Forwards IE Insp Rept 50-320/80-13 on 800718-0805 & Notice of Violation
ML20009B770
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/01/1981
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hovey G
METROPOLITAN EDISON CO.
Shared Package
ML20009B771 List:
References
NUDOCS 8107170147
Download: ML20009B770 (2)


See also: IR 05000320/1980013

Text

.

ha

/

o

Utd!TED STATES

!

Ig

NUCLEAR REGULATORY COMMISSION

g }t),- q[c

g

REGION I

s

o

l

631 PARK AVENUE

g

e

KING CF PR'JSSIA, PENNSYLVANIA 19406

41

.NP )*

JUL 011981

s

. s$ s 'h

Docket F). 50-320

Q

Metropolitan Edison Company

67

L.U

3

NL l G Jggg 7

ATTN:

Mr. G. K. Hovey

Z

Vice President and Director of TMI-2

$-

%%

-3

P. O. Box 480

N

%*D

Middletown, Pennsylvania 17057

.

y

Gentlemen:

mi O

Subject:

Inspectio'1 80-13

This refers to the special inspection conducted by Mr. W. Barley of our TMI

Program Office staff July 18-Aagust 5,1980 at Three Mile Island Nuclear

Station, Unit 2, Middletown, Pennsylvania of activities authorized by NRC

License No. DPR-73 and to the discussions of our findings held by Mr.

Barley with Mr. R. Arnold and other staff members at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative racords, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

'

These items of non:ompliance have been categorized into the levels as

described ir our correspondence to you dated December 31, 1974. With

respect to these items of noncompliance, we conducted a Health Physics

i

Evaluation during the period July 28 to August 8, 1980, and matters dealing

'

with the overall management of these areas of noncompliance were identified

as weaknesses.

In your responses dated December 1G and 30, 1980 and February,

1980 (LTLO24) to the Health Physics Evaluation, you identified actions that

haa been taken to strengthen those weaknesses.

These corrective actions

were reviewed during an inspection conducted during the period April 13 to

24, 1981 and found to be acceptable.

Therefore, no further response to

this letter is required.

In accorcance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(c)(4), it is necessary

[4

c.

L

8107170147 810701

PDR ADOCK 05000320

0

PDR

JUL 011981

,

'

.

Metropolitan Edison Company

2

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identif1es the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone notifict. tion of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

2

BodeH.Grier

-

Director

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-320/80-13

cc w/encls:

J. J. Barton, Manager Site Operations, TMI-2

E. G. Wallace, PWR Licensing Manager

J. B. Lieberman, Esquire

G. F. Trowbridgo, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment

(Without Report)