05000313/LER-1983-002, Forwards Revised LER 83-002/03X-1

From kanterella
(Redirected from 05000313/LER-1983-002)
Jump to navigation Jump to search
Forwards Revised LER 83-002/03X-1
ML20072U777
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/30/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20072U780 List:
References
1CAN038309, 1CAN38309, NUDOCS 8304110419
Download: ML20072U777 (1)


LER-2083-002, Forwards Revised LER 83-002/03X-1
Event date:
Report date:
3132083002R00 - NRC Website

text

- J .

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4000 March 30, 1983 1CAN038309 APR 6 1983

~~

Mr. W. C. Seidle, Chief  ;

Reactor Project Branch #2 L_ _ _

U. S, Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 -

License No. DPR-51 Number: 83-002/03X-1 ]E-Gentlemen:

In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.2.d, attached is the subject report concerning leaks in the casing vent for spent fuel pool circulation pumps P-40A and P-408. This is a revision to a previous report submitted February 3,1983.

Very truly yours, ohn R. Marshall Manager Licensing JRM: RJS: rd Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8304110419 830330 PDR ADDCK 05000313 S PDR MEMBER MlOOLE SOUTH UTIUTIES SYSTEM