05000348/LER-1983-039, Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-1

From kanterella
Jump to navigation Jump to search
Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-1
ML20076B339
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/10/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076B342 List:
References
NUDOCS 8308190329
Download: ML20076B339 (1)


LER-2083-039, Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-1
Event date:
Report date:
3482083039R00 - NRC Website

text

1 [ R$aiHng Address

  • 4 ' e
  • Alabagna Power Company

,' , [ ..M North 18th Street

'"^ Post Ofhc3 Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6001 ygNPO PE EION o, F. L. Clayton, Jr. AE /'

Senior Vice President g3h3g3 ggy Fhntridge Building g3 pac 17 A 8: 0 6 ~~t= ~ ~~

August 10, 1983 Docket No. 348 Docket No. 364 U. S. Nuclear Regulatory Comraission Office of Inspection and Enforcement Region 11 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant Unit 1 Licensee Event Reports Nos.

LER 83-039/03L-0 and LER 83-024/03X-1 and Unit 2 Li..ensee Event Report No.

LER 83-025/03X-1 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 and FNP Technical Specification 6.9.1.11 to prcvide thirty days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly, hf Y&^

F. L. ClaytonfJr.

  • 's FLCJ r/KWM:nac/F-6 Enclosures xc:. Director, IE (30 copies)

Director, MIPC (3 copies) 8308190329 830010 PDR ADOCK 0500034 8  :

gyTcW'*

f6A b ip