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings a.
(Closed) Unresolved Item 50-327/78-41-01: Documentation of Special UT Process Used for RC Piping Inspection. TVA has revised the UT procedure applicable to this piping to include the special technique being employed.
This procedure has been issued. N-UT-1, Rev. 1,
" Ultrasonic Inspection of Nuclear Coolant System Piping". This documentation is adequate.-
b.
(Closed) Item of Noncompliance 50-327/78-41-03:
Failure to Provide Controle for Linearity Calibrations for UT of Ferritic Vessels 2 1/2 - Inch and Greater in Thickness.
The TVA report for this item was received by NRC on January 29, 1979.
TVA has revised the applicable procedure (Uf-2, Rev. 13) to include the calibration requirem-7ts. The inspector reviewed this procedure and it is adequate. Reviews by the inspector during previous inspection had indicated that the required calibrations had been performed for vessel inspections.
qdg)
) f f$
.-
,
.
.
-2-c.
(Closed) Item of Noncompliance 50-327/78-41-04: Failure to Follow Procedure for Calibration and Internal Alignment of UT Tester. The TVA report for this item was received by NRC on January 29, 1979.
TVA actions have included removing the affected equipment from use, performing a recalibration which vas satisfactory and reinstructing personnel. The inspector reviewed these acticas and the calibra-tion documentation and considers the actions taken to be adequate.
d.
(Closed) Unresolved Item 50-327/79-01-01: Documentation of Condi-tions Adverse to Quality. Significant conditions adverse to quality were not identified by TVA for the Sequoyah Unit 1 preservice inspection. However, TVA considers that fermal documentation of these conditions, when identified, is necessary.
TVA has prepared and approved (procedure not yet distributed at time of inspection)
procedure N-AI-1, Fev. 1
" Duties of the Authorized TVA Inspector -
TVA Nuclear Plants". This procedure provides for documentation of significant conditions adverse to quality.
The inspector reviewed the above procedure and considers it adequate.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort (Unit 2) The inspector conducted a general inspection of the Unit 2 a.
containment and auxiliary building areas to observe construction activities such as welding, material handling and control, house-keeping and storage.
b.
(Unit 1) The inspector conducted a followup inspection on inspector Followup Itee 50-327/78-33-01 - Verification of Adequate Weld Drawings for PSI /ISI Inspections. The inspector discussed the methods being employed to report and document discrepancies between weld isometrics and actual field conditions.
The inspector was informed-that no field conditions had been found that had not been previously approved.
The inspector reviewed newly prepared weld isometrics and determined that field conditions such as hanger interferences, location information and longitudinal and circumferential welds in pipe were identified. TVA actions are considered adequate and this item is closed.
c.
(Unit 1) The inspector conducted a followup inspection of Inspector Followup Item 50-327/79-06-01 - Disposition of UT Inaication for Weld RHRS-119.
TVA has removed a portion of a lug from one side of the weld and inspected the weld from this side which was not 285 319
-3-previously possible.
This inspection disclosed an indication similicr in amplitude and metal travel to that previously found.
The inspector reviewed this UT report. Since TVA has not yet decided on disposition of this indication, this itea remains opea.
d.
(Unit 2) The inspector observed field welding of safety-related piping outside the reactor coolant pressure boundary at various states of weld completion.
The applicable Code for safety-related pipe welding is the ANSI Standard B31.7, Ic69 edition and the 1970 addenda.
The inspector examined weld joints to determine; weld / welder identi-fication, qualified welder / weld procedure, use of specified weld material, proper interpass temperature and, where applicable, pre-beat and post-weld heat treatment and physical appearance of
'
weld b g.
starts, stops, undercut and surface imperfections).
The following welds were observed:
Joint No. Stage of Ccmpletion Observed OER04080 Intermediate Welding 2SE09264A Fitup 2SE09264B Fitup 2SE09264C Fitup 2SE09264D Root Welding 2CX00060-1 Intermediate Welding 2CX01008 Fitup 2CX01008B Fitup 2CC01715 Intermediate Welding 2CC01713 Intermediate Welding 2CC01712 Intermediate Welding 2CC01711 Intermediate Welding 2CC01710 Intermediate Welding 2CC01709 Intermediate Welding (Unit 2) The inspector observed post-weld stress relief heat treat-e.
ment of weld no.
2MS00030 to determine if procedure requirements were being met.
Within the areas inspected, no items of noncompliance or deviations were identified.
6.
Licensee Identified Items (50.55(e))(Unit 1)
(Open) Item 327/79-19-02: Reactor Vessel Closure Head Weld Indication.
This item was incially reported by telephone to Region II on February 16, 1979, as a possible 50.55(e) item. This item concerned the fact that a 285 3 L(9
-
.
.
-4-flaw was found in the closure head which exceeds the planer flaw size limits of ASME Section XI. Region II was subsequently informed that fracture mechanics analysis, an alternate method of evaluation allowed by ASME Section XI, had been performed and showed the flaw to be acceptable for e 40 year plant life.
The inspector reviewed this analysis and verified that normal conditious, emergency conitions, faulted conditions end irradiation effects (determined to be negligible in this case) were considered. This item will remain open, however, until it is verified that this fracture mechanics analysis has been officially forwarded to NRC as required by paragraph IWB-3125 of ASME Section XI.
7.
Safety Related Structures (Welding) - Observation of Work and Work Activities (Unit 2)
The inspector observe d field welding activitic ansiciated with safety related structures and supports outside containment during various states of weld completion. The applicable code is AWS DI.1, Rev. 2-74.
Observations were made in order to determine whether the requirements of applicable specifications, standards, work and/or inspection procedures are being met for the activities involved and in the following stages of weld completion:
a.
The inspector examined weld joint fitup, prior to welding, to determine whether weld identification / location, joint preparation and alignment and QC verification are in conformance with existing requirements.
Weld Joint Weld Map Structure / Support
WM0-B205 Main Steam Pipe Restraint
WM0-B205 Main Steam Pipe Restraint
WMO-B205 Main Steam Pipe Restraint b.
Observation of weld material control included; identification, issue slips and control of unused material at issue stations and work areas.
-
c.
During observation of weld activities there appeared te be a sufficient number of qualified inspection personnel at the work site.
Within the areas examin->d, there were no items of noncompliance or deviations identified.
'
0 E b ?'h)
.
.
.
-5-8.
Safety Related Structures (Welding) - Review of Quality Records (Unit 2)
The inspector reviewed the quality records described below relative to welding of safety related structures / supports outside the containment to determine whether these records reflected work accomplishment consistent with NRC requirements and SAR commitments. The applicable code for this welding is delineated in paragraph 7.
Areas specifically reviewed were welding surveillance records and visual inspection records (II-75 forms).
The Il-75's reviewed were 22A-HRVEPD104, 22A-HRWB15-3-N103-1, 22A-HRVWB37-N103-1, 22A-HRVWPD123, 22A-HRVWPD87, 22A-HRVW PD89, and 22A-HHRVWPD90. Each 17-75 represents multiple < elds and serves as the weld history and inspection record.
Within the areas inspected, there were no items of noncompliance or deviations identified.
9.
Safety Related Piping - Observation of Work and Work Activities (Unit 2)
The inspector observed non-welding work activities for safety related (SR) piping. The applicable code for installation of SR piping is delinated in paragraph 5.d.
The inspector observed handling of piping /
appurtenances for conformance to inspection / work procedures and installa-tion specifications / plans for the following welds:
2SE09264A, B, C and D; 2CX00060-1; 2CX01008; 2CX01008B and 2MS00029.
Within the areas examined, there were no items of noncompliance or deviations identified.
.
285 J?1