Category:INSPECTION REPORT
MONTHYEARIR 05000320/20240032024-11-21021 November 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2024003 IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 IR 05000320/20220042023-02-16016 February 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2022004 and 05000320/2022401 IR 05000289/20220022023-02-13013 February 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 – NRC Inspection Report Nos. 05000289/2022002 and 005000289/2022402 IR 05000289/20220012022-08-26026 August 2022 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report Nos. 05000289/2022001 and 07200077/2022001 ML22228A0142022-08-17017 August 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report IR 05000289/20224012022-04-12012 April 2022 NRC Security Decommissioning Inspection Report No. 05000289/2022401 IR 05000289/20210022022-01-31031 January 2022 NRC Inspection Report 05000289/2021002 and 07200077/2021001 IR 05000320/20210042022-01-27027 January 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021004 IR 05000289/20210012021-06-28028 June 2021 NRC Inspection Report No. 05000289/2021001, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20214012021-06-28028 June 2021 Security Decommissioning Inspection Report 05000289/2021401 IR 05000320/20210032021-06-22022 June 2021 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021003 IR 05000289/20200052021-02-0101 February 2021 NRC Inspection Report No. 05000289/2020005, Exelon Generation Co., LLC, Three Mile Island Nuclear Station Unit 1 IR 05000320/20200022020-10-19019 October 2020 Gpu Nuclear, Inc., Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report 05000320/2020002 IR 05000289/20204012020-09-0101 September 2020 Unit 1 - Security Baseline Inspection Report 05000289/2020401 IR 05000289/20200032020-07-20020 July 2020 NRC Inspection Report No. 05000289/2020003, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20200012020-04-30030 April 2020 NRC Inspection Report 05000289/2020001 IR 05000289/20190102020-02-0404 February 2020 NRC Inspection Report No. 05000289/2019010, Exelon Generation Co., LLC, Three Mile Island Unit 1, Middletown, PA IR 05000289/20190032019-11-0606 November 2019 Integrated Inspection Report 05000289/2019003 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20193012019-08-15015 August 2019 Initial Operator Licensing Examination Report 05000289/2019301 IR 05000289/20190022019-08-0909 August 2019 Integrated Inspection Report 05000289/2019002 IR 05000320/20190012019-06-10010 June 2019 Gpu Nuclear, Inc., Three Mile Island Station, Unit 2 - NRC Inspection Report 05000320/2019001 IR 05000289/20195012019-06-0303 June 2019 Emergency Preparedness Biennial Exercise Inspection Report 05000289/2019501 IR 05000289/20194102019-03-18018 March 2019 Baseline Security Inspection Report 05000289/2019410 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180042019-01-31031 January 2019 Integrated Inspection Report 5000289/2018004 IR 05000289/20182012018-12-13013 December 2018 NRC Inspection Report 05000289/2018201 IR 05000289/20180032018-11-0808 November 2018 Integrated Inspection Report 5000289/2018003 IR 05000289/20184102018-09-18018 September 2018 Baseline Security Inspection Report 05000289/2018410 (Letter Only) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20180022018-08-0202 August 2018 Integrated Inspection Report 5000289/2018002 IR 05000320/20180112018-05-23023 May 2018 NRC Inspection Report 05000320/2018011 IR 05000289/20180012018-05-0202 May 2018 Integrated Inspection Report 5000289/2018001 and Exercise of Enforcement Discretion IR 05000289/20180102018-05-0202 May 2018 Design Bases Assurance Inspection (Teams) Report 05000289/2018010 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170042018-01-25025 January 2018 Integrated Inspection Report 05000289-2017004 IR 05000289/20174052017-11-29029 November 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000289/2017405 (Cover Letter) IR 05000289/20170032017-10-25025 October 2017 Integrated Inspection Report 5000289/2017003 IR 05000289/20174032017-09-25025 September 2017 Baseline Security Inspection Report 05000289/2017403 (Cover Letter) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20170102017-08-25025 August 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Problem Identification and Resolution Cyber Security Inspection Report 05000387/2017405 and 05000388/2017405 (Cover Letter) IR 05000289/20173012017-08-23023 August 2017 Initial Operator Licensing Examination Report 05000289/2017301 2024-08-28
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls IR 05000289/19980061998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970091997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970071997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970041997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000320/20040281995-06-0505 June 1995 Insp Repts 50-335/95-05 & 50-389/95-05 on 950320-0428. Violations Noted.Major Areas Inspected:Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930231993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation IR 05000289/19930171993-08-17017 August 1993 Insp Rept 50-289/93-17 on 930802-06.No Violations Noted. Major Areas Inspected:Radiological & Nonradiological Chemistry Programs ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness ML20045G4861993-07-0202 July 1993 Insp Rept 50-289/93-12 on 930517-21.No Violations Noted. Major Areas Inspected:Response to 930207 Forced Intrusion Into Protected Area of TMI-1,contingency Drills,Safety/ Safeguards Interface & Land Vehicle Bomb Procedure IR 05000289/19930131993-06-30030 June 1993 Insp Repts 50-289/93-13 & 50-320/93-06 on 930511-0621.Formal Root Cause Analysis Being Performed.Major Areas Inspected: Plant Operations,Maint,Radiological Controls,Security & Engineering & Technical Support Activities IR 05000289/19930101993-06-21021 June 1993 Insp Rept 50-289/93-10 on 930518-20.No Violations Noted. Major Areas inspected:annual,full-participation Exercise IR 05000289/19930111993-05-21021 May 1993 Insp Repts 50-289/93-11 & 50-320/93-05 on 930328-0510. Violation Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000289/19930071993-04-15015 April 1993 Insp Rept 50-289/93-07 on 930222-26.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions on Previously Identified Edsfi Findings IR 05000289/19930091993-04-14014 April 1993 Insp Repts 50-289/93-09 & 50-320/93-03 on 930223-0327. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Surveillance,Security, Engineering & Technical Support Activities Re Plant Safety IR 05000289/19930061993-04-12012 April 1993 Insp Rept 50-289/93-06 on 930208-0319.No Violations Noted. Major Areas Inspected:Design Mod in Process & Completed, Corporate & Site Activities in Support of TMI-1 & Overall Communications Between Corporate & Site Engineering ML20035F0281993-04-0808 April 1993 Insp Rept 50-320/93-04 on Stated Date.Violations Noted.Major Areas Inspected:Radwaste Shipment 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000320/20240032024-11-21021 November 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2024003 IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 IR 05000320/20220042023-02-16016 February 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2022004 and 05000320/2022401 IR 05000289/20220022023-02-13013 February 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 – NRC Inspection Report Nos. 05000289/2022002 and 005000289/2022402 IR 05000289/20220012022-08-26026 August 2022 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report Nos. 05000289/2022001 and 07200077/2022001 ML22228A0142022-08-17017 August 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report IR 05000289/20224012022-04-12012 April 2022 NRC Security Decommissioning Inspection Report No. 05000289/2022401 IR 05000289/20210022022-01-31031 January 2022 NRC Inspection Report 05000289/2021002 and 07200077/2021001 IR 05000320/20210042022-01-27027 January 2022 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021004 IR 05000289/20210012021-06-28028 June 2021 NRC Inspection Report No. 05000289/2021001, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20214012021-06-28028 June 2021 Security Decommissioning Inspection Report 05000289/2021401 IR 05000320/20210032021-06-22022 June 2021 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2021003 IR 05000289/20200052021-02-0101 February 2021 NRC Inspection Report No. 05000289/2020005, Exelon Generation Co., LLC, Three Mile Island Nuclear Station Unit 1 IR 05000320/20200022020-10-19019 October 2020 Gpu Nuclear, Inc., Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report 05000320/2020002 IR 05000289/20204012020-09-0101 September 2020 Unit 1 - Security Baseline Inspection Report 05000289/2020401 IR 05000289/20200032020-07-20020 July 2020 NRC Inspection Report No. 05000289/2020003, Exelon Generation Co., LLC, Three Mile Island Nuclear Station, Unit 1 IR 05000289/20200012020-04-30030 April 2020 NRC Inspection Report 05000289/2020001 IR 05000289/20190102020-02-0404 February 2020 NRC Inspection Report No. 05000289/2019010, Exelon Generation Co., LLC, Three Mile Island Unit 1, Middletown, PA IR 05000289/20190032019-11-0606 November 2019 Integrated Inspection Report 05000289/2019003 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20193012019-08-15015 August 2019 Initial Operator Licensing Examination Report 05000289/2019301 IR 05000289/20190022019-08-0909 August 2019 Integrated Inspection Report 05000289/2019002 IR 05000320/20190012019-06-10010 June 2019 Gpu Nuclear, Inc., Three Mile Island Station, Unit 2 - NRC Inspection Report 05000320/2019001 IR 05000289/20195012019-06-0303 June 2019 Emergency Preparedness Biennial Exercise Inspection Report 05000289/2019501 IR 05000289/20194102019-03-18018 March 2019 Baseline Security Inspection Report 05000289/2019410 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180042019-01-31031 January 2019 Integrated Inspection Report 5000289/2018004 IR 05000289/20182012018-12-13013 December 2018 NRC Inspection Report 05000289/2018201 IR 05000289/20180032018-11-0808 November 2018 Integrated Inspection Report 5000289/2018003 IR 05000289/20184102018-09-18018 September 2018 Baseline Security Inspection Report 05000289/2018410 (Letter Only) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20180022018-08-0202 August 2018 Integrated Inspection Report 5000289/2018002 IR 05000320/20180112018-05-23023 May 2018 NRC Inspection Report 05000320/2018011 IR 05000289/20180012018-05-0202 May 2018 Integrated Inspection Report 5000289/2018001 and Exercise of Enforcement Discretion IR 05000289/20180102018-05-0202 May 2018 Design Bases Assurance Inspection (Teams) Report 05000289/2018010 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170042018-01-25025 January 2018 Integrated Inspection Report 05000289-2017004 IR 05000289/20174052017-11-29029 November 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000289/2017405 (Cover Letter) IR 05000289/20170032017-10-25025 October 2017 Integrated Inspection Report 5000289/2017003 IR 05000289/20174032017-09-25025 September 2017 Baseline Security Inspection Report 05000289/2017403 (Cover Letter) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20170102017-08-25025 August 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Problem Identification and Resolution Cyber Security Inspection Report 05000387/2017405 and 05000388/2017405 (Cover Letter) IR 05000289/20173012017-08-23023 August 2017 Initial Operator Licensing Examination Report 05000289/2017301 2024-08-28
[Table view] Category:UTILITY
MONTHYEARIR 05000289/19900801990-10-0303 October 1990 Safety Insp Rept 50-289/90-80 on 900911-13.Exercise Weaknesses Noted.Major Areas Inspected:Licensee Annual & partial-participation,emergency Preparedness Exercise Conducted on 900911-13 IR 05000289/19900161990-08-23023 August 1990 Insp Repts 50-289/90-16 & 50-320/90-07 on 900806-10.No Violations Noted.Major Areas Inspected:Radiological Controls Program,Including Corrective Actions Re NRC Followup Items, Organization & Staffing & Applied Health Physics IR 05000289/19900101990-06-22022 June 1990 Insp Rept 50-289/90-10 on 900507-11.Violation Noted.Major Areas Inspected:Licensee Implementation of Reg Guide 1.97, Rev 3 Re post-accident Monitoring Instrumentation IR 05000289/19900081990-06-15015 June 1990 Safety Insp Rept 50-289/90-08 on 900404-0515.No Violations Noted.Major Areas Inspected:Power Operations,Including Plant Operations,Maint/Surveillance,Radiological Practices, Security Measures & Engineering Support Activities IR 05000320/19900031990-06-14014 June 1990 Insp Rept 50-320/90-03 on 900303-0515.Licensee Identified Violation Noted.Major Areas Inspected:Decontamination & Defueling Activities,Review of Safe Fuel Mass Limit Analysis & Procedures Rept & LER 90-01 IR 05000289/19900111990-06-0101 June 1990 Insp Rept 50-289/90-11 on 900503-15.No Violations Noted. Major Areas Inspected:Design,Design Changes & Mods, Installation & Testing of Mods,Onsite & Corporate Engineering Interface & Staffing & Mgt Support IR 05000320/19900041990-05-16016 May 1990 Insp Rept 50-320/90-04 on 900319-23.No Violations,Deviations or Unresolved Items Identified.Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures,Emergency Preparednesss Program & Emergency Response Facilities IR 05000289/19900071990-05-15015 May 1990 Safety Insp Rept 50-289/90-07 on 900319-23.No Violations, Deviations or Unresolved Items Noted.Major Areas Inspected: Licensee Emergency Preparedness Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000289/19900091990-05-0808 May 1990 Partially Withheld Insp Rept 50-289/90-09 on 900404-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Unresolved Items Noted in Insp Rept 50-289/89-13 Re Testing & Maint of motor-operated Valves & Concerns Re Fuel Oil IR 05000289/19900061990-05-0303 May 1990 Safety Insp Rept 50-289/90-06 on 900227-0403.No Violations Noted.Major Areas Inspected:Power Operations Including,Plant Operations,Responses to Event,Maint/Surveillance Activities, Radiological Practices & Security Measures ML20034A2891990-04-10010 April 1990 Maint Team Insp Rept 50-289/89-82 on 891204-15 & 900122-25. Violations Noted.Major Areas Inspected:Maint Program & Implementation IR 05000289/19900041990-04-0606 April 1990 Insp Rept 50-289/90-04 on 900124-0226.No Violations Noted. Major Areas Inspected:Plant Operations,Refueling Activities & Maint/Surveillance Activities Related to Plant Safety IR 05000289/19900011990-03-0707 March 1990 Insp Rept 50-289/90-01 on 900108-26.No Violations Noted. Major Areas Inspected:Engineering Support Provided by Offsite Technical Functions Dept to Site Activities & Inservice Insp Activities.One Unresolved Item Identified IR 05000289/19900051990-03-0101 March 1990 Insp Repts 50-289/90-05 & 50-320/90-02 on 900122-26.No Violations Noted.Major Areas Inspected:Fire Protection/ Prevention Program Including,Program Administration & Organization & Administrative Control of Combustibles IR 05000289/19890261990-02-27027 February 1990 Insp Rept 50-289/89-26 on 891219-900123.Violations Noted. Major Areas Inspected:Power Operation,Reduced Power Operation,Plant Shutdown/Cooldown Activities & Maint/ Surveillance Activities Re Plant Safety IR 05000289/19900031990-01-24024 January 1990 Insp Rept 50-289/90-03 on 900116-19.No Violations Noted. Major Areas Inspected:Radiological Controls Program, Including Refueling Outage Work & Status of Previously Identified Items IR 05000289/19890251990-01-18018 January 1990 Insp Rept 50-289/89-25 on 891109-1218.No Violations or Unresolved Items Identified.Major Areas Inspected:Plant Operations,Maint/Surveillance & Engineering/Technical Support Activities Re Plant Safety IR 05000289/19890241989-12-29029 December 1989 Insp Rept 50-289/89-24 on 891005-1107.Violation Noted Re Engineered Safeguards Actuation During Surveillance Testing. Major Areas Inspected:Plant Operations & Maint/Surveillance Activities & Emergency Diesel Generator Cooling Fan Failure IR 05000320/19890131989-12-29029 December 1989 Insp Rept 50-320/89-13 on 891130 & 1215.Violation Noted. Major Areas Inspected:Circumstances Connected W/Unplanned Exposure of Radiological Controls Technician Associated W/ Removal of Fuel Lines from Reactor Vessel IR 05000320/19890081989-11-29029 November 1989 Insp Rept 50-320/89-08 on 890818-1020.Personnel Hazard Events Noted.Major Areas Inspected:Decontamination & Defueling Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890811989-11-21021 November 1989 Insp Rept 50-289/89-81 on 891016-18.No Violations Noted. Major Areas inspected:full-participation Emergency Exercise on 891016-18 IR 05000289/19890181989-10-31031 October 1989 Safety Insp Rept 50-289/89-18 on 890826-1004.No Unresolved Items Noted.Major Areas Inspected:Power Operations Activities & Plant Activities Re Safety,Including Integrated Control Sys Transient & ESF Walkdown of Bldg Spray Sys IR 05000320/19890091989-10-26026 October 1989 Reactive Insp Rept 50-320/89-09 on 890928 & 1012-13. Apparent Violations Noted:Exposure of Two Workers in Excess of 10CFR20.101 Limits & Failure to Make 24 H Notification in Accordance W/Requirements of 10CFR20.403(b) ML19325D5751989-10-10010 October 1989 Insp Rept 50-289/89-21 on 890926-29.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Programs,Including Mgt Controls,Audits,Qa & Implementation of Listed Programs IR 05000289/19890141989-10-0606 October 1989 Insp Rept 50-289/89-14 on 890715-0825.No Violations Noted. Major Areas Inspected:Plant Operations & Maint/Surveillance in Area of Safety,Including Spent Fuel Ultrasonic Exam & Licensee Action on Previous Insp Findings IR 05000320/19890051989-09-0707 September 1989 Insp Rept 50-320/89-05 on 890603-0818.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890151989-09-0505 September 1989 Insp Repts 50-289/89-15 & 50-320/89-06 on 890724-28.No Violations Noted.Major Areas Inspected:Organization, Staffing & Hot Particle Control Program at Unit 2 Reactor & Events Connected W/Suspected Intake of Radioactive Matl IR 05000289/19890161989-08-30030 August 1989 Insp Rept 50-289/89-16 & 50-320/89-07 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys,Transportation & Liquid & Gaseous Effluents Programs Including Mgt Controls,Audits & QA IR 05000289/19890131989-08-22022 August 1989 Insp Rept 50-289/89-13 on 890626-0707.No Violations Noted. Major Areas Inspected:Corrective Actions Resulting from IE Bulletin 85-003 Addressing Improper Limit Switch & Torque Switch Settings in motor-operated Valves IR 05000289/19890121989-08-16016 August 1989 Insp Rept 50-289/89-12 on 890610-0714.No Violations Noted. Major Areas Inspected:Power Operations Activities,Plant Operations & Maint/Surveillance,Control Rod Drive Indication Problem & Diesel Generator Fuel Oil QA Program IR 05000289/19890081989-07-12012 July 1989 Insp Rept 50-289/89-08 on 890401-0508.No Violations Noted. Major Areas Inspected:Plant Operations,Equipment Operability,Emergency Power Sys Operability & Licensee Action on Previous Insp Findings IR 05000289/19890801989-07-0707 July 1989 Insp Rept 50-289/89-80 on 890306-17.No Violations or Deviations Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000289/19890111989-06-28028 June 1989 Insp Rept 50-289/89-11 on 890510-0609.Two non-cited Violations Identified.Major Areas Inspected:Plant Operations,Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings IR 05000320/19890041989-06-20020 June 1989 Insp Rept 50-320/89-04 on 890422-0602.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890101989-06-0707 June 1989 Insp Rept 50-289/89-10 on 890508-12.No Violations Noted. Major Areas Inspected:Licensee Evaluation & Resolution of EQ Issues IR 05000320/19850101989-06-0505 June 1989 Errata to Insp Rept 50-320/85-10.Inspector Followup Item 50-320/84-24-01 Should Be 50-320/84-24-03 IR 05000289/19870111989-05-25025 May 1989 Errata to Insp Rept 50-289/87-11,correcting Unresolved Item Number on Page 18 ML20247K0221989-05-15015 May 1989 Mgt Meeting Rept 50-289/89-09 on 890428.Major Area Discussed:Nrc Nonradiological Chemistry Program for Clarification on NRC Acceptance Criteria & Statistical Method Used to Evaluate Program & NRC Training Program IR 05000320/19890031989-05-0909 May 1989 Insp Rept 50-320/89-03 on 890305-0421.No Violations Noted. Major Areas Inspected:Routine Safety Insp of Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890041989-05-0808 May 1989 Insp Rept 50-289/89-04 on 890226-0331.No Violations Noted. Major Areas Inspected:Plant Operations Activities,Equipment Operability & Licensee Action on Previous Insp Findings IR 05000289/19890061989-04-27027 April 1989 Insp Rept 50-289/89-06 on 890403-07.No Violations Noted. Major Areas Inspected:Implementation of Radiation Protection Program IR 05000320/19890021989-04-26026 April 1989 Insp Rept 50-320/89-02 on 890129-0306.No Violations Noted. Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890071989-04-24024 April 1989 Insp Rept 50-289/89-07 on 890404-06.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions for Previously Identified Environ Qualification Issues IR 05000289/19890011989-03-27027 March 1989 Insp Rept 50-289/89-01 on 890115-0225 & 27.No Violations Noted.Major Areas Inspected:Areas of Plant Operations, Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings ML20236B9891989-03-10010 March 1989 Insp Repts 50-289/89-02 & 50-320/89-01 on 890123-26.No Violations Noted.Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000289/19890091989-02-28028 February 1989 Insp Rept 50-289/89-09 on 890213-16.Potential Violation Noted.Major Areas Inspected:Diesel Generator Air Sys Failures IR 05000289/19880291989-02-27027 February 1989 Safety Insp Rept 50-289/88-29 on 881203-890114 & 18.No Violations Noted.Major Areas Inspected:Plant Operations, Equipment Operability (Maint & Surveillance) & Engineering & Technical Support IR 05000289/19890051989-02-21021 February 1989 Insp Rept 50-289/89-05 on 890214-15.No Violations Noted. Major Areas Inspected:Performance of Visual Fire Damper Surveillance Test,Surveillance Test Records,Security Records of Personnel Access & Witnessing of Surveillance Test IR 05000320/19880201989-02-15015 February 1989 Insp Rept 50-320/88-20 on 881218-890131.No Major Problems Noted.Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19880271988-11-28028 November 1988 Insp Rept 50-289/88-27 on 881115-17.No Violations or Deviations Noted.Major Areas Inspected:Licensee Partial Participation Annual Emergency Preparedness Exercise Conducted 881116 1990-08-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154L9821998-10-15015 October 1998 Notice of Violation from Insp on 980810-27.Violation Noted: in Oct 1997,change to Facility as Described in Section 6.1, Eccs,Of TMI-1 Ufsar,Involving Unreviewed Safety Question,Was Made Without Prior Commission Approval IR 05000289/19980061998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements ML20153E9471998-09-24024 September 1998 Exam Rept 50-289/98-301 Conducted on 980824-27.Exam Results: Four SRO Applicants Passed All Portions of Initial License Exam IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203L7821998-02-26026 February 1998 Notice of Violation from Insp on 971102-980124.Violation Noted:Licensee Not Review & Approve Substantive Change to Existing Inservice Test Surveillance Procedure. Page 25 of Incoming Submittal Not Included IR 05000289/19980991998-02-26026 February 1998 SALP Rept 50-289/98-99 for Period 960805-980124 ML20199H6141998-01-27027 January 1998 Notice of Violation from Insp on 970907-1101.Violation Noted:Pressurizer Power Operated Relief Valve Was Returned to Svc Without Performing an IST to Verify Proper Valve Operation After Valve Replaced IR 05000289/19970091997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities1997-11-0505 November 1997 PNO-I-97-068:on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20217H3281997-10-0808 October 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $210,000.Violation Noted:On 940601,design Bases Were Not Correctly Translated Into Operating Procedures Re Switchover of Dhrs Pumps from Bwst to Reactor Building Sump ML20198R2831997-10-0303 October 1997 EN-97-096:on 971008,notice of Proposed Imposition of Civil Penalty in Amount of $210,000 Issued to Licensee.Action Based on Violations Involving Design Engineering,Equipment Classification & Corrective Actions ML20210R9641997-08-19019 August 1997 Notice of Violation from Insp on 970616-0727.Violation Noted:Licensee Failed to Implement EP Implementing Procedure EPIP-TMI-.03,Exhibit 1, Emergency Notifications & Call Outs IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970071997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering ML20149K0081997-07-23023 July 1997 Notice of Violation from Insp on 970428-0502 & 0512-16. Violations Noted:On 970430,LER 97-03,did Not Contain Clear, Specific,Narrative Description of What Occurred IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970041997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations PNO-I-97-018, on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event1997-03-28028 March 1997 PNO-I-97-018:on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20135F1641996-12-0606 December 1996 Notice of Violation from Insp on 960929-1118.Violation Noted:Scaffold tied-off & Supported by Safety Related Pipe Support for Nuclear River Water Sys W/O Prior Engineering Evaluation & Approval IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0851996-11-14014 November 1996 Notice of Violation from Insp on 960804-0928.Violation Noted:Improper Control of Posted High Radiation Area Entrance ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20129B3601996-09-13013 September 1996 Notice of Violation from Insp on 960617-0803.Violation Noted:Inspectors Could Not Confirm Valve Factor Inputs to Calculations Which Establish Design Basis Functionality of Motor Operated Valves in Safety Re Applications IR 05000320/20040281995-06-0505 June 1995 Insp Repts 50-335/95-05 & 50-389/95-05 on 950320-0428. Violations Noted.Major Areas Inspected:Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 ML20058A4891993-11-12012 November 1993 Notice of Violation from Insp on 931004-08.Violation Noted: Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel IR 05000289/19930231993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint 1999-09-27
[Table view] |
Text
.
_
_
.
..
..
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I
-
Report No.
50-320/80-13 Docket No.
50-320 License No.
OPR-73 Priority Category c
--
Licensee:
Metropolitan Edison Company P. O. Box 542 Reading, Pennsylvania 19603 Facility Name: Three Mile Island Nuclear Station, Unit 2
>
Inspection at:
Middletown, Pennsylvania Inspection conducted:
July 18 - August 5, 1980 Inspector:
[A M. Ob />.
K/.4 [fo W. H. Barley, Rad Eion Specialist date signed Reviewed:
W.
~
/
f([2//fd ti. M. Shanbak SenioVRadiation Specialist date signed i
Approved by:
//
4 > tw
.
6/.19/rd
,
. N. Fasario, Chief, Site Operhtions Section, date ' signed TMI Program Office
.
Inspection Sumary:
Inspection on July 18 - August 5, 1980, (Inspection Report No. 50-320/80-13).
Areas Inspected: Spe'cial announced inspection by one resident inspector at
.
TMI of the August 28, 1979, event involving exposure received by six workers
!
in excess of regulatory limits.
Areas inspected included review and examination of the data provided in the independent NRC evaluation of the event as submitted l
by U.S. Department of Energy in a report dated June 1980, evaluation of licensee's records, and investigation of the event and interviews with licensee's personnel.
'
The inspection involved 40 inspector hours onsite by one resident irspector.
Results: Of the three areas inspected, six items of noncompliance were identified
,
(Violation - Exposure of six workers in excess of 10 CFR 20.101(a), paragraph 4;
Infraction - Failure to survey in accordanc5 witn 10 CFR 20.201(b) to assure
compliance with 10 CFR 20.101., paragraph 6; Infraction - Failure to use appropriate extremity dose monitoring equipment as required by 10 CFR 20.202, paragraph 7; Deficiency - Failure to maintain exposure records as required by 10 CFR 20.401(a),
paragraph 10; Infraction - Failure to provide exposure reports to exposed I
individuals as required by 10 CFR 19.13(d), paragraph 9; Infraction - Failure to use a radiation monitoring device which continuously indicates dose rate in a
high radiation area, paragraph 6).
.
8107170154 8107o1 gDRADOCK 05000320 PDR l
-.
..
. -. -
- -.
---.
-
-. - -
- - - - - - -.
_, -
_.
.
.
.
Datails
-
1.
Persons Contacted
- R. C. Arnold, Senior Vice President, Metropolitan Edison Company
- J. W. Brasher, Manager, Radiation Controls, General Public Utilities Service Corporation
- J. J. Chwastyk, Supervisor of Operations, Unit 2, Metropolitan Edison Company
- R. W. Dubiel, Supervisor Radiological Engineering, Unit 1, Matr9politan Edison Company
- E. D. Fuller, Supervisor of Licensing, Unit 2, General Public
-
Utilities Service Corporation
- R. Heward, Director, Radiation Controls, General Public Utilities Service Corporation
- D. F. Limroth, Superintendent, Administrative and Technical Supoort, Metropolitan Edison Company
- S. W. Porter, Jr., Effluent and Dose Assessment for Metropolitan Edison Company
- P. E. Reuti.er, Manager, Radiological Technical Support, General Public Utilities Service Corporation The inspector contacted several other licensee employees of the radiation protaction staff.
- Denotes those individauls attending the exit interview on August 5,1980.
2.
Inspection Scope.
The purpose of this inspection effort was to review licensee actions and evaluations performed as a result of an event on August 28, 1979, at Three Mile Island Nuclear Station in which six individuals sustained exposures to the skin in excess of 10 CFR 20 limits while performing maintenance functions on valves in the YMI-2 fuel handling building north make-up valve room.
This was considered as an open item (50-320/79-23-09) pending review of licensee's evaluation and NRC independent examination of this event.
3.
Event Description.
On August 28, 1979, following abnormally high airborne contaminations in the fuel handling building, a health physics techniciar. (HP) enterec the valve alley on the 280' elevation of the fuel handling building.
This HP identified MUV-155 and MUV-233A valves to have reactor coolant leaks through their packing.
An air sample was obtained as well as a rapid area survey by use of a teletector during this entry.
Two operators were dispatched ta the valve alley to tighten the packing and stop the leaks.
Operator #1 entered the room and was unable to stop the leak from fiUV-233A during an estimated stay time in the room of approximately 4 minutes.
Follewing discussions of what remained to be done with operator #1, operator #2 entered the room. This second operator was able to close valve MUV-155 during about 3 minutes in the room.
,
.
,
..
..
.
..
..
,
_. _ _ _ -,
. -..
-
.
-
.
-
.-.
-.
.
._.
-
-
.
'
-
.
.
.
These two coerators reported they were unable to completely stop the leakage from MUV-233A.
Operater #3 was then sent into the room to attempt to tighten the packing of MUV-233A.
Operator #3 remained in the room for just over 3 minutes.
During this entry, the leak on NUV-233A was secured.
Due to uncertainty surrounding the status of leakage from ':UV-155, the HP, while entering the auxiliary building to retrieve air samples, again entered the room.
At this time he found MUV-233A leak secured but MUV-155 still leaking at the rate initially reported by the HP.
Two more operators were dispatched to secure the leakage from MUV-155.
Operator #4 remained in the room for about 3 minutes but uniy completed a portion of the job.
Following discussions with operator #4, operator #5 entered the room and was able to stop the leak. This operator was also in the room about 3 minutes.
4.
Personnel Exposures.
The following is a summary of preliminary exposures reported to the Commission on September 28, 1979:
Penetrating Non-Penetrating P_erson Penetrating Non-Penetrating Total Skin Extremity Extremity HP 0.72 16.14 16.86 No Extremity Dosimetry Worn OP #1 0.29 3.41 3.70 1.74 38.64 OP #2
No Data Submitted on September 28, 1979----------------
OP #3 0.26 8.58 8.84
.59 8.58 OP #4 1.07 52.37 53.44 6.69 148.07 OP #5 0.47 4.92 5.39 6.16 143.65 All of the above reported exposures are in rem.
In order to completely assess exposures to various areas and organs of the bodies of the six individuals that entered the make-up valve room on August 28, 1979, an evaluation of source terms, operator stay times and orientations, protective clothing worn, and beta response of the TLD used had to be conducted.
The licensee results of this evaluation were submitted to the Comission on December 5,1979.
Subsequent to the December 5, ?979, submittal to the Comission, an independent review of the final dose evaluations was performed by personnel from the U.S. Department of Energy, Idaho Operations Office (see EGG-SD-5159).
This independent review verified that
the assigned doses to the skin of the legs and hands, as reported by the licensee, were limiting and were conservatively assigned.
l
\\
---
. - -..
.
-
_ _
_.
__
_-
.
.
.
.
DOSES TO UMT 2 WORKERS FROM MAKE-UP VALVE ROOM FIELDS I
AS CALCULATED BY THE TMI STAFF AND SUBMITTED TO THE COMMISSION ON DECEMBER 5,1979 Operator Operator Operator Operator Operator WORKER H.P.
2
4
Left Hand y
0.6 0.6 0.5 0.5 0.8 0.5
-
s 7.0 6.7 12.0 5.0 81.0 37.0
,
.
Right He.nd y
0.6 0.6 0.5 0.5 0.8 0.5 s
7. 0 15.0 4.1 2.1 55.0 6.1 Chest y
0.6 0. 6 0.5 0.5 0.8 0.5 s
12.0 2.5 1.2 6.4 51.0 32.0 Eyss y
0.6 0.6 0.5 0.5 0.8 0.5 s
0.0 0.0 0.0 0.0 0.1 0.1 Left Leg y
0.6 1.0 0.8 0.8 0.8 0.5
39.0 25.0 12.0 3.2 128.0 74.0 Right Leg y
0.6 1.0 0.8 0.8 0.8 0.5
39.0 4. 0 7.1 28.0 165.0 160.0
0.6 1.0 0.8 0.8 0.8 0.5
3.6 5.1 1.5 0.4 13.0 7.4
0.6 1.0 0.8 0.8 0.8 0.5
3.6 0. 8 0.8 3.3 16.0 16.0 Gonads y
0.6 1.0 0.8 0.8 0.8 0.5
0.4 0.3 0.1 0.3 1.5 1.4 Doses in Rads Beta doses are skin doses except for gonad and eye beta dose.
- Beta dose is dose to skin of ankles since all operators wore street shoes in addition i
to protective clothing.
The inspector indicated to licensee representatives that exceeding 18.75 Rems to the extremities and 7.5 Rems to the skin constituted noncompliance with 10 CFR 20.101(a) (50-320/80-13-01).
5.
Preplanning and Engineering Controls to Maintain Exposures as low as Reasonably Achievable (ALARA).
Preplanning was inadequate prior to the initial entry for visual inspection for the leaks, in that, extremity monitoring and use of survey instrumentation were not perfomed as required (details, paragraphs 6 and 7).
The inspector determined, through examination of records (Radiation Work Pemit
(RWP)) and discussion with licensee representatives, that assessment
of possible hazards to be encountered was not adequately performed, l
and no ALARA review of the initial entry was performed.~
l
.
-.
. _
-. -
- _..
-.
-
.__
_
.
.-.
__ __
.,
.,
.
-
.
There was also inadequate ALARA review fcr the entry teams based on dose rates and air sample analysis.
No use of actual photographs of the area with the leaking valves or actual instruction on similar valves in a clean area was used to limit exposures during the course of the work.
It was noted by the inspector, through examination of licensee procedures, that no procedural requirement for an ALARA review existed on August 28, 1979.
On November 14, 1979, a memorandum was issued to all Unit 2 recovery
'
effort supervisors from R. W. Heward, Jr., Manager of Radiological Controls addressing criteria for activities requiring radiological engineering review.
However, still as of July 1980, no procedural requirement for ALARA review exists.
An AL%RA procedure is currently in a draft fonn and circulating for approval.
This is considered an unresolved issue pending approvat and issuance of
-
an ALARA procedure (50-320/80-13-02).
6.
Surveys.
As a direct result of failure to recognize the. potential hazards
'due to the leaking primary coolant in the narth make-up valve room, no beta measurements were performed during or subsequent to the initial entry.
The first indications of excessive beta dose rates were upon processing of the TLP's worn by the individuals that entered the room.
The inspector stated to licensee representatives that failure to survey for beta radiation as necessary to comply with 10 CFR 20.201 (50-320/80-13-03).
Initial air sampling indicated airborne radioactivity concentrations in areas of the fuel handling building above the north make-up valve room were measurea to be 65 times 10 CFR 20, Appendix G, Table 1, Column 1 limits (MPC).
A general sample taken within the north make-up valve room during the initial entry indicated airborne radioactivity concentrations of 380 times MPC.
Although no measurements were taken during subsequent
,
I entries,through discussions with licensee representatives and review of ventilation within the room, it was determined that the initial general sample provided adequate measurements for controlling the worker exposure to airborne radioactive material.
Later bioassay of involved individuals also indicated that adequate protective measures for airborne contamination were taken.
Examination of records and discussion with the licensee showed that the five of the six individuals who entered the fuel handling building north cake-up valve room on August 28, 1979, did not have continuously indicating i
dose rate instrument.
Also there was no radiation protection qualified individual, with positive control, monitoring their doses.
Thus, no i
'
method was present to alert the individuals to any unforseen changes in the radiation dose rates within the room.
,
l
.
e
. - - -. - - - - - - - - - -
-
-
- -.
. _-
_.-.
'
.
,
.
.
.
The inspector indicated to licensee representatives that failure to use the above precautionary dose control measures constituted noncompliance with Commission Order dated July 20, 1979, and Adainistrative Procedure 1003 (50-320/80-13-04).
)
7.
Personnel Monitoring.
The HP on the initial entry to the room wore a thermoluminescent dosimeter (TLD) monitoring device and two self reading
,
dosimeters, one on his chest and one taped to his wrist.
He wore no i
extremity monitoring device capable of measuring beta exposure and subsequent dose assessment estimated his extremity dose to the hands to be 7.6 Rems.
,
The inspector indicated to the licensee representatives that failure to provide appropriate extremity dosimetry constituted noncompliance with 10 CFR 20.202 (50-320/80-13-05).
.
The five operators that entered the room to secure the leakage wore a TLD on the chest area and additional monitoring TLD's on each leg.
No direction was given as to placement of these additional TLD's and as a result, two men wore the TLD's an their knees and the remaining three wore the TLD's on their feet.
These five men also wore extremity TLD's on their hands and two self reading dosimeters (one on tha chest and one on the wrist).
A review sf the basic TLD data indicates problems with the response of the present dose monitoring equipment in the beta fields produced by
'
reactor coolant cor.taminants present at Three Mile Island.
Penetrating (gemma) exposure is overestimated due to the inadequate shield thickness over the gamma chip.
Non penetrating (beta) exposure me.uurements using TLD's are very orientation and energy dependant.
This appears to be a generic problem, it is of more concern at Three Mile Island than at most l
power reactors due to the fission product contamination levels (i.e.
S r-9C).
The licensee has committed to review this dosimetry pu lem and provide a solution by December 1, 1980.
This item will be followed in a t
l subsequent inspection (50-320/80-13-06).
8.
Instructions to Workers.
Instructions about gamma radiation levels and stay times were given to the five operation individuals that entered the north make-up valve room.
Due to unknown beta radiation levels within the room, no direction was given as to beta dose rates or hazards of highly contaminated water.
The inspector reviewed current instructions to workers entering significant beta radiation fielos (i.e., containnient or reactor coolant bleed tank room) a d has verified licensee corrective action to dis <uss applicable beta radiation uzards.
The current actions appear to be satisfactory.
The inspector has no further questions in this area at this time.
9.
Reports to Workers.
A review of the individual dosimetry history file for each of the six people that received exposures in excess of 10 CFR 20 limits on August 28, 1979, was performed.
The licensee's records indicate each individual was issued a report dated November 30, 1979, of exposures received on August 28, 1979.
The report filed with
,
I i
--o---,
~,- - - -,
,,------,-gr
.-,g,w w.
--
--,,,p-,e y,
--,,,.,-w-,,--
-,v-->w e,g_,
w,n=
,,ng.,,,,,,,-1..,,..,.,.ma
,,,,--,-,------..,-new
,n,--,,.n-
,<
-
._
.
.
.
.
the Commission pursuant to 10 CFR 20.405 was dated September 28, 1979.
The report to the involved individual is required to be transritte; to the individual at a time rot later than the transmittal to the Cornission.
Further, a review of exposure records for two individuals invol'.ed in sampling of reactor primary coolant on March 29, 1979, indicated that there was no documented report issued to the individuals concerning their exposures to their extremities in excess of 10 CFR 20.101 limits until June 1980.
The inspector also noted that the report issued to the individuals on November 30, 1979, contained some of the information submitted to the Commission in a followup report dated December 5, 1979.
However, the report to the individuals did not include all of the information transmitted to the Commission in that no information was provided concerning gonadal, eye, or extremity exposures.
Licensee representatives stated that two meetings were held with the involved individuals both just after the exposures and prior to issuance of the December 5, 1979, final dose assessment.
During these meetings all data was verbally explained to the involved individ;als, questions were answered, and copies of some portions of the December 5, 1979, submittal to the Commission were provided to the individuals involved.
i The inspector indicated to licensee representatives that failure to provide a report to individuals at a time not later than the transmittal to the Commission constitutes noncompliance with 10 CFR 19.13(d) (50-320/80-13-07).
10.
Exposure Records.
For each of the six individuals involved, the NRC-form 5 equivalent reports dated June 27, 1980, were reviewed 64 the inspector.
The whole body exposure doses for the period August 1, 1979, to August 23, 1979, ranged from a low of 0.5 Rem to a high of 1.0 Rem.
These doses recorded were in agreement with the penetrating doses reported in the December 5, 1979, submission.
However, the total doses reported to the gonads ranged trom 0.9 Rem to 2.3 Rem and were not recorded as whole body exposures.
For the abe e individuals, the extremity doses to the hands ranged from 2.6 Rem to 31.8 Rem and extremity doses to the feet ranged from 1.2 Rem to 16.8 Rem.
In each individual's NRC Form 5 equivalent report, no extremity doses were recorded for the time period August 1, 1979, to August 29, 1979.
The inspector indicated to licensee representatives that failure to maintain correct whole body and extremity doses constituted noncompliance with 10 CFR 20.401(a) (50-320/80-13-08).
11.
Unresolved Items.
Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations.
An unresolved item disclosed during this inspection is described in paragraph 5.
.
.
.
__ _.._,_____ _ _
...
..
.
.
_
.
.
.
.
12.
Exit Interview.
The inspector met with the licensee management (denoted in paragraph 1) at the conclusion of the inspection on August 5, 1980, at the TMI site.
The inspector summarized the inspection findings.
The licensee management acknowledged the inspection findings.
13.
References and Documents Review During this inspection, the inspector reviewed several documents pertaining to the August 28, 1979, event including the following:
August 30, 1979, J. B. Logan to Mr. Boyce H. Grier, subject:
10 CFR 20
--
Report of Exposure.
September 28,1979, GQL 1188, J. G. Herbein, to Office of Inspection
--
and Enforcement, Radiation Exposure to Personnel.
December 5,1979, GQL 1499, R. F. Wilson to Mr. B. H. Grier, August 29, 1979 -
--
Radiation Exposure.
Technical Assessment of Radiation Overexposures at Three Mile Island
--