05000348/LER-1983-007, Forwards LER 83-007/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-007/03L-0
ML20079N571
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/25/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20079N574 List:
References
NUDOCS 8303040329
Download: ML20079N571 (1)


LER-1983-007, Forwards LER 83-007/03L-0
Event date:
Report date:
3481983007R00 - NRC Website

text

,

Mening Addrms O.

Al&bima Powdr Company 600 North 18in Street Po'.t Office Box 2641 Bermmgham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

Nn"$' sng *"'

AhllX1111a power v m. am,wrc wem February 25, 1983,

'32

?

pr Docket No. 348 ca

  • T m

m4

..b EN$

p E.5 m

U. S. Nuclear Regulatory Commission Nr Office of Inspection and Enforcement

.8-Region 11 t'

101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 83-007/03L-0 is forwarded with three (3) copies in arr.ordance with FNP Technical Specification 6.4 to provide thirty (30) days written notification of the occurrence.

The delay in the submittal of this LER is due to operations personnel assuming that this incident had been previously reported. Therefore, the incident report was not processed in a timely manner which resulted in the delay of this report.

If you have any questions, please advise.

Yours very truly, F. L. Clay on, J.

FLCJr/KWM:ch Enclosures xc: Director, IE (30 copies)

Director,MIPC(3 copies)

IOFFICIAL COPY 8303040329 830225 DR ADOCK 0500034 7--