05000285/LER-2012-019-01, Regarding Traveling Screen Sluice Gates Found with Dual Indication
Letter Sequence Request | |
|---|---|
TAC:D91660, (Approved, Closed) | |
Initiation Administration Questions
Answers | |
MONTHYEARML1135403542011-12-15015 December 2011
[Table View]Environmental Report; Operating License Renewal Stage Final, Attachment E Through End Project stage: Other ML1135303722011-12-15015 December 2011 Callaway, Unit 1, License Renewal Application Project stage: Request ML1135403492011-12-15015 December 2011 Environmental Report; Operating License Renewal Stage Final, Cover Through Chapter 2 Project stage: Other ULNRC-05830, Environmental Report; Operating License Renewal Stage Final, Chapter 3 Through Attachment D2011-12-15015 December 2011 Environmental Report; Operating License Renewal Stage Final, Chapter 3 Through Attachment D Project stage: Other L-12-065, Submittal of Shield Building Root Cause Evaluation2012-02-27027 February 2012 Submittal of Shield Building Root Cause Evaluation Project stage: Request ML12056A0452012-03-12012 March 2012 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML12097A2162012-04-0505 April 2012 Firstenergy Notification of Filing Related to Proposed Shield Building Cracking Contention Project stage: Request ML12115A3762012-04-24024 April 2012 Declaration of Arjun Makhijani in Support of Missouri Coalition for the Environments Hearing Request Regarding Callaway License Renewal Application Project stage: Other ML12138A0372012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1, Submittal of Contractor Root Cause Assessment Report-Section 1 Project stage: Request ML12142A1582012-05-21021 May 2012 Amerens Answer Opposing the Missouri Coalition for the Environments Hearing Request and Petition to Intervene Project stage: Request ML12142A3682012-05-21021 May 2012 NRC Staff'S Answer to Missouri Coalition for the Environment'S Hearing Request and Petition to Intervene Project stage: Request RA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)2012-07-13013 July 2012 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12) Project stage: Request ML12199A3762012-07-17017 July 2012 Memorandum and Order (Ruling on Standing and Hearing Petition Contention Admissibility)- LBP-12-15 Project stage: Request ML12216A0872012-07-17017 July 2012 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 14 Project stage: Request ML12205A5072012-07-23023 July 2012 Intervenors Fourth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking) Project stage: Request ML12214A2642012-07-25025 July 2012 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 Project stage: Request CP-201200875, Report of Changes to the Physical Security Plan (Revision 7)2012-07-26026 July 2012 Report of Changes to the Physical Security Plan (Revision 7) Project stage: Request ML12216A1482012-08-0101 August 2012 7 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan Project stage: Request RBG-47269, Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan2012-08-0202 August 2012 Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Project stage: Request ML12219A2272012-08-0202 August 2012 Duke Energy Physical Security Plan, Revision 18 Project stage: Request ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 102012-08-0303 August 2012 Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10 Project stage: Request ML12216A1192012-08-0303 August 2012 Order Granting Motion for Extension of Time to File an Answer Project stage: Request L-2012-305, 5 to the Physical Security Plan, Cover Letter2012-08-0303 August 2012 5 to the Physical Security Plan, Cover Letter Project stage: Request ML12219A2252012-08-0303 August 2012 Security Plan Change Revision 13 Project stage: Request ASLBP 12-919-06-LR-BD01, NRC Staff Answer to Missouri Coalition for the Environments Motion for Leave to File New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste2012-08-0303 August 2012 NRC Staff Answer to Missouri Coalition for the Environments Motion for Leave to File New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste Project stage: Request ML12219A2282012-08-0303 August 2012 Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 Project stage: Request ML12221A3362012-08-0808 August 2012 Draft RAI on Revision to Security Plan Project stage: Draft RAI ML12229A2872012-08-13013 August 2012 Security Plan, Revision 9 to the Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML12237A0772012-08-23023 August 2012 Draft Request for Information Email - Related to Physical Security Plant (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: Draft RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) Project stage: RAI ML12251A0472012-09-11011 September 2012 Request for Additional Information, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML12255A0742012-09-18018 September 2012 Request for Additional Information, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI 2CAN101202, Cycle 23, Core Operating Limits Report2012-10-0404 October 2012 Cycle 23, Core Operating Limits Report Project stage: Request ML12286A3362012-10-0404 October 2012 (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan Project stage: Request ML12284A0182012-10-0505 October 2012 NRR E-mail Capture - (D91660) Request for Additional Information (RAI) Draft Questions Corporate Security Plans Submitted 7/30/2012 Project stage: Draft RAI ULNRC-05921, Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660)2012-10-18018 October 2012 Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660) Project stage: Response to RAI ML12296A0102012-10-19019 October 2012 NRR E-mail Capture - D91660 - Dominion Physical Security Plan - Request for Additional Information - This Message Is Publically Available and non-sensitive Project stage: RAI ML12296A9302012-10-23023 October 2012 Enclosudraft Request for Additional Information Project stage: RAI ML12305A0432012-10-29029 October 2012 Email Security-Related Request for Additional Information, Review of Revision 10 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12305A0192012-10-30030 October 2012 NRR E-mail Capture - FW: D91660 - NextEra Energy Duane Arnold Physical Security Plan - RAI - This Message Is Publically Available and non-sensitive Project stage: RAI ML12297A3602012-11-0101 November 2012 Request for Additional Information, Review of Revision 14 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: RAI ML12306A5462012-11-0101 November 2012 E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660) Project stage: RAI ML12292A3222012-11-0101 November 2012 Request for Additional Information Regarding Revision 9 to Security Plant, Training & Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installa Project stage: RAI ML12300A0372012-11-0505 November 2012 Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Project stage: RAI ML12300A3222012-11-0505 November 2012 Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12307A3692012-11-0707 November 2012 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI GO2-12-168, Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan2012-11-15015 November 2012 Response to Request for Additional Information Regarding 10 CFR 50.54(P)(2) Changes to the Security Plan Project stage: Response to RAI ML12310A0292012-11-16016 November 2012 Request for Additional Information Related to Physical Security Plan, Revision 16 Project stage: RAI ML12314A3562012-11-20020 November 2012 Request for Additional Information, Round 2, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12335A0112012-11-28028 November 2012 Response to Request for Additional Information Regarding Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 Project stage: Response to RAI 2012-04-24 |
| ML13134A393 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/14/2013 |
| From: | Cortopassi L Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-13-0062 LER 12-019-01 | |
| Download: ML13134A393 (6) | |
Similar Documents at Fort Calhoun | |
|---|---|
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 2852012019R01 - NRC Website | |
text
-- --
-~
DIIIID Omaha PublicPowfIrDIBIrII:I 444 South 1(}h Street Mall Omaha, NE 68102-2247 LlC-13-0062 May 14, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Reference: Docket No. 50-285
Subject:
Licensee Event Report 2012-019, Revision 1, for the Fort Calhoun Station Please find attached Licensee Event Report 2012-019, Revision 1, dated May 14, 2013.
This report is being submitted pursuant to 10 CFR 50.73(a)(2)(v)(B).
No commitments are being made in this letter.
I If you should have any questions, please contact Terrence W. Simpkin, Manager, Site Regulatory Assurance, at (402) 533-6263.
Louis P. Cortopassi Site Vice President and CNO LPC/EPM Irjr Attachment c:
A. T. Howell, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. M. Sebrosky, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector Employment with Equal Opportunity
NRC FORM 366 (10-2010)
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (10-2010)
LICENSEE EVENT REPORT (LER)
(See reverse for required number of digits/characters for each block)
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2013
, the NRC may not conduct or sp onsor, and a person is not required to respond to, th e
information collection.
- 1. FACILITY NAME Fort Calhoun Station
- 2. DOCKET NUMBER 05000285
- 3. PAGE 1 OF 5
- 4. TITLE Traveling Screen Sluice Gates Found with Dual Indication
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.
MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 05000 08 14 2012 2012 - 019 -
1 05 14 2013 FACILITY NAME DOCKET NUMBER 05000
- 9. OPERATING MODE 5
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A) 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)
OTHER 20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)
Specify in Abstract below or in LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET
- 2. Changes were also made to Operating Instruction CW-1, Circulating Water System Normal Operation, to address deficiencies in controlling the circulating water system during design basis conditions.
However, the changes that were made to the procedures identified in 1 and 2 above did not address the prevention of fouling during the closing function of the six external sluice gates or the changes needing to be made to Operating Instruction CW-2. Until the event in this LER (2012-019-0), fouling was corrected by issuing a flood impairment and then having divers clear the fouling. Step 4.1.3 of SO-G-124, Flood Barrier Impairment, Revision 4a, states the following:
If a degraded flood barrier is identified, a Condition Report shall be generated as required per Standing Order SO-R-2 (Condition Reporting and Corrective Action).
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, a Flood Barrier Impairment Permit (FC-1411) shall be implemented until the degraded condition has been resolved.
None of the four remaining LERs reviewed contained the same underlying concern or reason of this event, such as the same root cause, failure, or sequence of events.