05000327/LER-1983-052, Forwards LER 83-052/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-052/03L-0
ML20079Q135
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/05/1983
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20079Q139 List:
References
NUDOCS 8305110373
Download: ML20079Q135 (1)


LER-2083-052, Forwards LER 83-052/03L-0
Event date:
Report date:
3272083052R00 - NRC Website

text

  • .

TENNESSEE VALLEY AUT HORITY

  1. C 6 f A T T A N O O G t, . TENNESSEE 374D1 1750 Chestnut Street Tower II v

Q r~

.; ,1 May 5, 1983 N hh ,

to ' ' [4

_3 p 1 3) 6 {5 Mr. James P. O'Reilly, Director .h-U.S. Nuclear Regulatory Commission Suite 2900

[

101 Marietta Street, NW Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKE1 NO. 50-327 - FACILITY OPERt. TING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/83052 The enclosed report provides details concerning the inoperability of the upper head injection (UHI) system level switches. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.b.

Very truly yours, TENNESSEE VALLEY AUTHORITY

/ ,

'd'6th

_ H. J. Green Director of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, Sequoyah l l

D 030505 d[OyK05000327 S '

s

_ /_? ,;

e O t L

, f (' hfF

, , , - -,- .--