MONTHYEARIR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 IR 05000266/20220062023-03-0101 March 2023 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) IR 05000266/20230102023-02-23023 February 2023 Comprehensive Engineering Team Inspection Report 05000266/2023010 and 05000301/2023010 ML23009B7002023-01-24024 January 2023 Review of the Spring 2022 Steam Generator Tub Inspections Report IR 05000266/20220042023-01-24024 January 2023 Integrated Inspection Report 05000266/2022004 and 05000301/2022004 IR 05000266/20224012022-12-0808 December 2022 Security Baseline Inspection Report 05000266/2022401 and 05000301/2022401 IR 05000266/20224042022-12-0202 December 2022 Cyber Security Inspection Report 05000266/2022404 and 05000301/2022404 IR 05000266/20220032022-11-0707 November 2022 Integrated Inspection Report 05000266/2022003 and 05000301/2022003 ML22298A2972022-10-27027 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections Report IR 05000266/20220122022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000266/2022012 and 05000301/2022012 IR 05000266/20220052022-08-26026 August 2022 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) IR 05000266/20220112022-08-0303 August 2022 Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011 IR 05000266/20220022022-07-27027 July 2022 Integrated Inspection Report 05000266/2022002 and 05000301/2022002 IR 05000266/20220012022-05-0404 May 2022 Integrated Inspection Report 05000266/2022001 and 05000301/2022001 IR 05000266/20210062022-03-0202 March 2022 Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) IR 05000266/20220102022-02-0909 February 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000266/2022010 and 05000301/2022010 IR 05000266/20210042022-01-28028 January 2022 Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion IR 05000266/20214022021-11-10010 November 2021 Security Baseline Inspection Report 05000266/2021402 and 05000301/2021402 IR 05000266/20210032021-10-20020 October 2021 Integrated Inspection Report 05000266/2021003 and 05000301/2021003 IR 05000266/20215012021-10-0505 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2021501 and 05000301/2021501 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 IR 05000266/20210052021-09-0101 September 2021 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) IR 05000266/20214032021-08-0404 August 2021 Security Baseline Inspection Report 05000266/2021403 and 05000301/2021403 IR 05000266/20210022021-07-29029 July 2021 Integrated Inspection Report 05000266/2021002, 05000301/2021002, and 07200005/2021001 IR 05000266/20210102021-07-0101 July 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000266/2021010 and 05000301/2021010 IR 05000266/20210012021-04-21021 April 2021 Integrated Inspection Report 05000266/2021001 and 05000301/2021001 IR 05000266/20214012021-03-16016 March 2021 Security Baseline Inspection Report 05000266/2021401; 05000301/2021401; Independent Spent Fuel Storage Security Inspection Report 07200005/2021401 IR 05000266/20200062021-03-0404 March 2021 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) IR 05000266/20200902021-02-0909 February 2021 Final Significance Determination of a Green Finding; NRC Inspection Report 05000266/2020090 and 05000301/2020090 IR 05000266/20200042021-02-0808 February 2021 Integrated Inspection Report 05000266/2020004 and 05000301/2020004 IR 05000266/20204022020-12-14014 December 2020 Security Baseline Inspection Report 05000266/2020402 and 05000301/2020402 IR 05000266/20200032020-11-0404 November 2020 Integrated Inspection Report 05000266/2020003 and 05000301/2020003 IR 05000266/20200102020-09-24024 September 2020 Biennial Problem Identification and Resolution Inspection Report 05000266/2020010 and 05000301/2020010 IR 05000266/20200052020-09-0101 September 2020 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020005 and 05000301/2020005) IR 05000266/20200022020-08-0606 August 2020 Integrated Inspection Report 05000266/2020002 and 05000301/2020002 IR 05000266/20200122020-08-0303 August 2020 NRC Inspection Report 05000266/2020012 and 05000301/2020012; Preliminary White Finding and Apparent Violations IR 05000266/20200112020-07-29029 July 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000266/2020011 and 05000301/2020011 IR 05000266/20200012020-05-13013 May 2020 Integrated Inspection Report 05000266/2020001 and 05000301/2020001 ML20100G8902020-04-0707 April 2020 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000266/2020-011 and 05000301/2020-011 IR 05000266/20204012020-03-30030 March 2020 Security Baseline Inspection Report 05000266/2020401 and 05000301/2020401 IR 05000266/20190062020-03-0303 March 2020 Annual Assessment Letter for Point Beach Nuclear Plants, Units 1 and 2 (Report 05000266/2019006 and 05000301/2019006) IR 05000266/20190042020-02-0505 February 2020 Integrated Inspection Report 05000266/2019004 and 05000301/2019004 2024-02-01
[Table view] Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] |
Text
July 29, 2020
SUBJECT:
POINT BEACH NUCLEAR PLANT - DESIGN BASIS ASSURANCE INSPECTION (TEAMS) INSPECTION REPORT 05000266/2020011 AND 05000301/2020011
Dear Mr. Strope:
On July 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2020011 and 05000301/2020011 Enterprise Identifier: I-2020-011-0027 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant Location: Two Rivers, WI Inspection Dates: June 22, 2020 to July 10, 2020 Inspectors: C. Baron, Contractor J. Corujo-Sandin, Reactor Inspector A. Dahbur, Senior Reactor Inspector M. Domke, Reactor Inspector B. Jose, Senior Reactor Inspector E. Sanchez Santiago, Senior Reactor Inspector Approved By: Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (teams) inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. Regional based inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. For the inspection documented below portions of the IP were completed remotely as well as on site and all the objections and requirements for completion of the IP were met.
REACTOR SAFETY
===71111.21M - Design Bases Assurance Inspection (Teams) The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:
Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02)
=
Main article: IP 71111.21
- (1) Station Service Transformer 2X-14
- Material condition and configuration control
- Surveillance and testing procedures
- Electrical rating and loading design
- Maintenance history and effectiveness
- (2) Emergency Diesel Generators (EDGs) G-03 and G-04
- Electrical Steady State and Transient Load Flow, Short Circuit and Voltage Drop Calculations
- Emergency refueling capability
- Air start system capability
- Technical Specification amendment associated with fuel oil capacity
- EDG testing and acceptance criteria
- Normal and emergency procedures associated with EDG operation
- (3) Containment Sump Suction Valves 2SI-HOV-850A and 2SI-MOV-851A
- Minimum Voltage available at the Motor Terminals During Worst Case Degraded Voltage Condition
- Thermal Overload Set-points
- Pressure lock/thermal binding evaluation
- Design basis flows and delta pressures
- Normal and emergency operating procedures associated with motor operated valves
- Design and testing of valve interlocks
- Accessibility and timing of local valve operation
- (4) 125 VDC Buses D03 and D04
- Short Circuit Calculation
- Maintenance Work Orders and Surveillance Procedures
- Battery Charger Sizing and Setpoints
- Cable Protection Calculations
- Protective Devices Coordination
- (5) Residual Heat Removal Pumps 2P-10A and 2P-10B
- Flow and Head Requirements
- Surveillance and Testing Procedures
- American Society of Mechanical Engineers (ASME) Code Requirements
- Corrective Action History
- (1) Residual Heat Removal Return Line Isolation Valve 2RH-MOV-720
- Surveillance and Test Work Orders
- Technical Specifications and Bases
- Design Basis Flows and Delta Pressures
- Corrective Action History
- Motor Stem Thrust Calculation
Modification Review - Permanent Mods (IP Section 02.03) (6 Samples)
- (1) EC-289692, Update Battery Room VAC System Temperature Setpoints
- (2) EC-2622464, Equivalency Needed to Replace the 1D-205 and 2D-205 Batteries, Inter Rack, Inter Tier, and Crossover Cables with 4 3/0 Multi Strand Cables Per Set
- (3) EC-291259, Y16 Breaker Replacement
- (4) EC-273236, Reset Safety Injection Accumulator Pressure and Level Alarm Setpoints to Allow for Wider Operating Bands within Technical Specifications
- (5) EC-259510, Emergency Diesel Generator Air Start Motor Replacement (G-01, G-02, G-03, G-04)
- (6) EC-284675, Generic Safety Issue 191 Unit 1 Modifications
Review of Operating Experience Issues (IP Section 02.06) (2 Samples)
- (1) NRC Information Notice 17-06, Battery and Battery Charger Short-circuit Current Contributions to a Fault on the Direct Current Distribution System
- (2) Regulatory Issue Summary 00-24, Offsite Power Voltage and Grid Reliability due to Industry Deregulation
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 10, 2020, the inspectors presented the design basis assurance inspection (teams) inspection results to Mr. M. Strope, Site Director and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21M Calculations 2000-0036 pH of Post LOCA Sump and Containment Spray 3
2001-0001 Hydraulic Pressures Associated with SI-850 Valves 1
2001-0033 Electrical Input Calculation: 345kV to 480V Switchgear 0
Circuits
2003-046 Battery Charger Sizing and Current Limit Setpoint 9
2004-0002 AC Electrical System Analysis 5
2005-0007 PBNP Electrical System Transient Analysis 3
2010-0024 Point Beach EOP Time Setpoints 4
2014-04473 Internal Flooding Assessment of Emergency Diesel 2
Generator Building
2016-005 125 Vdc Cable Protection 1
CN-CRA-08-47 Steam Generator Tube Rupture (SGTR) Margin to Overfill 1
Analysis for Point Beach Units 1 and 2 (WEP/WIS) to
Support the Extended Power Uprate
N-92-005 125 Vdc Protection Devices Calculation 3
N-92-086 ECCS Pump Protection 5
N-93-076 1(2) SI-851A, 851B 1(2) SI-856A, 856B (Group 16) MOV 1
Differential Pressure Calculation
N-93-079 1(2)SI-896A/B and 1(2)SI-870A/B (Group 19) MOV 3
Differential Pressure Calculation
N-94-019 Determination of Conditions for MOV Pressure Locking and 0
Thermal Binding
N-94-142 Emergency Diesel Generator, Gas Turbine and Fire Pump 8
Diesel Engine Fuel Oil Systems
P-89-031 Voltage Drop Across MOV Power Lines 13
P-90-017 MOV Undervoltage Stem Thrust and Torque 23
P-94-004 MOV Overload Heater Evaluation 14
P-94-005 Motor Stem Thrust Calculation for Gate and Globe Valves 11
P-94-005 Motor Stem Thrust Calculation for Gate and Globe Valves Minor B
Corrective Action 1345764 NRC Information Notice 2008-02: Findings Identified During 06/20/2008
Documents CDBIs
Inspection Type Designation Description or Title Revision or
Procedure Date
1391503 NRC Information Notice 2010-0011: LHSI Operability in 06/23/2010
Mode 4
1788486 Low Margin on Overcurrent Set Points 07/27/2012
1788537 Impact to Plant Procedures due to New Revision to 07/27/2012
Calculation
1952942 2-87-2/A06 as Found Target Test Unsatisfactory 05/14/2014
2196130 2P-10B, RHR Pump Vibration Trend 04/04/2017
209496 Change in 2P-10B RHR Pump Vibrations 06/18/2017
27317 IN 2017-07 Battery Charger Fault Current Test 04/27/2018
239980 Increasing Vibration Trend 2P-10B RHR Pump 12/11/2017
244199 2P-10B Pump Suction Pipe Resonance 01/11/2018
252938 2P-10B RHR Vibrations Post Coupling Replacement 03/07/2018
2340495 0DA-3056A Relief Valve Documentation 01/08/2020
CAP050179 Industry OE - Callaway -Inoperability of Both Offsite Power 09/15/2003
Sources
Corrective Action 02361293 2020 DBAI: SI-850 Electrical Analysis 06/29/2020
Documents 2360746 2020 DBAI Need Review of EOP 1.3 for Both Units 06/23/2020
Resulting from 2360749 NRC Identified Typo in EOP 1.3 Unit 2 06/23/2020
Inspection 2361017 Substandard MOV Design Basis Calculation 06/25/2020
2361018 DBAI 2020 -EC284675 Valve Quality Level Testing 06/20/2020
Requirement
2361545 Potential for Accelerated RWST Draw-Down 07/01/2020
2362062 Review EOP-1.4 for Enhancement 07/07/2020
2362318 No Explicit Design Doc for Local SI-857 Operation 07/09/2020
Drawings 110E017 Sh 1 P&ID Safety Injection System 60
110E017 Sh 2 P&ID - Safety Injection System 66
110E029 Sh 1 P&ID Auxiliary Coolant System Point Beach Nuclear Plant 57
Unit 2
110E035 Sh 1 P&ID Safety Injection System 56
110E035 Sh 2 P&ID Safety Injection System 60
541F091 Sh 1 P&ID Reactor Coolant System 58
541F445 Sh 1 P&ID Reactor Coolant System 52
541F445 Sh 2 P&ID Reactor Coolant System 34
Inspection Type Designation Description or Title Revision or
Procedure Date
8551-1 Containment Isolation Valve 4
E-222201 Diesel Generator Building Piping Arrangement 6
M-219 Sh 1 P&ID Fuel Oil System 51
M-219 Sh 2 P&ID Fuel Oil System Diesel Generator Building 16
M-219 Sh 3 P&ID Fuel Oil System Diesel Generator Building 17
Engineering 257171 Stator Rewind Using Equivalent Materials and Processes by 1
Changes Westinghouse
259510 Emergency Diesel Generator Air Start Motor Replacement 0
(G-01, G-02, G-03, G-04)
2464 Equivalency Needed to Replace the ID-205 Batteries, Inter 0
Rack, Inter Tier and Crossover Cables
273236 Reset SI Accumulator Pressure and Level Alarm Setpoints 0
to Allow for Wider Operating Bands Within Tech Specs
284675 GSI-191 Risk-Informed Unit 1 Modifications; Extend Drain 5
Pan Under Stairway 22, Modify Cavity Drain Line, Convert
Debris Interceptors to Flow Diverters
289692 Update Setpoint Document STPT 17.1 Heating and 0
Ventilation System Section 1.13 Battery Room VAC
System (VNBI) Actuation Setpoints and Remove Reset
Values
290751 Temporary Change in Support of Maintenance Evaluation 0
291259 Y-16 Breaker Replacement 0
291434 RHR Pump Suction Piping Grout Penetration Repair 1
Engineering 2017-0012 Basis for Recovering/Realigning RHR Following a Mode 4 0
Evaluations LOCA
278719 Basis for Mission Time of Emergency Diesel Generators 0
EQCK-PRONTO- Environmental Qualification (EQ) Binder for Marathon 1
001 Electric Hydraulic Pump Unit Motor
Miscellaneous BG EOP-1.4 Background Document - Transfer to Containment Sump 20
Recirculation High Head Safety Injection
CE01175866-01 NRC Information Notice 2010-0011 07/09/2010
EQMR-PRONTO- EQ Maintenance Requirements for Hydraulic Pump Unit 0
MTR Motor
IST Program PBNP Inservice Testing Program 5th Interval 8
Inspection Type Designation Description or Title Revision or
Procedure Date
Document
NP 8.4.17 PBNP Flooding Program 32
VTM 00558 Vendor Manual for Containment Sump Isolation Valves 8
VTM-00176 Basler Electric (Relay)/Westinghouse X-03 18
Operability 000122 Complications with D-09 Charger 2
Evaluations
Procedures AOP-22 EDG Load Management 19
CL 11A G-03 G-03 Diesel Generator Checklist 9
EOP-1 Loss of Reactor or Secondary Coolant 46
EOP-1.3 Transfer to Containment Sump Recirculation - Low Head 57
Injection
EOP-1.4 Transfer to Containment Sump Recirculation - High Head 30
Injection
OI 92A Fuel Oil Ordering, Receipt Sampling, and Offloading 29
OM 4.3.8 Control of Time Critical and Time Sensitive Operator Actions 16
OP 3C Hot Standby to Cold Shutdown Unit 2 17
RMP 9314 1(2)SI-850A/B Maintenance, Static Test, and Adjustment 18
Work Orders 315772 Bus Work Inspection 03/14/2011
368148 2-50G/A52-89 Calibration Ground 03/14/2011
380449 2-50D/A52-89 Calibration 2A-06 Instantaneous Current 03/20/2011
Relay
40412681 125 Vdc Distribution Panel 03/03/2016
40430297-01 TS-31, Unit 2 High/Low Head Safety Injection Check 04/09/2017
Leakage Test
40431018-01 IT-04D, RHR Valve Testing for Unit Operation or Shutdown 04/10/2017
40495025-01 G-03 EDG Operability Test 07/17/2017
40519260-01 G-04 EDG Operability Test 12/18/2017
40526137-01 TS-31, Unit 2 High/Low Head Safety Injection Check 10/21/2018
Leakage Test
40544138-01 IT-04D, RHR Valve Testing for Unit Operation or Shutdown 10/23/2018
40577277-04 Operation of 2P-10B RHR Pump at Test Flow While 03/07/2018
Adjusting Weights Applied to Suction Piping
40635246-01 TS-31, Unit 2 High/Low Head Safety Injection Check 04/02/2020
Inspection Type Designation Description or Title Revision or
Procedure Date
Leakage Test
40635249-01 IT-04D, RHR Valve Testing for Unit Operation or Shutdown 04/20/2020
40635309-01 IT-04A, Train A RHR Pump and Valve Tests in Decay Heat 03/11/2020
Removal Mode
40635609-01 IT-536, U2 Cont Sump B Suction Line Leak Test (RFSD) 03/23/2020
40642212-01 TS-84, G-04 Emergency Diesel Generator Operability Test 12/17/2019
40651478-01 IT 04 Low Head Safety Injection Pumps and Valves Train A 12/10/2019
Unit 2
40651481-01 IT 45 Train A Safety Injection Valves (Quarterly) Unit 2 12/17/2019
40664852-01 IT 04 Low Head Safety Injection Pumps and Valves Train A 03/11/2020
Unit 2
40664855-01 IT 45 Train A Safety Injection Valves Train A Unit 2 03/13/2020