Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1872022-04-13013 April 2022 04 Final Outlines ML22133A2912022-04-13013 April 2022 04 Final Written Exam.Pdf ML22133A2902022-04-13013 April 2022 04 Final Operating Test ML22147A1812022-04-13013 April 2022 04 Draft Operating Test Comments.Pdf ML22147A1842022-04-13013 April 2022 04 Draft Outlines ML22147A1862022-04-13013 April 2022 04 Draft Written Examination ML22147A1832022-04-13013 April 2022 04 Draft Outline Comments ML22147A1852022-04-13013 April 2022 04 Draft Written Examination Comments ML22147A1822022-04-13013 April 2022 04 Draft Operating Test ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 2024-09-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1872022-04-13013 April 2022 04 Final Outlines ML22133A2912022-04-13013 April 2022 04 Final Written Exam.Pdf ML22133A2902022-04-13013 April 2022 04 Final Operating Test ML22147A1812022-04-13013 April 2022 04 Draft Operating Test Comments.Pdf ML22147A1842022-04-13013 April 2022 04 Draft Outlines ML22147A1862022-04-13013 April 2022 04 Draft Written Examination ML22147A1832022-04-13013 April 2022 04 Draft Outline Comments ML22147A1852022-04-13013 April 2022 04 Draft Written Examination Comments ML22147A1822022-04-13013 April 2022 04 Draft Operating Test ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 2024-09-09
[Table view] |
Text
une 13, 2019
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - NRC EXAMINATION REPORT 05000368/2019301
Dear Mr. Anderson:
On May 16, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Arkansas Nuclear One, Unit 2. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on April 25, 2019, with you and other members of your staff. A telephonic exit meeting was conducted on May 16, 2019, with Mr. Greg Kilpatrick, Training Manager, who was provided the NRC licensing decisions.
The examination included the evaluation of seven applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 50-368 License No. NPF-6
Enclosure:
Examination Report 05000368/2019301
Inspection Report
Docket Number: 05000368 License Number: NPF-6 Report Number: 05000368/2019301 Enterprise Identifier: L-2019-OLL-0005 Licensee: Entergy Operations, Inc.
Facility: Arkansas Nuclear One, Unit 2 Location: Russellville, Arkansas Inspection Dates: April 22, 2019, to May 16, 2019 Inspectors: J. Kirkland, Chief Examiner, Senior Operations Engineer K. Clayton, Senior Operations Engineer C. Osterholtz, Senior Operations Engineer T. Farina, Operations Engineer M. Doyle, Under Instruction, Operations Engineer Approved By: Gregory E. Werner Chief, Operations Branch Division of Reactor Safety Enclosure
SUMMARY
ER 05000368/2019301; ARKANSAS NUCLEAR ONE, UNIT 2; INITIAL OPERATOR
LICENSING EXAMINATION REPORT The NRC examiners evaluated the competency of seven applicants for reactor operator licenses and four applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 2.
The NRC developed the written examination and the licensee developed the operating test using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the NRC on May 2, 2019. The NRC examiners administered the operating tests on April 22 - 25, 2019.
The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES
- INITIAL LICENSE EXAM
.1 License Applications
a. Scope
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.
b. Findings
The NRC examiners provided the written examination, operating test outlines, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed operating test comment resolution prior to examination administration.
The NRC examiners determined the operating test initially submitted by the licensee was within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On May 2, 2019, the NRC proctored the administration of the written examinations to all applicants. The NRC graded the written examinations and the licensee analyzed the results and presented their analysis to the NRC on May 6, 2019.
The NRC examination team administered the various portions of the operating tests to all applicants on April 22 - 25, 2019.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted four generic weaknesses associated with applicant performance on the written examination. The applicants displayed weaknesses in knowledge of:
- power supplies associated with refueling water tank valves
- systems required to commence establishing a vacuum on the main condenser
- technical specification shutdown requirements associated with one inoperable emergency core cooling high pressure safety injection train.
The licensee generated Condition Report WT-WTANO-2019-00183 to track the generic weaknesses associated with the written examination. The licensee determined that the questions were satisfactorily written and required no change. The condition report should ensure a training analysis is conducted to review for possible adjustments to the program and/or training material. Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
Exit Meeting Summary
The chief examiner presented the preliminary examination results to Mr. R. Anderson, Site Vice President, and other members of the staff on April 25, 2019. A telephonic exit was conducted on May 16, 2019, between Mr. J. Kirkland, Chief Examiner, and Mr. G. Kirkpatrick, Training Manager. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- G. Kirkpatrick, Training Manager
- R. Martin, Operations Training Superintendent
- D. Lacy, Simulator Instructor
- B. Coble, Exam Writer
NRC Personnel
- C. Henderson, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED